Re-entrant corner
A re-entrant corner concentrates stress at a material-side angle greater than 180 degrees; a square blockout leaves 270 degrees of concrete and 90 degrees of opening. Mark that material-side angle when checking a slab plan. It identifies a location that needs a joint or reinforcement detail even before placement, and distinguishes a notch from an ordinary outside corner.
An inside corner where stress concentrates and a crack tends to run out at about 45 degrees
Find the corner and its joint endpoint on the plan
Mark every inward turn on the latest outline, including openings added after the original joint plan. Beside each mark, record the intended joint endpoint and the drawing reference for any corner reinforcement. A sawcut ending short of the vertex leaves a concrete bridge between the opening and the planned separation; that gap belongs on the layout correction list.
NRMCA's CIP 6, revised in 2014, gives a 45-degree orientation for square column openings relative to the contraction-joint grid. Label both the square's side and its diagonal on the layout sketch: the diagonal controls the space between opposing joint endpoints. Use the joint-layout guide for the surrounding panel layout and the crack identification guide when documenting an existing crack.
Check for restraint below the blockout
Record the slab underside elevation and footing top elevation at a column blockout. Their difference is the space available for the separation detail. A filler visible around the column does not show whether the slab also contacts the buried footing shoulder; include that interface in the pre-pour photograph.
NRMCA's CIP 6 recommends at least 2 inches of sand over a footing to prevent bonding between the footing and floor slab. For a specified 6-inch slab above that layer, the footing top must be at least 8 inches below the finished slab surface. Measure both layers independently so the sand does not consume concrete thickness.
Distinguish a model stress peak from a field measurement
Dlubal's May 2026 reinforced-concrete guidance identifies a likely finite-element singularity when a finer mesh produces a higher local stress peak over a smaller area. Opening corners are among the locations it identifies. A printout of that peak does not supply a crack width or a reinforcement quantity.
For a calculation review, retain the modeled corner radius, mesh size, and result-averaging area with the stress output. Dlubal describes averaging over an area selected on engineering grounds and modeling rounded or chamfered corners as available treatments. The construction drawing must still identify the geometry and reinforcement to build.
Distinctions
- Outside corner
- A square slab's external corner contains 90 degrees of concrete. A square opening's corner contains 270 degrees of surrounding concrete. The material side determines the name.
- Aspect ratio
- Aspect ratio describes overall panel proportions. A notch remains a re-entrant corner even when the panel's overall length and width are equal.
Field example
A square column blockout has 24-inch sides and a diagonal of 24 × √2 = 33.94 inches. With the opening centered on intersecting joint lines and rotated 45 degrees, each vertex lies 16.97 inches from their intersection. Marking only 12 inches from the intersection would create a 24-inch point-to-point diamond with sides of 16.97 inches, materially smaller than the specified opening.
Frequently asked questions
Is an inside corner re-entrant before it cracks?
Yes. The term identifies the concrete geometry. A crack map records damage at that location; a blockout or joint drawing identifies the location before the pour.
Does rotating a square blockout eliminate its re-entrant corners?
A rotated square still contributes four 270-degree material-side angles. The corner count stays the same; the layout dimensions change direction. Label side and diagonal dimensions separately so the rotation preserves the specified opening size.