ANVILFIELD Try FieldOS

Field glossary · property

Saturation temperature

A saturation-temperature lookup needs both a refrigerant and a pressure reference. For R-407C at 1,023.4 kPa absolute, Chemours's tables give a 20°C liquid bubble point and, by interpolation, about 25.7°C vapor dew point. Selecting the other phase boundary changes a service calculation by about 5.7 K. A gauge reading also needs its atmospheric-pressure conversion before it can be compared with this absolute-pressure table.

The boiling or condensing temperature for a refrigerant at a given pressure, read from the P-T chart

Used across 2 Anvilfield field guides, most in HVAC.
Updated

Read the pressure reference printed on the property table

Chemours labels both saturated-liquid and saturated-vapor pressures in its Freon 407C SI property tables as kPa absolute. Its 2025 field pressure-temperature guide instead labels the metric service pressures bar gauge and the US service pressures psig. Importing a property-table pressure directly as a gauge reading shifts the reference by local atmospheric pressure.

Chemours uses 101.325 kPa for one standard atmosphere. Its R-407C bubble pressure of 1,023.4 kPa absolute at 20°C corresponds to approximately 922.1 kPa gauge at that atmospheric reference. Entering 1,023.4 as kPa gauge would select a different state. Mark the absolute-to-gauge conversion on the charging record before transferring the value into a service instrument.

A blend has two equilibrium boundaries

Chemours gives R-407C saturated-liquid pressure as 1,023.4 kPa absolute and saturated-vapor pressure as 864.4 kPa absolute at 20°C. Those are two pressures at one temperature. They should not be mistaken for a single-pressure temperature glide or averaged into a service saturation value.

To find glide at a measured pressure, hold pressure fixed and determine the corresponding bubble and dew temperatures. Use the bubble boundary for a liquid-side comparison and the dew boundary for a vapor-side comparison, as Chemours directs in its field guide. An app's refrigerant selection must preserve both boundaries rather than displaying a convenient average without a label.

Calculate glide at one pressure, not from two pressure columns

Chemours's R-407C vapor rows give 1,002.1 kPa absolute at 25°C and 1,031.5 kPa absolute at 26°C. Linear interpolation at 1,023.4 kPa gives a dew temperature of about 25.7°C. At that same pressure the liquid row gives 20°C, so the calculated glide is about 5.7 K. Subtracting the two pressures at 20°C would instead produce a pressure span, not temperature glide.

A 30°C suction-line reading at that local pressure is about 4.3 K above the dew point. Substituting the 20°C bubble value would report 10 K and overstate superheat by about 5.7 K. Carry the refrigerant, pressure basis and selected boundary into the cycle calculation, rather than copying an unlabeled saturation value from an app.

Distinctions

Air dew point
The temperature at which water vapor in an air mixture begins to condense. A refrigerant dew point concerns the refrigerant blend's vapor boundary.
Actual line temperature
Measured by a suitable thermometer. It can lie above or below the relevant saturation boundary when vapor is superheated or liquid is subcooled.

Frequently asked questions

Why does the same refrigerant chart list two saturation values?

For the R-407C example at 1,023.4 kPa absolute, the liquid boundary is 20°C while the vapor boundary is about 25.7°C. The relevant phase determines which value belongs in the calculation.

Can I convert saturation pressure to temperature without naming the refrigerant?

No. Each refrigerant has its own equilibrium relationship, and blend composition also determines the appropriate bubble and dew boundaries.

Sources checked

Where this shows up

Next step: Select rooftop service buildings

Back to the full field glossary