Field glossary · component

Trap primer

A trap primer's refill is useful only when it reaches the served trap, so commission the device by measuring delivery at each outlet and confirming the destination. Sioux Chief's 695 Series instructions use 2 fluid ounces per port per activation as the starting dose, with a daily distribution recommendation and adjustment for drain duty. Record the lowest outlet volume, inlet pressure, and activation schedule; an energized solenoid alone establishes none of those quantities.

A device that adds water to a seldom-used trap to keep its seal from evaporating dry, also called a trap seal primer

Used across 4 Anvilfield field guides, most in Plumbing.
Updated

Set electronic delivery in ounces per port

Sioux Chief recommends a minimum supply pressure of 20 psi for the cited 695 installation and calls for the designer or installer to set the quantity and frequency required at the location. Begin with its 2 fluid ounce recommendation, then verify delivery with the actual pressure and connected manifold. That is a manufacturer setup value, not a code-wide dosing requirement.

For five drains receiving 2 fluid ounces each once daily, the total scheduled delivery is 10 fluid ounces per day. Measure the outlets separately: 10 ounces collected from a common outlet does not establish a 2 ounce dose at each drain. A low-delivery branch remains a distinct defect even when the total looks right.

Why the same timer duration does not fit every manifold

Sioux Chief's 695 Series chart reports the minimum delivery from the lowest-flowing port, not identical discharge at every outlet. On its 10-port unit, that minimum is approximately 2.1 fluid ounces at 20 psi for a 10 second cycle, or 2 fluid ounces at 40 psi for 5 seconds. Multiplying either value by the port count does not establish the unit's exact total discharge.

List the lowest measured outlet volume beside pressure, connected outlet count, on-time, and off-time. Fill the traps initially before judging the smaller replenishment dose; the instructions provide for a longer initial run or repeated cycles. Put the measured outlet schedule beside the distribution drawing in the primer service record.

A route limit and a hidden port cover

Sioux Chief limits the cited electronic-primer installation to 60 ft from the drain being filled and requires proper fall in the priming lines. Its instructions also call for removing an installed cover from the drain's primer port. A flowing valve upstream of an unopened port delivers no water to the trap.

A branch ending 54 ft away is inside that route limit, but a covered drain inlet still stops its delivery. Sioux Chief also requires the unit and distribution manifold to be level. Measure at the farthest and lowest-delivery branches before covering their runs, and identify each destination in the floor-drain record.

Service the listed assembly with both supplies isolated

The 695-ES01 specification identifies an ASSE 1044-listed assembly with a vacuum breaker and water-hammer arrester. A potable-water connection alone does not identify the listing: ASSE's current 1044-2023 scope includes electric designs, while 1018-2023 addresses potable-water-supplied primer valves. Retain the model identity when ordering the solenoid, timer, or distribution accessories.

Sioux Chief requires the water supply and primary power to be shut off before maintenance, and the power feed disconnected before electronics are adjusted. Its 695 instructions specify PTFE tape instead of thread compound to avoid fouling the solenoid. After inlet-screen cleaning and reassembly, restore service and collect the individual outlet deliveries again.

Distinctions

Evaporation barrier
A closed evaporation barrier has no replenishment dose to collect. Verify its drain fit and membrane movement; use outlet-volume measurements for the primer that actually adds water.

Frequently asked questions

How much water should an electronic primer deliver?

Use the selected unit's instructions and drain duty. The cited Sioux Chief instructions use a 2 fluid ounce per-port starting recommendation, with frequency and quantity adjusted for the location.

Does ten ports at 2.1 ounces mean exactly 21 ounces total?

The Sioux Chief chart uses the lowest-flowing port, so the other outlets can discharge more. Collect each outlet to determine total delivery and confirm that the least-served drain receives its required dose.

Sources checked

Also defined as

  • A device that feeds water to a trap on a schedule so the seal does not evaporate, listed to ASSE 1018 or 1044
  • A device or line that feeds a trickle of water to a trap to keep its seal from evaporating in a dry receptor