ANVILFIELD Try FieldOS

Field glossary · measurement

Temperature rise

A furnace with 125°F supply air and 70°F entering air has a 55°F temperature rise, equivalent to a 30.6°C temperature interval. Carrier's 59TP6C procedure checks stable low and high heat separately with the blower door installed. Keep the measured rise beside the furnace's plate limits. On a transformer schedule, rise instead describes winding heating above ambient; Schneider's HF designation pairs 115°C average winding rise with Class 220 insulation.

Supply minus return air temperature on heating, held inside the nameplate range

Used across 4 Anvilfield field guides, most in HVAC.
Updated

Measure furnace rise with the cabinet closed

Carrier's 59TP6C installation instructions, revision A of June 2023, require the blower door to be installed during temperature-rise measurements because opening it changes static pressure and airflow. A reading taken through an open blower compartment describes a different air system from the one the owner operates.

The same Carrier instructions provide separate checks with the furnace held in low heat and high heat, after supply temperature stabilizes. Record both operating states on a staged furnace. A single pair captured during the transition combines changing burner output, blower response and stored heat in the exchanger.

Carrier recommends operating the 59TP6C at the midpoint of its nameplate rise range or slightly above. That recommendation identifies a preferred location within the model's permitted band; it does not supply the band for another furnace. Retain the plate limits with the results from the furnace operating check.

Why a 55°F rise can read 53°F or 57°F

Compare the probes together in the same stable air before separating them across the furnace. Agreement checks relative offset at that temperature; it does not establish accuracy over the full temperature span. Keep both absolute readings in the record so a later instrument check can explain a shifted result. The test-instrument guide supplies the broader instrument checks.

Carrier's 59TP6C control cycles through supply-air temperature, return-air temperature and their difference after its (t°) display feature is enabled. When displayed supply temperature disagrees with an independent duct measurement, the instructions direct moving the supply sensor farther from the furnace or after a duct bend. Compare the automatic display with the survey readings before attributing their disagreement to the blower setting.

Probe offsetsDisplayed supplyDisplayed returnReported rise
Both correct125°F70°F55°F
Supply +1°F, return -1°F126°F69°F57°F
Supply -1°F, return +1°F124°F71°F53°F

Convert a temperature interval without the 32-degree offset

NIST SP 1038 converts a Fahrenheit temperature interval to Celsius or kelvin by dividing by 1.8, without subtracting 32. The 55°F rise above is therefore 30.6°C, rounded, even though 55°F as an absolute temperature is 12.8°C. Label a converted result as a rise so it cannot be mistaken for a supply-air setpoint.

Read transformer rise and insulation as separate ratings

Schneider Electric's transformer nomenclature reference FA109657, updated October 7, 2024, assigns HF to 115°C average winding rise with Class 220 insulation and HB to 80°C average winding rise with that same insulation class. Those two catalog selections have different rise ratings despite sharing an insulation rating.

Copy the complete suffix into the transformer schedule and keep separate columns for winding rise and insulation class. A cabinet surface-temperature reading does not measure the average of the internal windings. The dry-type transformer guide covers equipment selection; the suffix resolves which thermal rating was actually ordered.

Distinctions

Supply-air temperature
An absolute outlet reading. The same supply temperature can produce different rises when entering-air temperature changes.
Transformer insulation class
A separate thermal designation from average winding rise. Schneider uses Class 220 for both its HF 115°C-rise and HB 80°C-rise transformer selections.

Field example

At the 125°F supply and 70°F return conditions above, equal +1°F offsets on both probes still give 55°F of rise. Opposite offsets change the difference by 2°F, as the table shows. A side-by-side probe comparison finds their disagreement; a calibration check is needed to establish the absolute temperatures.

Frequently asked questions

Can I use the room thermostat as the return-air temperature?

Use the air entering the heating section. Return-duct heat transfer, air leakage and outdoor-air mixing can make that temperature different from the room thermostat's reading.

Should I average the low-fire and high-fire rise?

Report each stable stage separately against its applicable limits. Averaging hides a stage that operates outside its permitted range.

Sources checked

Also defined as

  • Electrical: The increase over ambient from PoE heating; TSB-184-A targets about 15 degree C for the center cable
  • Electrical: Average winding rise above a 40 C ambient at full load, commonly 80, 115, or 150 C

Where this shows up

Related guides

Next step: Track school heating projects

Back to the full field glossary