Field glossary · measurement
TDS
TDS means total dissolved solids, but a meter's ppm display and a laboratory's mg/L result are different kinds of evidence. The meter converts conductivity into an estimated concentration using a selected factor. At 800 microsiemens/cm, factors of 0.55 and 0.75 produce 440 and 600 ppm respectively. Compare the factor, temperature reference, and sampling point before treating a changed display as a change in water quality.
Total dissolved solids in parts per million, the plain-language read on dissolved ion load
Why two TDS meters disagree on the same sample
USGS Water-Supply Paper 2254 gives 0.55 to 0.75 as the common dissolved-solids-to-specific-conductance factor for natural waters, with higher factors often associated with sulfate-rich water. That is a common range, not the report's full observed range. EPA's conductivity guidance reports conductivity at 25°C; use that temperature basis before multiplying microsiemens/cm by the selected factor to estimate mg/L.
The difference between the two meter settings below is 160 ppm, with no change in measured conductivity. Save the raw conductivity and conversion setting with the RO and DI service record so a later technician can reproduce the comparison.
| Same sample at 25°C | Conversion setting | Calculated display |
|---|---|---|
| 800 microsiemens/cm | 0.55 | 440 ppm |
| 800 microsiemens/cm | 0.75 | 600 ppm |
What a laboratory dissolved-solids result measures
USGS Water-Supply Paper 2254 describes gravimetric dissolved solids as evaporation residue and identifies 180°C drying in the USGS analytical methods it discusses. Drying temperature and volatile constituents affect the recovered mass. Request the laboratory method with the result rather than treating every reported TDS number as an interchangeable measurement.
A retained residue of 60 mg from 100 mL of filtrate corresponds to 600 mg/L: divide residue mass by sample volume in liters. This calculation measures recovered mass. A conductivity meter instead responds to ionic conduction, so dissolved material with little electrical response does not contribute in the same way. Sample preparation and chemistry explain differences between the two methods.
The EPA 500 mg/L guideline and equipment limits
EPA lists 500 mg/L TDS as a secondary drinking-water guideline addressing aesthetic and operational effects, rather than a federally enforceable primary health limit. State requirements and an equipment manufacturer's water specification are separate criteria. A result below 500 mg/L does not establish that an ice machine, boiler, or laboratory process has suitable feedwater.
Two supplies at 450 mg/L can differ in hardness, chloride, alkalinity, and silica. An estimator choosing treatment for an ice machine needs those constituent results, while a pool-service route needs consistent source-water and pool-water sampling points. Put the constituent analysis beside the total when selecting equipment from the water treatment guide.
Compare feed and product without changing the scale
Feedwater at 600 mg/L and permeate at 18 mg/L give a calculated rejection of 97 percent: (600 - 18) / 600 multiplied by 100. If both numbers came from conductivity-derived TDS displays with the same factor, report this as apparent rejection on that meter scale. The common factor cancels in the ratio; different factors between samples do not. Lab residue results measure a different basis, and membrane separation can change the ionic mixture behind the conductivity conversion.
Distinctions
- Hardness
- A hardness result reported as mg/L CaCO3 uses an equivalent chemical basis; adding it directly to a TDS result would double-count material and mix reporting bases.
- DASMA TDS
- On door and gate documents, TDS means Technical Data Sheet. A reference such as DASMA TDS 352 is a document number, not a water-quality reading.
Frequently asked questions
Does a zero TDS reading mean sterile water?
A conductivity-derived zero describes the instrument's electrical response and resolution. It supplies no organism count and does not measure all dissolved contaminants.
Should a softener make TDS fall?
Use a paired hardness test to accept softener performance. A post-softener TDS display close to the inlet reading is compatible with successful ion exchange because the replacement sodium still contributes to dissolved material.
Sources checked
- USGS Water-Supply Paper 2254, third edition, 1985: conductivity factors and dissolved-solids residue
- EPA: Secondary Drinking Water Standards, TDS guideline and federal status
- EPA Volunteer Stream Monitoring Manual, Section 5.9: conductivity temperature reference and TDS estimation
- DASMA: Technical Data Sheets directory, including TDS 352
Also defined as
- Total dissolved solids, all dissolved matter in the water, in ppm or mg/L