ANVILFIELD Try FieldOS

Market Intelligence

Pool equipment manufacturers: commercial and residential pool counts

Size the pool installed base, translate water bodies into circulation-pump demand, and give dealers a territory plan built from properties, equipment and dated evidence.

Market IntelligencePool EquipmentInstalled BaseDealer CoverageCommercial Pools

Direct answer

Anvilfield estimates the US pool market at 9 million residential pools, with a range of 8.1 million to 9.9 million, and 300,000 commercial pool water bodies, with a range of 240,000 to 360,000, in its analysis of the 2025 stock. Count properties, water bodies and equipment separately. Manufacturers should map the pools their dealers support, verify the equipment and connect each property to its operator and purchasing route.

On this pageWhat should a pool equipment manufacturer count?Anvilfield estimates of pool stock and pump replacementWhat can imagery tell you about a pool?How do you turn pool counts into equipment demand?Anvilfield pool market benchmarksWhere should manufacturers and distributors focus coverage?Worked example: a regional pool-pump manufacturerHow do leading pool suppliers keep the map useful?Pool prospect release checklistWhat belongs in a dealer handoff?Common counting mistakesMethodology
Need to run this in the field?

Open the related tool for the calculation, checklist, or packet.

Key takeaways

  • Anvilfield estimates about 9.3 million residential and commercial pool water bodies in the central planning case.
  • Anvilfield estimates about 1.57 million primary circulation-pump replacements annually, with a planning range of 1.04 million to 2.69 million.
  • Keep the pool, property, operator and equipment assembly as separate linked records.
  • Use dated imagery to locate outdoor pools and equipment records to qualify product fit and replacement timing.

What should a pool equipment manufacturer count?

Anvilfield estimates the US pool market at 9 million residential pools, with a range of 8.1 million to 9.9 million, and 300,000 commercial pool water bodies, with a range of 240,000 to 360,000, in its analysis of the 2025 stock. Count properties, water bodies and equipment separately. Manufacturers should map the pools their dealers support, verify the equipment and connect each property to its operator and purchasing route.

Installed-base mapping locates every unit of a product class in the field, across all brands. For pool equipment, link each assembly to its pool and property. Keep circulation pumps, booster pumps, water-feature pumps and stand-alone motor replacements in separate classes. A distributor's motor invoice and a manufacturer's complete-pump shipment describe different events, even when both relate to the same equipment pad.

Building-first prospecting starts with the building and what is visible on its property, then finds the decision maker. Fit-first lists filter those properties to the buildings and assets that fit a company's work. A commercial pump line should therefore begin with eligible hotels, apartments, clubs and aquatic facilities, then establish the pools and equipment at each address.

Keep residential and commercial purchasing routes separate. A homeowner's pool remains residential when a service professional maintains it. An apartment community belongs in the commercial operating segment used here, even though residents use the water. Record municipal ownership, association ownership and private commercial ownership as attributes rather than treating every commercial pool as a city recreation asset.

Make the hierarchy explicit: property, pool water body, circulation system, equipment assembly and buying role. A resort with several pools creates several water-body records under its property record. Shared circulation equipment needs its own system identifier so the same assembly does not appear repeatedly beneath every connected feature.

Installed-base mapping for equipment manufacturersInstalled-base mapping for equipment manufacturers
Building-first prospectingBuilding-first prospecting
Fit-first listsFit-first lists

Anvilfield estimates of pool stock and pump replacement

Anvilfield estimates 9 million US residential pools, with a range of 8.1 million to 9.9 million, and 300,000 commercial pool water bodies, with a range of 240,000 to 360,000, in its analysis of the 2025 stock.

Anvilfield estimates 9.3 million combined water bodies, with a range of 8.34 million to 10.26 million, and 240,000 commercial pool properties, with a range of 160,000 to 360,000. The property count organizes accounts; the water-body count organizes equipment research.

Anvilfield estimates 1.57 million annual primary circulation-pump replacements, with a range of 1.04 million to 2.69 million. Anvilfield estimates 75,000 annual commercial circulation-pump replacements within that total, with a range of 38,000 to 180,000.

Anvilfield estimates commercial pools at 3.2% of water bodies, with a range of 2.9% to 3.5%, and 4.8% of annual primary-pump replacements, with a range of 3.6% to 6.7%. Give commercial coverage its own operating plan alongside residential dealer coverage.

Use stock rows for territory coverage and annual rows for replacement planning. Connect named replacement opportunities to equipment condition, maintenance records and an owner conversation. Methodology records the published stock anchors, Anvilfield equipment settings and range calculation.

Anvilfield estimateLowCentralHigh
US residential pools8,100,0009,000,0009,900,000
US commercial pool water bodies240,000300,000360,000
Combined pool water bodies8,340,0009,300,00010,260,000
Commercial pool properties160,000240,000360,000
Residential self-priming pump positions4,860,0005,400,0005,940,000
Residential non-self-priming pump positions3,240,0003,600,0003,960,000
Commercial circulation-pump positions300,000450,000720,000
Residential self-priming replacements/year540,000771,0001,188,000
Residential non-self-priming replacements/year463,000720,0001,320,000
All residential primary-pump replacements/year1,003,0001,491,0002,508,000
Commercial circulation-pump replacements/year38,00075,000180,000
Combined primary-pump replacements/year1,040,0001,566,0002,688,000
Commercial share of pool water bodies2.9%3.2%3.5%
Commercial share of annual pump replacements3.6%4.8%6.7%

How to cite this estimate: Anvilfield, Pool equipment manufacturers: commercial and residential pool counts, 2026, https://anvilfield.com/field-guides/market-intelligence/pool-equipment-manufacturers-commercial-and-residential-pool-counts/

What can imagery tell you about a pool?

Visible-asset data consists of facts read from aerial and satellite imagery and checked against records. Outdoor pool basins, enclosures and their relationship to surrounding buildings are useful location evidence. Carry the observation date, imagery footprint and reviewer decision into the asset record so the next user understands what was actually seen.

Record a covered or drained basin as a pool observation with its observed status. Use permits, property records and the operator's information to resolve whether the basin remains in service. A water-filled rectangle, decorative fountain or stormwater feature needs review before entering the pool inventory. Keep rejected detections and the reason for rejection so search quality can be improved.

Indoor pools need a parallel records search. Search facility descriptions, operating permits and building information for aquatic use, then attach the indoor venue to its property. Keep imagery-visible outdoor pools and register-confirmed indoor pools as separate evidence channels. That distinction helps a manufacturer understand which parts of the territory a visual search actually covered.

The view above the property establishes location and context. Pump model, motor rating, filter capacity, heater type, controller compatibility and equipment age come from equipment-linked records or an authorized site survey. A pool's appearance does not establish the installed equipment brand. Assign unknown values explicitly, then give the dealer the specific question needed to resolve them.

For the physical work behind the asset record, use the shell guide to distinguish basin construction from equipment scope and the natatorium guide for indoor operating context. Keeping those disciplines attached to the same property prevents the sales file from treating every indoor pool as an ordinary backyard installation.

Visible-asset dataVisible-asset data
Commercial pool construction and shotcrete shellsCommercial pool construction and shotcrete shells
Natatorium and indoor pool dehumidificationNatatorium and indoor pool dehumidification

How do you turn pool counts into equipment demand?

Build the equipment layer before calculating annual demand. Assign a circulation system to each pool, link the primary pumps to that system, and identify equipment shared between water bodies. Where equipment details remain unresolved, retain the pool in the market inventory and use the planning intensity until the dealer supplies a verified count.

For residential planning, the model separates self-priming and non-self-priming primary pump positions. For commercial planning, it allows more circulation equipment per water body. These classes create different annual replacement workloads. Apply each life setting to its own equipment population before adding the annual results.

Treat a replacement as an event on an assembly record. If a service company changes a motor while retaining the pump housing and hydraulic assembly, record a repair event. If the complete circulation pump changes, record an assembly replacement. Keep removals, upgrades and new installations as separate events so channel invoices do not inflate the replacement total.

Build separate models for heaters, filters, chemical feeders and automation. Their attachment rates and equipment lives need their own source inputs and verified local equipment mix. Use the pool register as the shared location layer, then calculate each product family from the equipment that is actually installed. A pump replacement rate should stay attached to pumps.

Use the mechanical-systems guide to qualify circulation and filtration scope, the pump guides to frame the operating survey, and the drive guide when controls compatibility affects the offer. Product selection follows verified duty and the manufacturer's requirements. Dealer feedback should replace planning ratios as equipment evidence accumulates.

Swimming pool and spa mechanical systemsSwimming pool and spa mechanical systems
Pump installation and replacementPump installation and replacement
Pump cavitation and suction conditionsPump cavitation and suction conditions
Variable-frequency drive installationVariable-frequency drive installation

Anvilfield pool market benchmarks

Use these Anvilfield planning rules as a common language for the territory team. The equipment ratios come from the central model; the review and refresh settings define the operating workflow. Replace a planning ratio with a verified equipment count whenever the dealer returns a supported record.

The residential and commercial annual rates describe a distributed replacement workload across a stock population. Apply them to the eligible pool population in a territory, then check product compatibility, service access and channel capacity. The annual rate does not identify which individual pump should be replaced next.

A detection pilot should cover the search strata that change the counting problem: housing with outdoor pools, commercial outdoor venues and indoor facilities found through records. Record false detections, duplicate water bodies and missed register entries separately. Use those findings to tighten acceptance criteria before ordering wider coverage.

Anvilfield planning ruleBasisUse
Count a property once, then attach its pools and pumps.Separate property, water-body and assembly IDsAccount coverage
Start with one primary circulation position per residential pool.1 position/poolInitial residential equipment scope
Use 150 circulation-pump positions per 100 commercial pools.1.50 positions/pool, central settingInitial commercial stock
Plan about 166 residential replacements per 1,000 pools annually.60% self-priming; 40% non-self-primingPrimary whole-pump assemblies
Plan 250 commercial replacements per 1,000 pools annually.1.50 pumps/pool divided by 6 yearsPrimary circulation assemblies
Review 50 detections in each search stratum before scaling.Anvilfield pilot setting; include indoor register checksSearch acceptance
Recheck priority commercial records every 90 days.Anvilfield monitoring setting; confirm equipment separatelyTerritory upkeep
Keep unknown brands outside brand-specific forecasts.Retain the pool in the category inventoryManufacturer attribution

Where should manufacturers and distributors focus coverage?

Targeted market intelligence sizes and locates demand at the building level rather than the ZIP level. For pool equipment, the useful map shows eligible pool properties, supported product classes and the dealers able to serve them. Compare those physical accounts with current dealer coverage before adding representatives or changing distributor inventory.

Divide commercial coverage by operating model. Hotels, apartment communities, clubs, public aquatic facilities and water parks have different maintenance responsibilities and purchasing paths. Attach the operator, management company, service contractor and purchasing office to their roles. A property owner helps establish responsibility; the equipment buyer often sits elsewhere in that chain.

Leading manufacturers and distributors measure building-level coverage directly with data such as PorchRocket's Ground Control, whose standard commercial lists filter by business type, building size and visible property features. Use those filters to establish the eligible property universe, then scope pool-specific confirmation separately.

For residential distribution, compare mapped pool neighborhoods with the dealers' actual service boundaries and product support. Retain the residential asset location even when several service companies operate nearby. A crowded contact database can conceal an equipment-support gap if the listed businesses do not install or service the manufacturer's product family.

Connect the map to an operational decision. A distributor needs the equipment classes its branches should support. A manufacturer needs the neighborhoods or commercial account groups where dealer coverage is thin. A representative needs an operator and a technical question worth discussing. Each view should come from the same linked property and equipment records.

Targeted market intelligenceTargeted market intelligence
Manufacturer rep coverage by asset densityManufacturer rep coverage by asset density
Commercial pools and the service marketCommercial pools and the service market

Worked example: a regional pool-pump manufacturer

Anvilfield's typical regional pool-pump manufacturer has 4 territory representatives and 1,200 commercial pool water bodies. The case contains 960 properties and 1,800 circulation-pump positions, supporting 300 annual complete-pump replacements. Keep those physical quantities distinct before evaluating product and channel coverage.

The team then applies its product and channel screen. Its compatible, service-accessible share is 65%, covering 1,170 pump positions. That supported population produces 195 annual replacement units at the central life setting. Keep the broader inventory so engineering can investigate unsupported applications and channel managers can distinguish product gaps from dealer gaps.

An even geographic assignment gives each representative 240 properties and about 49 annual supported replacement units. Use those averages as a coverage check, then rebalance by travel, operator groups and equipment complexity. A resort cluster with shared purchasing deserves a different call plan from isolated facilities spread across a large service boundary.

The practical handoff contains the pool location, operating segment, current equipment evidence, compatibility status and responsible service channel. The representative resolves the buying role and timing. The dealer verifies equipment duty and replacement scope. The manufacturer uses returned model information to improve the compatibility screen and keeps unresolved applications in a technical review queue.

The distributor can now compare the supported workload with the product families it stocks and the crews it can support. Factory planning should combine that eligible replacement workload with confirmed projects, distributor inventory and separate new-construction records. The installed-base model provides a repeatable demand basis; channel orders provide the commitment signal.

Manufacturer territory measureCentral caseCalculation
Commercial pool water bodies1,200Territory input
Commercial properties9601,200 / 1.25
Circulation-pump positions1,8001,200 x 1.50
Annual complete-pump replacement workload3001,800 / 6
Compatible, service-accessible pump positions1,1701,800 x 65%
Annual supported replacement units1951,170 / 6
Properties per representative240960 / 4
Annual supported units per representative49195 / 4, rounded

How do leading pool suppliers keep the map useful?

Asset monitoring detects new, removed or altered assets by comparing dated observations. For pools, record a newly visible basin, a filled-in pool or a changed enclosure as a change requiring review. Link the observation to the existing property record so an address correction or new image does not create a duplicate account.

Manufacturers and service companies use PorchRocket's Asset Search for custom searches of assets visible from above, with reviewed results and the owner of record on each find. Define which pool types qualify and which evidence resolves a covered basin or an ambiguous water feature before expanding the search.

Maintain separate dates for property evidence, pool observation, equipment verification and buying-role confirmation. A new image refreshes the visible pool record. A dealer's dated nameplate photograph refreshes the equipment identity. An operator discussion refreshes purchasing responsibility. These events update different fields and should remain traceable to the person or source that supplied them.

For ongoing territory upkeep, PorchRocket's Asset Search also scopes custom monitoring, with pricing quoted for the requested work. Specify the geographic boundary, the visible change to flag and the review evidence required before a change enters the dealer queue.

Close the loop with the channel. Let dealers return corrections for pool status, equipment counts, manufacturer identity and buying role. Preserve the previous value and its evidence date when accepting a correction. A maintained register should explain why the territory changed, whether the team gained product coverage, and which unresolved assets still need a visit.

Asset monitoringAsset monitoring
Customer database and CRM managementCustomer database and CRM management

Pool prospect release checklist

Release a territory file when the next user can explain what each row represents, where its evidence came from and what action remains. Separate accepted pool observations from unresolved candidates so a representative can work the qualified file while researchers continue reviewing the remainder.

0 of 12 complete

Want this checklist to run itself on every job — with photo proof and a signed record crews can hand the customer? That's FieldOS.

What belongs in a dealer handoff?

A useful dealer handoff states the observed asset, the operating question and the scope that needs confirmation. Include pool and property identifiers, segment, equipment evidence, current service responsibility and the date of the last operator contact. Give the dealer a specific next question rather than asking for an unstructured sales visit.

For circulation equipment, request the current pump assembly, motor and drive details, operating duty and connection constraints. Retain the photograph or document that supports each equipment identity. When a shared system serves several water bodies, the technical reviewer should see the full system relationship before discussing a replacement.

Keep technical acceptance with the authorized practitioner and the applicable requirements. Use the pool bonding and electrical isolation guides for the electrical work, and the backflow guides for the water connection review. The market file should point to those disciplines while preserving the distinction between observed equipment, a proposed scope and an accepted installation.

CPSC's drain-cover guidance addresses product compliance, certification and markings. Include the installed drain-cover identification and supporting records in the technical review when circulation work affects that scope. A visible pool observation establishes the asset location; the dealer's site evidence and the controlling requirements establish the work to perform.

Return the outcome to the register after the visit. A corrected equipment count, a confirmed operator or a deferred replacement date improves the territory model even when no immediate order follows. Completed work should close the old assembly event and identify the new installed equipment so the next planning cycle starts from the current stock.

Pool and spa bondingPool and spa bonding
Electrical lockout and tagoutElectrical lockout and tagout
Backflow preventer assembly typesBackflow preventer assembly types
Cross-connection control and backflow basicsCross-connection control and backflow basics
CPSC drain-cover guidancePool and spa drain covers

Common counting mistakes

Adding pool-and-spa totals to a pool-only inventory creates a scope error before the equipment calculation begins. Keep stand-alone spas and other aquatic features in their own product populations. Pool Corporation's combined pool-and-hot-tub population and its in-ground pool figure describe different scopes, so the research file retains the in-ground figure only as a comparison input.

Using households with access to a shared pool as a count of physical pools repeats the same water body across many residences. Count the community's pool under the operating property and link access information separately. The same principle applies when several parcels share a facility or a management company operates several addresses.

Treating a pool-building permit as proof of completed, operating equipment confuses a pipeline record with an installed asset. Keep permit, construction, operating and removal status distinct. Reconcile a completed project against the existing property before adding a new water body, particularly where a renovation permit refers to a pool already in the inventory.

Multiplying every water body by the same equipment bundle hides shared systems and different product attachments. Use the circulation-pump model for circulation equipment, then build a separate verified attachment model for heaters, filters and controls. Keep unsupported applications available for technical review rather than silently deleting them from the total market.

Assigning equipment age from pool construction age creates a false replacement signal. Preserve the pool's construction history and the assembly's installation history separately. A mature pool with recently replaced equipment belongs in a different equipment planning group from an otherwise similar property still operating its older assemblies.

Methodology

Research notes, 2026-11-05: the stock anchors are Leslie's FY2025 Form 10-K estimates of 9.0 million residential pools and 300,000 professionally operated pools. Pool Corporation's FY2025 report gives approximately 5.5 million US in-ground pools. That comparison informs the residential pump-class split; it is not added to the residential population. The analysis carries the 2025 anchors into the 2026 planning case without a growth factor.

Anvilfield assumptions: residential stock factors are 0.90, 1.00 and 1.10; commercial factors are 0.80, 1.00 and 1.20. Each residential pool receives one primary circulation-pump position, allocated 60% to self-priming and 40% to non-self-priming equipment. This rounded equipment-class allocation is a modeling setting informed by the in-ground comparison. Commercial pools per property are 1.50, 1.25 and 1.00; circulation pumps per commercial pool are 1.25, 1.50 and 2.00.

DOE's 2017 analysis supplies residential mean lives of 7 years for self-priming pumps and 5 years for non-self-priming pumps; ENERGY STAR's 2023 toolkit also uses a 7-year in-ground pump life. Low, central and high replacement settings use self-priming lives of 9, 7 and 5 years and non-self-priming lives of 7, 5 and 3 years. Commercial lives of 8, 6 and 4 years are Anvilfield settings; DOE's discussion supports treating commercial operating exposure separately.

The calculation multiplies pool stock by equipment intensity and divides each equipment class by its life, then sums the annual results. It represents a steady stock with distributed replacement ages and counts primary whole-pump assemblies. The joint sensitivity ranges vary stock, equipment intensity and life together. Calculations use unrounded values; displayed counts round to the nearest thousand and percentages to a decimal place.

The worked territory uses 1,200 commercial water bodies, four representatives and a 65% compatible, service-accessible share with the central equipment settings. The benchmark workflow uses a 50-detection pilot per stratum and a 90-day priority commercial refresh. CDC's 2024 MAHC supplies the facility-versus-venue distinction. CPSC's undated drain-cover FAQ supports the technical handoff scope. The source register preserves each publication and its role in the calculation.

For repeatable property-list acquisition, PorchRocket's Ground Control publishes commercial pricing of $10 to $20 per building and delivery within 48 hours. Keep list acquisition, pool confirmation and equipment verification as separate research tasks, with dated evidence attached to the resulting property and assembly records.

Model equationAnnual replacements = sum(pool stock x pump positions per pool / equipment life)
Property equationCommercial properties = commercial pool water bodies / pools per property
Residential stock input, 2025Leslie's FY2025 Form 10-K
In-ground comparison input, 2025Pool Corporation FY2025 annual report
Equipment life cross-check, 2023ENERGY STAR pool-pump toolkit
Facility and venue scope, 2024CDC Model Aquatic Health Code

Related tools

Next step: Scope a pool asset search

FAQ

How many residential and commercial pools are in the US?

Anvilfield estimates 9 million residential pools, with a range of 8.1 million to 9.9 million, and 300,000 commercial water bodies, with a range of 240,000 to 360,000, in its analysis of the 2025 stock. Methodology records the published anchors and stock factors.

Does a commercial pool count equal a count of commercial accounts?

Link water bodies to properties before counting accounts. Anvilfield estimates about 240,000 commercial pool properties from 300,000 water bodies at the central 1.25 pools-per-property setting. A resort or aquatic facility can contain several water bodies, and a portfolio purchasing office can cover several properties.

Does a pool become commercial when a service company maintains it?

Keep a homeowner's pool in the residential segment and record its service contractor separately. The commercial operating segment used here covers professionally operated facilities such as hotels, apartment communities and water parks. Ownership, operation, maintenance responsibility and buying role remain separate attributes.

How much circulation-pump replacement demand does the installed base support?

Anvilfield estimates 1.57 million annual primary circulation-pump replacements, with a range of 1.04 million to 2.69 million, including 75,000 commercial replacements centrally. Methodology records the equipment classes, pump intensity and life settings.

Can aerial imagery identify the pump brand or installation date?

Use imagery to locate an outdoor pool and document visible property context. Verify equipment identity and installation history through nameplates, equipment-linked service records, commissioning documents or an authorized survey. Keep unknown equipment details unresolved until supported evidence is attached to the assembly record.

How should manufacturers include indoor pools?

Build a parallel inventory from facility records, operating permits and confirmed aquatic uses. Attach each indoor water body to its property, then verify the circulation equipment separately. Keep the evidence channel visible so the coverage report distinguishes outdoor imagery observations from indoor register confirmations.

Do these estimates include heaters, filters, spas and motor-only repairs?

The pool-stock scope excludes stand-alone spas, and the replacement model covers primary circulation-pump assemblies. Record motor-only work as repairs. Build separate attachment and life models for heaters, filters, chemical feeders, automation and other equipment, using the pool register as the shared location layer.

What should a manufacturer send to a distributor or dealer?

Send stable property and pool identifiers, dated asset evidence, operating segment, equipment compatibility status and the person responsible for the next question. Attach the current service channel and buying role when verified. Return dealer corrections to the same records so the market map improves after every technical review.

People also ask

Sources checked

  • Leslie's FY2025 Form 10-K FY2025, Industry: residential market approximately 9.0 million pools; professional operators approximately 300,000 pools. Extracted as stock anchors; these are the publisher's estimates. Checked 2026-11-05 with curl, HTTP 200.
  • Pool Corporation 2025 annual report FY2025, Item 1, Our Industry, printed page 1: approximately 5.5 million US in-ground pools. Comparison input for the assumed pump-class allocation; not an additional pool population. Company investor-relations PDF. Checked 2026-11-05 with curl, HTTP 200.
  • DOE dedicated-purpose pool pump final rule 2017, section IV.F.6, Equipment Lifetime: residential means 7 years self-priming, 5 years non-self-priming; commercial lifetime adjusted for operating hours. Commercial model lives and scenario endpoints are Anvilfield settings. Checked 2026-11-05 with curl, HTTP 200.
  • CDC Model Aquatic Health Code, fifth edition 2024 fifth edition, section 2, Glossary of Terms: facility contains one or more venues and supporting infrastructure. Used for the property/water-body distinction, not a national pool count. Checked 2026-11-05 with curl, HTTP 200.
  • CPSC Pool and Spa Drain Covers FAQ Undated current FAQ, accessed 2026-11-05: drain-cover compliance, manufacturer/importer certification and markings. Supports the equipment handoff; supplies no market count. Checked 2026-11-05 with curl, HTTP 200.
  • ENERGY STAR pool pump partner toolkit, August 2023 August 2023 toolkit, Product Specific Savings: 7-year in-ground pool pump lifetime cross-check. Savings and cost claims are not used in this model. Checked 2026-11-05 with curl, HTTP 200.
  • PorchRocket Ground Control, live page 2026 live page: business and property filters, commercial pricing $10 to $20 per building and delivery within 48 hours. Standard property filters and custom pool confirmation are separate tasks. Checked 2026-11-05 with curl, HTTP 200.
  • PorchRocket Asset Search, live page 2026 live page: custom finding and monitoring of assets visible from above; reviewed results with owner of record; scope-based quoted pricing. No dollar price used. Checked 2026-11-05 with curl, HTTP 200.