Overload

A 32 A motor drawing 40 A continuously is carrying 125 percent of nameplate current, an overload duty that must be distinguished from the relay protecting it. OSHA defines overload by excessive operating duty and resulting heat, and excludes short circuits and ground faults. In motor-service shorthand, the relay is also called an overload. Its FLA adjustment and actual trip threshold are separate quantities, so applying an extra percentage at the dial can misconfigure protection.

The device that protects the motor from running too hot, set to 115 or 125 percent of nameplate FLA

Used across 2 Anvilfield field guides, most in Electrical.
Updated

An FLA adjustment and a trip threshold are separate quantities

Schneider Electric directs users of TeSys T to set FLC1 to the motor nameplate full-load amperes and not above that value. Schneider identifies the TeSys T trip point as 112 percent of FLC1. Those are product-specific instructions, so a code calculation expressed as a maximum protective threshold must not automatically become the value entered in an FLA parameter.

For a 32 A motor, entering FLC1 = 32 A corresponds to a nominal 35.84 A trip point under that stated characteristic. Entering 40 A after multiplying the nameplate by 1.25 instead moves that point to 44.8 A. The error comes from applying an allowance twice. The time-current curve still determines when the relay operates; reaching the stated current does not imply an instantaneous trip.

Read the trip-class test current and the starting temperature

Schneider's published LRD and GV test guidance places the cold-state Class 10A operating time between 2 and 10 seconds at 7.2 times the current setting. A 32 A setting puts that reference point at 230.4 A. "Class 10A" therefore does not promise a ten-second trip at every overload magnitude.

IEC 60947-4-1:2023 is the fifth edition of the contactor and motor-starter standard; IEC's current copy includes the March 2026 corrigendum. Keep the applicable product curve with its test-current multiple and cold or hot condition. Comparing a timed start against the wrong reference point can make a correctly operating relay look defective. The motor-protection guide covers broader relay selection.

What the test button and reset selector actually establish

Schneider's TeSys D guidance identifies H as hand reset and A as automatic reset on the selector beside the adjustment dial. Preserve that selector position with the parameter record. Reset behavior determines what the control circuit can do after a trip; it does not establish the current-sensing calibration.

Schneider Electric's NEMA Type 9065 FAQ says the TEST action should stop the motor. For that installed circuit, observe the motor response as well as the relay indication; moving a test mechanism by itself does not prove that the contactor opened. A timed current test separately addresses the sensing characteristic. Record the motor nameplate, relay model, current parameter, trip class, reset position, and the actual result of each test.

Distinctions

Overload current setting
A setting labeled FLA or FLC can be an input to a thermal model. Its numerical value is not necessarily the current at which the finished device trips.
Short circuit or ground fault
OSHA 29 CFR 1910.399 separates these fault conditions from overload. A relay's overload function and a fuse or breaker's fault-clearing duty must both be identified in the motor circuit.

Frequently asked questions

Should I always set an overload to 125 percent?

Use the device's specified adjustment method. TeSys T takes nameplate FLA at FLC1 and incorporates its stated trip point internally.

Does pressing TEST prove the relay trips at the right amps?

On the Schneider Type 9065 circuit, TEST should stop the motor; that observed stop verifies the control response. It does not measure the current pickup or trip time, which require their own test.

Sources checked

Also defined as

  • Current above the circuit rating in the normal path, a slow rise over time