ANVILFIELD Try FieldOS

Field glossary · process

Recovery

Recovery is the refrigerant removal operation that produces a separately stored charge and a verified appliance pressure endpoint. A weight record answers how much material moved; the pressure record answers whether removal reached the applicable EPA level. Neither establishes refrigerant purity. For stationary appliances covered by Section 608, choose the endpoint from appliance category, full charge, recovery-equipment manufacture or import date, and any applicable repair exception.

Removing refrigerant from a system into an external cylinder, required by EPA 608 before opening the system

Used across 2 Anvilfield field guides, most in HVAC.
Updated

EPA recovery pressure targets by appliance category

40 CFR 82.156 sets the following endpoints for covered stationary appliances using recovery equipment manufactured or imported on or after November 15, 1993. Inches Hg here means vacuum relative to a standard atmosphere of 29.9 inches Hg; the low-pressure row uses absolute pressure instead.

Under 40 CFR 82.152, R-410A belongs to the high-pressure category. R-134a is a medium-pressure example. Use those regulatory categories with the leak detection and recovery guide, rather than assigning a category from a familiar operating gauge reading.

For recovery equipment manufactured or imported before November 15, 1993, EPA's table uses 4 inches Hg vacuum for both medium-pressure size groups and for high-pressure appliances of 200 lb or more. The other table endpoints are unchanged. The date concerns recovery equipment, not the installed appliance.

Appliance categoryFull chargeRecovery endpoint with the later equipment
Very high pressureAny0 inches Hg vacuum
High pressureBelow 200 lb0 inches Hg vacuum
High pressure200 lb or more10 inches Hg vacuum
Medium pressureBelow 200 lb10 inches Hg vacuum
Medium pressure200 lb or more15 inches Hg vacuum
Low pressureAny25 mm Hg absolute

Small appliances and limited repair exceptions

For a factory-manufactured, charged and hermetically sealed small appliance holding 5 lb or less, 40 CFR 82.156 allows recovery to 4 inches Hg vacuum instead of the percentage method. With recovery equipment made on or after November 15, 1993, the percentage method requires 90% when the appliance compressor works and 80% when it does not; older recovery equipment uses 80%.

The same rule permits evacuation of an isolated part when its refrigerant can be moved into a system receiver. For a non-major repair without subsequent evacuation to the atmosphere, medium-, high- and very-high-pressure appliances have a 0 psig endpoint. Record the qualifying work scope when using that exception.

If leaks prevent the table endpoint or would substantially contaminate recovered refrigerant, EPA requires isolation where possible, normal evacuation of sound components, and evacuation of leaking components as far as attainable without substantial contamination, never above 0 psig. A leaking appliance does not remove the recovery obligation.

Recovered, recycled and reclaimed refrigerant

EPA's recovery definition makes no promise of cleaning or analytical testing. Recycling adds cleaning for reuse under the same ownership; reclamation requires processing and analytical verification against the applicable federal purity specification, based on AHRI 700-2016. A recovery machine's output is therefore a recovered lot, not automatically reclaimed refrigerant.

EPA permits recovered stationary-system refrigerant to return to the same appliance or another appliance belonging to the same owner. Transfer to a different owner for use requires an EPA-certified reclaimer. Keep ownership with the lot record; sending a cylinder for reclamation or destruction is a different destination from charging another customer's system.

Effective January 1, 2026, 40 CFR 84.112 also limits virgin HFC content to 15% by weight of the HFC portion when refrigerant is sold, identified or reported as reclaimed for installation, service or repair. This composition rule accompanies the purity requirement. Documentation for a reclaimed HFC claim must address both purity and virgin-HFC content.

Recovery vacuum and dehydration vacuum use different scales

The low-pressure recovery endpoint, 25 mm Hg absolute, equals 25,000 microns Hg absolute. Enter it in the recovery record. The later dehydration operation has its own measured vacuum and acceptance criteria for removing air and moisture.

Zero psig references local atmospheric pressure; zero absolute pressure references a perfect vacuum. Record the gauge's units and reference with the endpoint. Writing only zero or 25 on a service ticket loses the information needed to interpret the result.

Calculate the recovered weight from the cylinder readings

A cylinder weighing 24.6 lb before recovery and 42.8 lb afterward received 18.2 lb with the weighing arrangement unchanged. A 24 lb appliance nameplate charge describes a separate quantity. Subtracting 18.2 from 24 does not measure this interval's leakage: initial charge, earlier additions and material remaining elsewhere also affect the balance.

Keep the cylinder identifier, both weights, refrigerant designation, originating appliance, owner and destination together. That lot record follows recovered material through storage, reuse or reclamation without converting a nameplate assumption into a measured loss.

Distinctions

RO recovery
In reverse osmosis, recovery means the fraction of feedwater converted into permeate. It is a water-yield ratio, rather than removal of a refrigerant charge into a container.

Public HVAC replacement bids identify jobs where refrigerant removal belongs in the scope; PorchRocket Bid Control tracks those opportunities from agencies, school districts and other public owners.

Frequently asked questions

Is pumping refrigerant into the system receiver the same as recovery?

Receiver pump-down stores refrigerant inside the appliance. Recovery stores it externally. Section 82.156 permits the isolated-part arrangement described above, with the applicable endpoint verified in the part before opening; the retained charge and receiver location belong in that job record.

Sources checked

Also defined as

  • Plumbing: The fraction of RO feed water that becomes permeate rather than going to reject

Where this shows up

Related guides

Next step: Build rooftop replacement lists

Back to the full field glossary