ANVILFIELD Try FieldOS

Field glossary · property

SRI / cool roof

SRI, or solar reflectance index, expresses a roof surface's calculated temperature relative to reference surfaces under standard weather conditions. Higher values indicate a cooler surface. The Cool Roof Rating Council explains the scale using black at SRI 0 and white at SRI 100; products can fall outside those points. SRI is dimensionless, not a percentage. A cool-roof submittal needs the product's rating at the age, substrate category and roof slope required by the project.

Solar reflectance index, the combined reflectance and emittance rating used by energy codes and rebate programs for reflective roofs

Used across 2 Anvilfield field guides, most in Roofing.
Updated

What do SRI 0 and 100 mean?

The CRRC's April 2024 SRI factsheet gives the black reference solar reflectance of 0.05 and the white reference 0.80, both with thermal emittance of 0.90. A surface cooler than the white reference calculates above SRI 100. These are comparison points, not limits on product ratings.

An infrared thermometer records temperature under the day's weather and exposure; calculating SRI requires measured solar reflectance and thermal emittance. Use the cool-roof reflectivity guide for the building's heat-balance discussion.

Match the coating to its CRRC directory record

Record the product ID, color, substrate category and rating age from the CRRC listing alongside the delivered product label. Section 3.5.4 of the October 2026 CRRC manual permits liquid-applied coatings to carry separate smooth- and rough-substrate ratings. Products tested on both appear on separate directory lines with substrate suffixes; retain the line matching the submitted application.

Attach that record to the low-slope coating scope or metal restoration scope. Record coating build separately using the mil thickness and yield guide.

Which calculation and weathering method produced the rating?

ASTM E1980-24 is the current publisher edition as of November 5, 2026; its scope covers horizontal and low-sloped opaque surfaces with thermal emittance greater than 0.1. Establish bare metal's emittance before applying it. The CRRC manual, revised October 16, 2026, still specifies E1980-11(2019), Approach I, equations 1 and 3, with a convection coefficient of 12 W/(m²·K) for medium wind.

ANSI/CRRC S100 (2025) requires at least three continuous years of exposure in hot/humid, cold/temperate and hot/dry climates for outdoor-aged ratings, with deposits left undisturbed during testing. Its rack angles are 5 degrees for low-slope or dual-use products and 45 degrees for steep-slope-only products. Rack tilt describes outdoor weathering exposure; code slope categories describe the installed roof.

What SRI does California's 2025 Energy Code require?

California's 2025 Energy Code, Section 100.1, places an exact 2:12 roof in the steep-slope category. The values below summarize Section 140.3(a)1Ai's prescriptive requirements for new nonresidential buildings, excluding hotel/motel guest rooms. Each row offers two paths: meet both reflectance and emittance, or meet SRI. Section 110.8(i)3 requires SRI calculated from aged reflectance using E1980-11(2019), Approach I, equations 1 and 3, at moderate wind.

For existing nonresidential roofs, Section 141.0(b)2B triggers these prescriptive values when replacement, recover or recoating exceeds the smaller of 50% of roof area and 2,000 square feet. The code also provides insulation tradeoffs and exceptions for qualifying heavy roof constructions and areas covered by building-integrated solar systems.

Roof slope and California climate zonesMinimum aged reflectance and emittanceAlternative minimum SRI
Less than 2:12; zones 1 through 160.63 and 0.7575
2:12 or greater; zones 1 and 30.20 and 0.7516
2:12 or greater; zones 2 and 4 through 160.25 and 0.8023

Calculate aged reflectance when tested data is pending

California's 2025 Energy Code, Section 110.8(i)2, uses SRaged = 0.20 + β × (SRinitial - 0.20) when CRRC tested aged reflectance is unavailable. Table 110.8-B assigns β = 0.65 to field-applied coatings and 0.70 to other roofing products. Label the result calculated aged reflectance so it cannot be mistaken for outdoor-weathered data.

Distinctions

CRRC rated versus code compliant
CRRC's Roof Program FAQs state that directory inclusion has no minimum reflectance or emittance threshold. A listing supplies measured properties; the project's code or specification supplies the pass criterion.
SRI versus percentage heat reduction
An increase of 10 SRI points does not mean 10% less absorbed sunlight or 10% less cooling electricity. SRI compares calculated surface temperatures; solar reflectance describes the fraction of incident sunlight reflected.

Field example

A new California office with a 1:12 roof uses the prescriptive reflectance-and-emittance path without an insulation tradeoff. Its coating has CRRC initial reflectance 0.85, emittance 0.85 and pending aged reflectance. The code formula gives 0.20 + 0.65 × (0.85 - 0.20) = 0.6225: emittance passes, but reflectance misses 0.63 by 0.0075. A coating with initial reflectance 0.87 and the same emittance yields 0.6355 and meets both thresholds. The first coating needs a qualifying aged SRI of at least 75 to use the alternative path.

Frequently asked questions

Why does my SRI calculator disagree with the CRRC listing?

Match rating age, calculation method, wind and input precision. Section 2.2.9 of the October 2026 CRRC manual rounds solar reflectance inputs to three decimal places and thermal emittance to two before calculating SRI. Extra laboratory digits can change the result.

Is calculated aged reflectance the same as a Rapid Rating?

No. California's formula estimates aging from the initial rating and product category. CRRC's Rapid Ratings program physically soils and weathers specimens in a laboratory. CRRC's Roof Program FAQs explain that measured three-year outdoor-aged results replace the interim Rapid Ratings.

Sources checked

Where this shows up

Related guides

Next step: Find roof coating accounts

Back to the full field glossary