Field glossary · property
Wind uplift
For a building roof, wind-uplift demand combines exterior suction with the applicable pressure inside the building; for an elevated solar panel, use the net pressure across the module's exposed faces. Keep those calculations separate. Each pressure needs its roof or array zone, effective wind area, and strength or allowable-stress basis before comparison with the corresponding attachment resistance.
The lifting force wind exerts on the array and roof, worst at corners and perimeter, set by ASCE 7
Put the demand and resistance on the same design basis
ASCE/SEI 7-22 supplies structural wind loads and load combinations; the selected product approval supplies resistance on its stated basis. Carlisle's 2025 ASCE comparison uses a 0.6 factor for allowable-stress wind pressures. That conversion concerns the wind demand, rather than the safety factor applied to a roof-system test rating.
A -75 psf strength-level wind pressure becomes a -45 psf allowable-stress wind component when multiplied by 0.6. This does not make a 75 psf tested assembly automatically acceptable. Identify the test report's allowable or ultimate basis and the project's governing load combination before making the comparison described in the attachment guide.
Check the enclosure assumption as well as the roof
Carlisle's ASCE 7 comparison lists positive internal-pressure coefficients of 0.18 for an enclosed building and 0.55 for a partially enclosed building in its roof-pressure example. Positive interior pressure adds outward demand to an externally suction-loaded roof. Enclosure classification therefore belongs in a roof-uplift review even though the openings are in the walls.
Using a 25 psf multiplier that already includes directionality and the selected design basis, changing the positive internal coefficient from 0.18 to 0.55 adds 25 x (0.55 - 0.18) = 9.25 psf of outward roof demand. Over 32 square feet, that increment is 296 pounds-force. Keep the opening and enclosure assumptions with the calculation, especially when an alteration creates a large wall opening.
Wind speed changes pressure by the square
Carlisle's published velocity-pressure expression makes pressure proportional to wind speed squared when the other factors stay fixed. Increasing the speed input from 120 to 150 mph therefore multiplies that part of the pressure by 1.5625, a 56.25% increase. A 25% speed increase is not a 25% pressure increase.
Keep site wind speed, risk category, exposure, mean roof height, roof geometry, and the code edition in the calculation record. ASCE 7-22 is the edition referenced by the 2024 IBC, as Carlisle's comparison explains. An older wind-speed value and a newer set of coefficients should not be combined without preserving their design basis.
Use component area before counting anchors
A uniform -60 psf demand over a 4-by-8-foot area corresponds to 1,920 pounds-force outward. That area calculation does not establish how the force divides among a fastener row, adhesive ribbons, or panel clips. Their load distribution follows the tested assembly and its connection geometry.
DOE's Federal Energy Management Program identifies wind loading on both front and back faces of PV modules. An elevated solar array therefore needs its module and racking load case, while the building roof retains its own exterior and interior pressure calculation. Match each demand to the assembly carrying it. For edge metal, preserve pressure or line-load units with the tested detail.
Distinctions
- Gravity load
- Gravity acts vertically downward. Wind pressure acts normal to the component surface and can produce uplift, lateral force, and overturning.
- Fastener pullout result
- A pullout test measures one connection in a particular substrate. Roof-system resistance also depends on the membrane, plates, boards, adhesives, and their load distribution.
Frequently asked questions
Does the minus sign mean the load is smaller?
In the stated surface-pressure convention, a negative value acts outward. Its magnitude is the suction demand; -60 psf is a greater outward demand than -40 psf.
Can I compare two uplift numbers without their reports?
Obtain the demand basis, effective area, roof zone, and resistance basis. The same numerical pressure can describe different design or test conditions.
Sources checked
Also defined as
- The suction wind exerts on the array, designed to ASCE 7, worst at edges and corners
- The net upward suction force on the roof, in pounds per square foot (psf)