ANVILFIELD Try FieldOS

Field glossary · measurement

Latency

Latency is elapsed time between defined events in a communication path. State the endpoints and measurement direction before quoting a value: one-way packet delay, round-trip delay, and application response time include different work. A useful latency result also identifies packet size, traffic class, load, clock uncertainty, and how lost packets were treated.

Delay set first by the speed of light in fiber, about 5 microseconds per kilometer one way, the hard limit for replication and training

Used across 2 Anvilfield field guides, most in Datacenter.
Updated

One-way delay needs two trustworthy clocks

IETF RFC 7679, published in January 2016, defines one-way IP packet delay from the first bit sent at the source to the last bit received at the destination. That boundary includes the packet's transmission time; it is broader than propagation through the fiber alone.

RFC 7679 identifies source-to-destination clock synchronization error as a contributor to one-way measurement uncertainty. If the destination clock is 0.4 ms ahead, a real 1.0 ms journey appears to take 1.4 ms before other measurement errors. Record clock synchronization and timestamp location with the test results rather than subtracting a convenient assumed offset.

Why half of ping time can misstate the forward path

IETF RFC 2681 explains that forward and reverse Internet paths can differ and can experience unequal queuing even when their routes match. A round-trip value therefore combines two directional performances and cannot establish either one individually.

A path taking 2 ms outbound and 8 ms back produces a 10 ms round trip when response processing is negligible. Dividing by two reports 5 ms, which describes neither direction. Include the responding device's turnaround time in a real ping result. Match the DCI transport acceptance test to the direction, endpoints, and packet type named in the service commitment.

Keep packet loss in the latency report

RFC 7679 assigns undefined delay when the packet does not arrive within the selected loss waiting time. Removing those packets from the report and presenting only successful arrivals makes a failing service look faster than the complete observation supports.

In 1,000 probes, 990 replies at 1 ms and 10 timeouts describe 1% loss alongside the successful-packet delay. Reporting only a 1 ms average hides the missing responses. Preserve the loss threshold, sample count, test duration, load conditions, and delay distribution. Minimum delay helps expose the path floor; upper percentiles show the slower portion of observed service.

Distinctions

Network versus application latency
Application response includes endpoint processing and application behavior in addition to network transit. A fast packet test does not establish a fast transaction.

Field example

A 1,500-byte packet requires 12,000 bit times for serialization. That is 12 microseconds at 1 Gb/s and 1.2 microseconds at 10 Gb/s, before adding link overhead, propagation, switch processing, or queues. RFC 7679 measures from the first bit sent to the last bit received, so retain packet size when comparing one-way results.

Frequently asked questions

Should I report average latency or the 99th percentile?

Report the statistic the service objective specifies, together with sample count and loss. Average delay summarizes the observation; a percentile describes the fraction of packets meeting a delay bound.

Sources checked

Also defined as

  • Round-trip signal delay between users or sites, in milliseconds, scaling with distance and relevant only to some workloads

Where this shows up