Pump curve
A pump curve plots the head a pump adds against flow for a stated speed, impeller diameter and test liquid. On a centrifugal-pump chart, flow is normally horizontal and head vertical; companion curves show efficiency, shaft power and suction requirements. Overlay the installation's system curve to locate the operating point. A point below the published line indicates lost performance only after speed, liquid properties and gauge locations are accounted for.
The plot of pressure against flow for a fire pump, defined by the churn, 100 percent, and 150 percent points
Find the operating point on the pump and system curves
Hydraulic Institute's Data Tool locates the operating point where the pump and system curves cross. Mark that intersection for the installed speed and impeller, then compare its flow and head with the requested duty. A duty written on a schedule is a selection target; the intersection shows what the connected system delivers.
In a system with a manually adjusted throttling valve, opening the valve reduces resistance and moves the operating point toward higher flow on the same pump curve. A speed change moves the pump curve itself. Hydraulic Institute's combined-curve tutorial shows these as separate changes, so record valve position as well as speed when explaining a capacity change.
Match the curve to the installed pump
Hydraulic Institute distinguishes a family selection chart from a published model curve and a certified curve for the purchased pump and impeller trim. Retain the curve number, revision, rotational speed and impeller diameter. A family envelope identifies possible selections; its boundary is not a performance line for the installed assembly.
Photograph the nameplate and retain the impeller record when replacing a hydronic pump. A housing model shared by several trims does not identify which hydraulic curve belongs to the equipment. Record running speed alongside the measured flow and head so a later comparison uses the same configuration.
Convert gauge pressure into the correct liquid head
Hydraulic Institute's Data Tool gives pressure head in feet as 2.31 times pressure in psi divided by liquid specific gravity. For suction and discharge taps at equal elevation and equal pipe velocity, apply that conversion to their pressure difference. Specific gravity is the liquid density divided by water density.
With a 20 psi pressure rise and specific gravity of 1.10, the pressure-head contribution is 2.31 × 20 / 1.10 = 42.0 ft. Treating that liquid as water produces 46.2 ft, overstating the result by 10%. The error follows the density assumption even when both gauges read correctly.
DOE's Improving Pumping System Performance, second edition, separates pressure, elevation and velocity contributions to total head. Unequal tap elevations or different suction and discharge pipe diameters require those additional terms. Record the tap geometry before comparing a pressure-derived point with a total-head curve.
Read NPSHR and the operating-region limits
Hydraulic Institute's explanation of ANSI/HI 9.6.1-2024 bases NPSH margin on manufacturer-published NPSHR, which must equal or exceed the tested NPSH3. NPSHR means net positive suction head required. NPSH3 marks a 3% loss of total head, or first-stage head on a multistage pump, from cavitation. Preserve the curve's stated label in the suction calculation.
Hydraulic Institute defines NPSHA at the first-stage impeller datum using absolute total suction head minus the liquid's vapor-pressure head. A suction gauge reading alone does not supply that result. For a published NPSHR of 12 ft and calculated NPSHA of 14 ft at the same flow, the margin is 2 ft. Compare it with the application's specified margin; 2 ft is the calculated difference, not a recommended allowance.
ANSI/HI 9.6.3-2024 defines the preferred operating region using pump specific speed and describes the factors manufacturers use to establish the allowable operating region. Carry those boundaries onto the working curve. A plotted head-flow line alone does not establish acceptable continuous operation at every point along it.
Why duty-point horsepower can undersize the motor
Hydraulic Institute's published selection example requires 25 to 30 hp at 1,000 gpm and 100 ft of head, but identifies a possible 40 hp motor requirement to avoid overload at the curve's end. The selected duty is only one point in the power check.
Trace shaft power across the permitted operating range, including the higher-flow condition reached when resistance falls. Keep that power separate from electrical input: Hydraulic Institute notes that pump-curve power excludes motor and drive losses. A wattmeter upstream of the drive measures a different boundary.
Distinctions
- Requested duty versus best efficiency point
- Hydraulic Institute's selection example operates at 85% pump efficiency at its requested duty and 86% at the best efficiency point, or BEP. Record the BEP flow separately when comparing two selections at the same requested duty.
- Pump head versus system discharge pressure
- At unchanged flow, liquid density and tap geometry, suction/discharge readings of 50/80 psi and 40/70 psi both give a 30 psi pressure rise. The discharge gauge falls 10 psi while total pump head stays constant.
Frequently asked questions
Can I use a water curve for a thicker liquid?
Density conversion fixes the pressure-to-head relationship, but viscosity also changes pump performance. DOE identifies fluid viscosity and operating temperature as selection inputs; obtain the manufacturer's corrected curve for the liquid and temperature being pumped.
Which curve belongs in a fire-pump report?
Hydraulic Institute notes that a certified curve can identify the hydraulic test standard and acceptance grade as well as the purchased impeller trim. Carry those identifiers from fire-pump selection into the acceptance-test record; a family-selection screenshot drops pump-specific test information.
Sources checked
- Hydraulic Institute: Pump FAQs, selection charts, certified curves and shaft-power example
- Hydraulic Institute Data Tool: System Curves, pressure-head and specific-gravity equations
- Hydraulic Institute Data Tool: Combined Pump and System Curves, operating point, manual throttling and speed changes
- U.S. Department of Energy: Improving Pumping System Performance, second edition, May 2006, Fluid Energy and Fluid Properties
- Hydraulic Institute: 2024 updates to ANSI/HI 9.6.1, published March 18, 2025
- Hydraulic Institute: ANSI/HI 9.6.3, scope of preferred and allowable operating regions
- Hydraulic Institute standards catalog: current 2024 editions of ANSI/HI 9.6.1 and 9.6.3
Also defined as
- Datacenter: Pressure plotted against flow; the field curve is compared to the manufacturer's certified shop-test curve