ZSI

ZSI means zone-selective interlocking, a trip-unit restraint scheme whose commissioning record includes factory jumpers as well as interbreaker wiring. On Schneider's MicroLogic A implementation, an incoming downstream signal or a self-restraint jumper can hold an upstream function on delay. When that function detects an overcurrent without restraint, it clears without intentional delay. Record the jumper state, protection channel and delay setting so the test establishes which condition produced the measured response.

Zone-selective interlocking; breakers signal each other so the upstream device trips fast only for a fault in its own zone

Used across 3 Anvilfield field guides, most in Electrical.
Updated

Factory self-restraint changes the meaning of an unwired input

Schneider Electric's current MicroLogic A bulletin, 48049-136-06 revision 04 dated February 2024, identifies factory jumpers on terminals Z3, Z4 and Z5 that self-restrain short-time and ground-fault protection. Its ZSI activation instructions require removal of those jumpers. Use that model-specific instruction to reconcile the terminal drawing with the physical jumper arrangement.

Separate two commissioning defects in the record: a retained jumper can impose delay when fast operation was expected, while a missing restraint connection can remove delay when downstream selectivity was expected. The observed trip time alone does not identify which path supplied or removed restraint. Record the source and receiver terminals and the input state with the test result.

Delay and I²t settings still govern selectivity

Schneider's Micrologic A instructions recommend I²t OFF for ZSI because I²t ON can cause a restrained upstream trip unit to operate sooner than its published curve indicates. The same instructions state that setting short-time delay or ground-fault delay to zero eliminates selectivity for that circuit breaker. Wiring alone cannot restore a delay that has been set to zero.

Capture the commissioned settings alongside the GFPE test record. A ground-fault restraint result does not demonstrate the short-time channel, or the reverse. Keep the function under test explicit so a passing result is not extended to an untested input.

What the restraint test proves, and what it leaves to the study

Schneider's separate short-circuit coordination bulletin 0100DB0501 excludes coordinated ground-fault protection from its breaker-pair tables. A table approval and a ZSI functional test thus establish different parts of the protection design. Preserve both records with the final settings rather than replacing one with the other.

For each function, identify the restraint source, receiving input, intended fault zone and response with restraint present and absent. Keep those observations with the study's final settings and arc-energy calculation. The test establishes the installed logic; the study uses the resulting clearing behavior to calculate protection performance.

Frequently asked questions

Does an open ZSI wire always leave the breaker in its normal delayed mode?

No. On the cited Micrologic implementation, an active function without restraint trips without intentional delay. A self-restraint jumper produces a different condition and must be identified separately.

Sources checked

Also defined as

  • Zone-selective interlocking, a restraint signal between trip units that speeds clearing of in-zone faults
  • Zone-selective interlock, a restraint signal so the device nearest the fault clears first