Point cloud

A point cloud is a collection of measured three-dimensional positions, usually stored as X, Y and Z coordinates with optional color or intensity. Point density counts samples per area or volume; point spacing measures the distance between samples. Neither establishes positional accuracy. A useful handoff identifies units, coordinates, spacing, accuracy and registration evidence so the receiving technician can decide whether the data supports the required dimension.

A dataset of millions of measured 3D points (X, Y, Z, often color and intensity) forming a dimensional shell of every visible surface

Used across 2 Anvilfield field guides, most in Datacenter.
Updated

Specify point spacing separately from point accuracy

Leica publishes RTC360 scanning resolutions of 3, 6 and 12 mm at 10 m, separately from its 3D point-accuracy figures. Resolution determines how finely the surface is sampled. A small feature can fall between samples even when the points that do strike the surrounding surface are accurate.

On a flat surface sampled as a square grid, density in points per square metre is approximately 1 divided by spacing in metres squared. The following counts compare sampling only; a denser cloud still carries the instrument and registration errors of its capture.

Square-grid spacingApproximate points per square metreDensity relative to 6 mm
6 mm27,7781
3 mm111,1114

Carry range and test conditions with a millimetre claim

Leica's RTC360 data sheet specifies 3D point accuracy of 1.9 mm at 10 m, 2.9 mm at 20 m and 5.3 mm at 40 m, at 89 percent target reflectivity and a 68 percent confidence level. The range and conditions belong with the claim. A single accuracy number detached from them is not the published specification.

For a fit-up decision, locate the relevant surface in the cloud, identify the capture distance and inspect coverage on both sides of the intended measurement. Keep a section showing the actual points used. A rendered color image can hide a thin surface, edge noise or an unsampled gap that matters to the dimension.

Exchange the geometry without losing its units

ASTM E2807-11(2026) defines the E57 Version 1.0 exchange format for 3D point data, associated attributes and 2D imagery. ASTM states that the standardized quantities use SI units. The format carries data; it does not certify that a particular scan achieved a project tolerance.

Include the coordinate-system description, origin, units and transformation history with the export. Open a test file in the receiving application and measure a known separation before releasing the full dataset. Reading coordinates expressed in millimetres as metres scales a 2 m separation to 2,000 m, which is a data interpretation failure rather than scanner drift.

Retain the export settings and the receiving application's check measurement with the scan-to-BIM handoff. Those records separate an import-scale error from disagreement already present in the captured coordinates.

Distinctions

Mesh
A mesh connects sampled locations into surfaces. Its smooth appearance can conceal gaps in the underlying measurements.
BIM object
An object adds interpreted geometry and properties. Its modeled face is a separate deliverable from the measured point samples.

Frequently asked questions

Does a denser cloud always support a tighter tolerance?

No. Density improves sampling of surfaces and small features. Instrument performance, registration, surveyed control and measurement geometry determine positional agreement.

Sources checked

Also defined as

  • The set of measured points from a laser scan that records as-installed geometry; raw input to a scan-to-BIM as-built

Where this shows up

Next step: Find renovation capture work

Back to the full field glossary