Selective coordination

Selective coordination requires a faulted circuit to disconnect without losing its upstream supply, demonstrated for the actual devices and current range. An 18 kA breaker-pair selectivity limit covers a 12 kA short-circuit level but not 20 kA, even if both breakers can interrupt 20 kA. Check overloads and ground-fault protection separately when the manufacturer's table covers only short circuits; a passing table comparison is one part of the study.

Only the OCPD nearest the fault opens, leaving every upstream device closed, across the full range of available overcurrents

Used across 3 Anvilfield field guides, most in Electrical.
Updated

Read the scope before using the coordination table

Schneider Electric labels bulletin 0100DB0501 as short-circuit data and excludes overload coordination, fuse coordination, motor and transformer protection, and coordinated ground-fault protection. Mark each exclusion on the study's evidence schedule. The remaining analyses still need their own curves or application data after a breaker-pair table passes.

The bulletin also explains why independent time-current curves can understate the short-circuit selectivity achieved by a particular breaker pair: the downstream device changes the current that reaches the upstream device. Apparent curve overlap is therefore a reason to obtain the manufacturer's combination data, not to invent an unsupported coordination limit.

A coordination limit belongs to a voltage and configuration

Schneider's table instructions require system voltage and available short-circuit current, and warn that a system X/R ratio above the test ratio requires adjustment when comparing the fault level with tabulated values. Record the exact frames, sensors, trip units and settings along with the table revision. An ampere rating alone does not identify the tested combination.

Table 1 of Schneider Electric's bulletin 0100DB0501 gives an 18 kA selectivity limit for a 250 A J-frame Mission Critical main with 15 through 125 A E-frame branches at 240 V, requiring a main rating at least twice the branch rating. A calculated 12 kA fault level fits that limit; a revised supply producing 20 kA exceeds it, even when the selected breakers retain adequate interrupting ratings. Carry a utility or transformer change into the coordination review.

Use the coordination study workflow to carry revised fault calculations into the device schedule. Record the voltage, available current and qualifying settings beside each table result so a later equipment substitution has an identifiable comparison to repeat.

For current-limiting fuses, compare clearing energy with melting energy

Mersen's Electrical Power Catalog explains that high-fault fuse selectivity requires the downstream fuse's total clearing I²t to be less than the upstream fuse's melting I²t. Total clearing includes the downstream fuse's arcing interval; comparing only the two melting values omits part of the energy passed upstream.

Mersen also notes that its time-current curves stop at 0.01 second, so curve separation alone cannot establish performance below that boundary. Use the manufacturer's selectivity data for the actual fuse families and voltage. A ratio taken from a different family does not inherit the same result.

Distinctions

Coordination limit versus interrupting rating
The coordination limit describes a combination remaining selective. The interrupting rating describes a device or rated combination interrupting available fault current safely.

Frequently asked questions

Does a series rating establish selective coordination?

No. Schneider's bulletin treats series ratings and selectivity as separate results. A series rating establishes interrupting capability for a tested combination; it does not establish that the upstream device remains closed while the downstream device clears.

Sources checked

Also defined as

  • Datacenter: Full selectivity across the whole fault range, so only the overcurrent device immediately upstream of a fault operates and every device above it holds
  • Overcurrent devices selected so only the device nearest a fault opens, required on emergency and legally required systems