Field glossary · material
Reinforcement fabric
Reinforcement fabric forms a composite membrane when saturated with its specified liquid roofing resin. Match the reinforcement to that system: Sika Fleece-120 uses 3-inch side laps and 6-inch end laps, while Sika Reemat Premium uses 2-inch overlaps at sides and ends. The lap schedule and embedding sequence belong to the selected product. Adding topcoat thickness does not substitute for the required overlap or remove a bridged wrinkle.
Polyester fabric embedded in the coating at seams, laps, and fastener rows for tensile strength and crack-bridging
Polyester fleece and glass mat use different laps
Sika identifies Fleece-120 as nonwoven, needle-punched polyester reinforcement for specified single-component Sikalastic resins. Sika's Fleece-120 instructions require 3-inch side laps and 6-inch end laps. Record both dimensions in the layout because using the side-lap dimension at roll ends reduces the specified overlap.
Sika's February 2026 Reemat Premium data sheet identifies randomly oriented glass-fiber reinforcement and requires 2-inch overlaps at both sides and ends. The narrower lap belongs to that reinforcement and its listed systems. It is not a substitute instruction for Fleece-120 or for another manufacturer's coating fabric.
Saturation must reach through the reinforcement
For Fleece-120, Sika directs application of about two-thirds of the specified resin quantity beneath the reinforcement and the remaining one-third immediately above it. This sequence wets the fleece from below and completes saturation from above. Applying all the resin to the top of dry fabric changes that process. This two-thirds/one-third allocation divides the application quantity; it is not a resin-component mixing ratio.
Inspect the reinforcement as it is embedded. Pale dry areas, trapped air, wrinkles, and raised lap edges remain meaningful defects even if the next coat hides their color. Dry-fit corners and changes in plane so the material lies against the substrate without bridging a hollow beneath it.
Fabric thickness is not coating dry-film thickness
Sika lists Fleece-120 overall thickness as 0.063 inch. That is a property of the reinforcement, not a dry-film thickness acceptance value for a coating placed over an unreinforced roof. Keep reinforcement properties, resin consumption, and finished-system requirements in separate submittal fields.
Two 50-foot reinforcement pieces joined with Fleece-120's specified 6-inch end lap produce a 99-foot-6-inch continuous run. Include that deduction, side overlaps, and separately cut corners in the coating restoration takeoff. Keep gross roll area and net reinforced area in different columns so a nominal roll quantity does not conceal lap consumption.
Distinctions
- Scrim inside a sheet membrane
- A factory reinforcement embedded within a manufactured sheet is part of that product. Field fabric saturated in liquid resin has its own installation sequence and overlap requirements.
- Separation fabric
- A separation or protection geotextile can keep adjoining materials apart. It does not automatically provide the resin compatibility or reinforced-membrane performance required by a liquid-applied system.
Typical values
| Sika reinforcement | Side lap | End lap | Installation distinction |
|---|---|---|---|
| Fleece-120 polyester | 3 inches | 6 inches | About two-thirds of specified resin below; remaining third immediately above |
| Reemat Premium glass fiber | 2 inches | 2 inches | Use its listed resin and wet-embedding instructions |
Frequently asked questions
Can I use fiberglass instead of polyester reinforcement?
Use the reinforcement listed for the resin and assembly. Sika's glass and polyester products illustrate why the fiber type changes the approved system and lap instructions.