In laser scanning, registration brings separate scans into a common coordinate frame by solving their relative positions and orientations. The resulting cloud needs both a fit-quality record and independent checks. A low average registration error can hide a weak doorway connection, corridor drift or an offset from project control. Name the software metric and inspect local alignment before using the cloud to accept a dimension.

Stitching individual scans into one aligned cloud, target-based or cloud-to-cloud, reported with a registration error

Used across 2 Anvilfield field guides, most in Datacenter.
Updated

Read the metric definition before comparing error reports

Leica defines Cyclone REGISTER 360 PLUS Bundle Error as an average of cloud-to-cloud and target errors. Its documentation says Cyclone CORE calculates Bundle Error differently, using vertex and global errors. The same registration can therefore produce different displayed errors in the two products without the measured points having moved.

Write the software version, metric name and units beside the result. A procurement requirement that says only registration error below 3 mm leaves the calculation undefined. Specify which reported quantity is being accepted and what independent checks accompany it. That turns the threshold into a reproducible review rather than a contest between software labels.

Find the weak link hidden by the bundle average

Leica's error-reporting guidance treats overlap and geometric strength as separate diagnostics. Strength reflects how geometry constrains the fit across the coordinate axes; abundant points on a long flat wall do not provide the same directional information as varied surfaces.

Inspect individual links at doorways, repeated structural bays and the ends of long corridors. Use slices through recognizable surfaces to find doubled edges or a gradual divergence. A fit dominated by repeated or planar geometry needs different evidence from a fit constrained by distinct surfaces in several directions. Keep the screenshots with the corresponding link identifiers.

Compare the fit with a check that did not create it

Use a surveyed check point withheld from the registration fit. Reference coordinates of E = 100.000 m and N = 200.000 m compared with cloud coordinates of E = 100.006 m and N = 200.008 m produce east and north discrepancies of 6 and 8 mm. The horizontal discrepancy is sqrt(6 squared + 8 squared) = 10 mm. This is a two-dimensional check; elevation needs its own comparison.

A 2 mm bundle result and a 10 mm independent horizontal discrepancy can both be correct reports of different quantities. Keep the check point out of the fit when judging the delivered coordinates against it. Otherwise it becomes another fitting constraint rather than an independent check.

Leica lists bundle, link and target error tables, a quality matrix and slice views among the deliverables in its registration report. Supply the relevant local results and the withheld checks with the reality-capture handoff, rather than reducing the handoff to one favorable average. Identify the project coordinate system and any applied transformation so the next reviewer can repeat the comparison.

Distinctions

Georeferencing
Registration relates scans to one another. Georeferencing ties their common frame to project or geographic control; internally aligned scans can still have the wrong site position.
Point-cloud density
Density counts how closely surfaces are sampled. More samples do not establish a correct transformation.
Warranty registration
Warranty registration records equipment and coverage information. It is a separate administrative use of the word, with no scan-alignment meaning.

Frequently asked questions

Does a low bundle error prove project-coordinate accuracy?

It proves only what that software metric measures about the fit. Check independent control and local geometry to establish how the delivered coordinates agree with the project reference.

Sources checked

Also defined as

  • Plumbing: Recording the install with the manufacturer to validate or extend coverage and start the clock

Where this shows up

Next step: Search retrofit coordination projects

Back to the full field glossary