ANVILFIELD Try FieldOS

Field glossary · component

Weep holes

A shower drain's weep holes carry water from the buried liner into the drain body, so a freely draining grate does not prove they are open. Oatey's Testable 130 Series PVC drain has four dual weep-channel holes to inspect around its collar. Keep the sealed liner joint separate from those drainage passages, and verify their condition after tightening the collar and before placing the mortar bed.

Openings at liner level in a clamping drain that let water in the mortar bed drain out

Used across 2 Anvilfield field guides, most in Plumbing.
Updated

Find every drainage passage in the collar

Oatey's Testable 130 Series PVC drain specifies four dual weep-channel holes. Mark each checked location around the collar in the installation photograph. This count belongs to that model; one visible opening is not evidence that its remaining passages are clear.

Oatey's reversible collar adds 1 inch of installation height in its alternate position. Record the selected orientation and trace each inlet and outlet in that position. Keep the model detail beside the shower waterproofing layout so the final barrel height can be related to the buried drainage plane.

Sealant squeezed into a weep is a drainage blockage

Oatey's shower installation guidance specifically warns that excess silicone beneath the liner can squeeze up and block weep holes when the collar is tightened. Inspect after the ring is secured, not just while the uncompressed bead looks neat. Trimmed liner residue can obstruct the same passages.

Oatey recommends either weep guards or pea gravel at the drain barrel. Verify the manufacturer's selected protection detail after the collar is tight and include it in the close-up photograph. A picture of the open ring taken before sealant compression cannot show whether that compression later obstructed a passage.

An open hole still needs fall toward it

A liner point 3 ft from the outlet needs 3/4 inch of fall to meet the pitch specified in New York's 2025 Section 421.5.2: 1/4 unit vertically per 12 horizontally. Measure that 3/4 inch at the liner, before the tile bed hides it. A measurement made only on the finished tile cannot establish the buried drainage slope.

If the drain inlet sits above a local liner pocket, water remains below its entry elevation even after the passages are cleared. Photograph the low point and measure its elevation relative to the inlet while both are accessible. Include that relationship in the floor-drain membrane detail.

What a drain-flow check cannot tell you

Keep the results of these checks separate on the waterproofing record. A leak-free enclosure and a functioning liner-level drain are both needed, but the observations below establish different parts of that assembly.

CheckEvidence it providesQuestion left open
Water through the grateMain drain carries surface flowAre liner-level passages clear?
Liner flood testWaterproof enclosure holds under test conditionsCan the buried drainage plane empty?
Collar and liner inspectionPassages, protection, and slope are visibleDoes the completed enclosure pass its leak test?

Distinctions

Masonry weep
A wall weep drains a flashing or cavity toward the exterior. Its spacing and opening detail belong to that wall design; shower-collar counts do not specify a wall detail.
Bonded waterproofing drain
A surface waterproofing system has its own drain-interface and drainage details. Identify the complete system before transferring a buried-liner clamping-ring detail to it.

Frequently asked questions

Can the shower drain quickly with blocked weeps?

Yes. Surface water can enter through the main opening while water at the liner remains stranded outside blocked collar passages.

Should silicone cover the clamping-ring openings?

Oatey identifies silicone obstruction as a failure. Keep the required liner seal and the intended drainage passages in their specified locations.

Sources checked

Also defined as

  • Openings in the drain body above the clamp that let membrane water drain into the trap

Where this shows up

Next step: Locate shower renovation scopes

Back to the full field glossary