Field glossary · component
LSIG
On an LSIG breaker, the long-time (L), short-time (S), instantaneous (I), and equipment ground-fault (G) settings require that model's multiplier bases and delay reference currents to become usable test values. A short-time value multiplied by long-time pickup can represent fewer amperes than the same multiplier on the instantaneous dial. Record actual pickup amperes beside each dial position so the distinction survives transfer to a study or test sheet.
Long-time, short-time, instantaneous, and ground-fault adjustable settings on an electronic trip unit
Read the multiplier printed beside each dial
Schneider Electric's 2024 bulletin 48049-136-06 uses Ir, the long-time pickup, as the short-time multiplier base on MicroLogic 5.0A and 6.0A units; their instantaneous dial uses sensor rating In. This is model-specific: the bulletin's 2.0A instantaneous function instead references Ir. Identify the trip-unit model before copying a multiplier into the study.
For the MicroLogic 6.0A calculation below, use an 800 A sensor and the standard rating plug's 0.8 long-time setting. Show each multiplication in amperes on the protective-device study, rather than exporting three unlabeled dial numbers.
| Function | Selected setting | Calculated pickup |
|---|---|---|
| Long-time | 0.8 x 800 A sensor | 640 A |
| Short-time | 5 x 640 A Ir | 3,200 A |
| Instantaneous | 8 x 800 A In | 6,400 A |
A long-time delay is measured at a stated current
Schneider's 2024 MicroLogic delay table references tr to six times Ir. With tr set to 8 seconds, the table gives a nominal cold-state delay of 200 seconds at 1.5 times Ir, with a 0 to -20 percent tolerance at that current. That is a 160 to 200 second table band, not an eight-second expectation at every overload.
ABB's Ekip C Dip LSIG instructions use another reference: the shown 100 A-unit example sets I1 to 80 A and t1 to 12 seconds at 240 A, which is three times I1. Copying a delay number between those products without its reference current changes the meaning of the setting.
Keep curve options and operating state with the numbers
The MicroLogic bulletin separates the short-time I-squared-t on and off characteristics. A pickup and delay pair without that curve option is an incomplete settings record. The selective coordination plot must represent the curve actually selected in the breaker.
Schneider also describes thermal memory and directs a minimum 15-minute wait after tripping when checking times, unless the appropriate test kit defeats thermal imaging. A repeated test on a thermally remembered overload can differ from a cold-start result without a changed dial. Record the test state, trip-unit model, sensor, rating plug, settings, curve options, and any maintenance-mode state.
Distinctions
- Frame rating
- The frame's maximum construction rating does not automatically equal the installed sensor or active long-time pickup.
- LSI
- LSI omits the G function. An alarm display or residual-current meter does not by itself add a ground-fault trip function.
Frequently asked questions
Does turning instantaneous off guarantee coordination?
No. The complete breaker can retain fixed self-protection functions, and the remaining curves and equipment withstand still govern the coordination result.
Which settings should the test sheet show?
Record each function's actual pickup amperes, delay reference current, curve option, and enabled state. Include the model and rating components that give the dial values their meaning.
Sources checked
Also defined as
- Datacenter: Long-time, short-time, instantaneous, and ground-fault functions of an electronic breaker trip unit, each with its own pickup and delay
- Long-time, short-time, instantaneous, ground-fault adjustable trip functions