Field glossary · component
Heat exchanger
Four terminal temperatures establish a heat exchanger's approach; flow and fluid properties establish its heat-transfer duty. A countercurrent unit cooling one water stream from 80°C to 50°C while heating the other from 30°C to 60°C has 20°C end approaches despite a 10°C outlet-temperature cross. That cross is compatible with heat transfer because the outlets lie at opposite ends. Diagnose performance with both streams' heat balances and pressure drops.
The sealed metal chamber that transfers heat while keeping flue gas out of the air
Read all four terminal temperatures
Write down hot inlet, hot outlet, cold inlet, and cold outlet before describing an exchanger's approach temperature. For countercurrent flow, the cold-end difference is hot outlet minus cold inlet; the hot-end difference is hot inlet minus cold outlet. Comparing the two outlet temperatures instead measures a different relationship.
A countercurrent exchanger receiving hot water at 80°C and delivering it at 50°C can heat a cold stream from 30°C to 60°C. Both end temperature differences are 20°C, even though the cold outlet is 10°C warmer than the hot outlet. With equal water mass flows and approximately equal heat capacities, each stream changes by 30°C and the heat balance is consistent.
Alfa Laval reports an installed countercurrent Compabloc application with a 2.5°C cold-end approach and a temperature cross of up to 25°C. That published case demonstrates why a positive outlet-temperature cross is compatible with heat transfer. The warmer cold outlet exchanges heat near the hotter hot inlet, not against the hot outlet at the other end.
Calculate Btu/h from flow and fluid properties
Caleffi's idronics 6, Appendix B, calculates exchanger duty in Btu/h as 8.01 times fluid density in lb/ft³, specific heat in Btu/(lb·°F), flow in gpm, and that stream's temperature change in °F. Use the temperature drop for the hot side and the temperature rise for the cold side; the two duties should agree at steady state within measurement uncertainty and heat loss.
Using Caleffi's warm-water properties of 61.8 lb/ft³ and 1.00 Btu/(lb·°F), a 20 gpm stream cooling by 10°F transfers about 99,000 Btu/h. Caleffi's 40% propylene-glycol example uses 64.0 lb/ft³ and 0.91 Btu/(lb·°F); at the same 20 gpm and 10°F change, those properties give about 93,300 Btu/h. Select properties at each circuit's mean operating temperature rather than applying a water factor to glycol.
Distinguish fouling from a change in flow
Alfa Laval's plate-exchanger troubleshooting guidance identifies gradual pressure-drop growth or declining thermal performance with deposited material, low channel-wall shear, and operating conditions that differ from the design. Its recommended diagnosis includes confirming actual flow against design flow before selecting the corrective work.
A single outlet temperature cannot establish a dirty exchanger. If entering temperature, flow, or the other circuit's load changes, the outlet moves even with clean surfaces. Trend the four terminal temperatures, each side's flow, and each side's pressure drop against a clean operating baseline at comparable duty.
Alfa Laval distinguishes immediate pressure-drop or performance changes caused by foreign debris and particles too large for the plate channels from gradual deposit accumulation. The time history directs the inspection: a sudden restriction after piping work presents different evidence from a slow decline through a season.
The waste-heat recovery guide explains matching a heat source to a useful load. The snow-melt guide places the exchanger between building water and the outdoor circuit. In either application, retain both fluids' properties with the design duty so a changed glycol mixture is not mistaken for unchanged test conditions.
Internal leakage is a separation failure
Alfa Laval identifies corrosion or fatigue cracking that makes a hole in a plate as causes of process fluid entering the opposing circuit. The failure can exist without water dripping outside the frame. A contamination complaint therefore calls for testing the separation boundary, not merely looking for an external gasket leak.
Keep the pressure relationship between the circuits in the failure record: it helps explain which fluid entered the other side at the time of the event. Record pressure surges and operating transitions as well as steady pressures when examining fatigue. Cleaning restores a fouled surface's heat transfer; it does not restore a perforated plate's separation function.
Distinctions
- Approach temperature
- The two 20°C end differences in the countercurrent example are approaches. The 10°C outlet cross cannot replace either end difference when describing the temperature available to drive heat transfer.
- Stream temperature change
- The 10°F change used in the 99,000 Btu/h water calculation belongs to one stream. It establishes that stream's duty with its flow and properties, but it does not establish either approach between hot and cold fluids.
Frequently asked questions
Can I use the liquid-side duty calculation to test a furnace exchanger?
The gpm calculation applies to a measured liquid stream with known properties. A furnace evaluation needs the appliance's combustion-side procedure and airflow data; a liquid pressure test does not establish combustion containment. Identify the appliance and its test method in the gas-furnace service record.
Sources checked
Also defined as
- Datacenter: The interface, often a plate type, that passes heat between the data center loop and the reuse loop without mixing the fluids
- The barrier that isolates the glycol snow-melt loop from the boiler water