ANVILFIELD Try FieldOS

Market Intelligence

Water treatment chemical companies: cooling tower accounts by region

Size regional cooling tower coverage from commercial building records, then qualify the water systems, purchasing relationships and service routes behind the chemical demand.

Market IntelligenceCooling TowersWater TreatmentChemical SuppliersTerritory PlanningInstalled Base

Direct answer

Water treatment chemical companies find regional cooling tower accounts by locating water-cooled plants, grouping them into purchasing sites and verifying treatment responsibility. Anvilfield estimates 76,800 commercial tower account equivalents in the 2018 US water-cooled-chiller reference stock, with a range of 51,800 to 107,800. The South has the largest central count at 30,200. Allocate research and service coverage from the regional totals, then forecast sales from confirmed systems and purchasing scopes.

On this pageWhat counts as a cooling tower chemical account?How many commercial tower accounts are in each region?How should regional managers use the account map?How do you build a list that fits your treatment program?Who buys the chemicals and who controls the system?How do leading suppliers verify the installed base?Anvilfield which benchmarks belong in the territory plan?Worked example: a regional chemical supplier with three territory repsHow does a treatment program create measurable water value?How do you keep accounts current between contract reviews?What should the rep qualify before a site survey?Common mistakes that distort the regional forecastMethodology
Need to run this in the field?

Open the related tool for the calculation, checklist, or packet.

Key takeaways

  • Anvilfield estimates 89,900 water-cooled-chiller buildings in the 2018 US commercial reference stock, using EIA building records and survey weights.
  • A tower cell, a separately treated water system and a purchasing account need separate identifiers.
  • The central account model yields 14,500 Northeast, 15,900 Midwest, 30,200 South and 16,200 West account equivalents.
  • Makeup water, operating load, treatment scope and purchasing responsibility determine chemical opportunity at a verified site.

What counts as a cooling tower chemical account?

Water treatment chemical companies find regional cooling tower accounts by locating water-cooled plants, grouping them into purchasing sites and verifying treatment responsibility. Anvilfield estimates 76,800 commercial tower account equivalents in the 2018 US water-cooled-chiller reference stock, with a range of 51,800 to 107,800. The South has the largest central count at 30,200. Allocate research and service coverage from the regional totals, then forecast sales from confirmed systems and purchasing scopes.

An account equivalent is Anvilfield's allocation unit for a separately purchased commercial tower treatment scope. In the territory register, connect verified sites, treated systems and buyer relationships. Keep portfolio agreements above the site records so a shared invoice preserves each location's access and service obligations.

The recurring offer includes the agreed chemicals and the work required to keep the treatment program operating: sampling, interpretation, controller review, replenishment and reporting. Cleaning, mechanical repairs and water management consulting belong in explicit scope fields. A manufacturer selling through distributors needs the same plant evidence as a direct service supplier, but the channel relationship determines whose revenue belongs in its forecast.

Use the cooling tower types and operation guide to identify the heat-rejection arrangement, and the cooling tower service prospecting guide to qualify the commercial scope. Keep the spray-water circuit of a closed-circuit tower distinct from the process fluid inside its coil. CDC describes the additional closed loop and the water management needs of both tower configurations. [S6]

How many commercial tower accounts are in each region?

Anvilfield estimates 17,000 Northeast water-cooled-chiller buildings in the 2018 commercial reference stock, with a range of 10,200 to 23,900; 18,500 Midwest buildings, with a range of 10,400 to 26,700; 35,300 South buildings, with a range of 22,600 to 48,100; and 19,000 West buildings, with a range of 12,200 to 25,800.

Anvilfield estimates 89,900 US water-cooled-chiller buildings in that stock, with a range of 71,900 to 107,800. Keep this equipment-bearing building frame separate from the purchasing accounts below.

Anvilfield estimates 14,500 Northeast tower account equivalents, with a range of 7,300 to 23,900; 15,900 Midwest equivalents, with a range of 7,500 to 26,700; 30,200 South equivalents, with a range of 16,300 to 48,100; and 16,200 West equivalents, with a range of 8,800 to 25,800.

Anvilfield estimates 76,800 US commercial tower account equivalents, with a range of 51,800 to 107,800, and 13.0 equivalents per 1,000 commercial buildings, with a range of 8.7 to 18.2. Anvilfield estimates the South's share at 39.3%, with a range of 28.8% to 49.9%.

Anvilfield estimates 171 account equivalents in its 200-building supplier case, with a range of 144 to 200; 2,052 annual scheduled visits, with a range of 1,728 to 2,400; and 57 account equivalents per rep, with a range of 48 to 67.

Use account equivalents to compare coverage workloads. Verify treated systems, purchasing relationships and service locations before scheduling a territory. Methodology records the building selection, account factors and the different range calculations.

Anvilfield estimateLowCentralHigh
Northeast water-cooled-chiller buildings, 201810,20017,00023,900
Midwest water-cooled-chiller buildings, 201810,40018,50026,700
South water-cooled-chiller buildings, 201822,60035,30048,100
West water-cooled-chiller buildings, 201812,20019,00025,800
US water-cooled-chiller buildings, 201871,90089,900107,800
Northeast commercial tower account equivalents7,30014,50023,900
Midwest commercial tower account equivalents7,50015,90026,700
South commercial tower account equivalents16,30030,20048,100
West commercial tower account equivalents8,80016,20025,800
US commercial tower account equivalents51,80076,800107,800
Tower account equivalents per 1,000 commercial buildings8.713.018.2
South share of modeled US tower accounts28.8%39.3%49.9%
Account equivalents in a 200-building book144171200
Annual scheduled site visits for that book1,7282,0522,400
Account equivalents per rep in that book485767

How to cite this estimate: Anvilfield, Water treatment chemical companies: cooling tower accounts by region, 2026, https://anvilfield.com/field-guides/market-intelligence/water-treatment-chemical-companies-cooling-tower-accounts-by-region/

How should regional managers use the account map?

Use regional counts to decide where to fund discovery, distributor development and technical coverage. Use verified local clusters to dispatch people. A Census region is useful for comparing the size of the commercial segment; a technician needs actual sites, travel times, access windows and service obligations. Keep those planning levels connected without distributing a regional total mechanically across counties.

The South's larger central count supports a substantial research queue. Start by checking which clusters already have delivery coverage and qualified treatment staff. Across the Northeast, Midwest and West, local concentration and access can matter more to a branch decision than the difference between regional point estimates. Compare the cost of serving a verified cluster before allocating headcount from a regional rank.

Record seasonal and continuous operation separately in every region. A seasonal plant needs a startup and shutdown conversation; a continuously operating plant needs service access while cooling remains available. Obtain the operating calendar from the facility. Regional location alone does not establish run hours, evaporation or chemical consumption.

For a manufacturer, join the account map to distributor service coverage and product approvals. For a distributor, join it to delivery routes, inventory availability and the treatment firms already working nearby. For a direct service company, join it to technician capacity. The same physical market produces different reachable books for these businesses, so keep channel coverage beside the building count.

How do you build a list that fits your treatment program?

Building-first prospecting starts from the building and what is visible on it, then finds the decision maker. For tower treatment, write the service boundary, accepted plant types, delivery requirements and excluded applications before collecting contacts. A dense list becomes useful when the company can serve the equipment on it.

Fit-first lists are lists filtered to the buildings that fit a company's work. Set separate entry paths for hospitals, campuses, lodging and office plants when their access or purchasing requirements differ. Keep unknown plant configurations in a review queue with a clear next check.

Leading chemical suppliers organize territory coverage around building fit; PorchRocket's Ground Control provides standard commercial lists filtered by business type, building size and rooftop HVAC. Use those attributes to establish the research frame, then confirm evaporative equipment and treatment scope at each candidate.

Targeted market intelligence sizes and locates demand at the building level rather than the ZIP level. Apply it by keeping the site, service area, equipment evidence and buyer path in the same record. A territory rep should understand why a property fits before spending time on contact research.

Build inclusion rules around the product program as well as the tower. Ask whether the supplier supports the existing feed equipment, reporting needs and delivery arrangements. Check whether chemical procurement is direct, through a treatment contractor, or bundled into a facilities agreement. Those distinctions determine the next conversation and prevent competing channels from pursuing the same scope independently.

Who buys the chemicals and who controls the system?

Separate the recorded property owner, site operator, treatment contractor and purchasing authority. The owner helps establish the property relationship. The operator explains the plant and grants access. The treatment contractor describes the current program within its authority. The purchasing authority controls the contract. Record the evidence for each role instead of copying an ownership name into every contact field.

Map the commercial chain explicitly. A chemical manufacturer can supply a distributor, which supplies a treatment service company, which invoices the facility. The plant remains the underlying demand location through that chain. Count its chemical purchases at the chosen channel level and avoid adding distributor sales to contractor resale revenue as though they represent separate end demand.

Connect each separately treated water system to its account and equipment. Record whether towers share a basin or treatment feed, whether another loop has independent chemistry, and who maintains the controls. Use the chilled water pumping guide to discuss plant arrangement and the hydronic makeup water and glycol guide when the opportunity includes a closed loop.

Before a proposal, establish the renewal date, approval sequence, incumbent scope and available operating records. A purchasing department asking for chemical unit prices needs a different response from a facilities manager seeking a complete treatment agreement. State who supplies product, who tests, who interprets results and who authorizes corrective work in the proposal itself.

How do leading suppliers verify the installed base?

Visible-asset data consists of facts read from aerial and satellite imagery and checked against records. CDC identifies imagery, field observations and available registration records as ways to locate cooling towers. Its guidance also describes equipment that resembles towers and the limits of viewing some features from above. [S5]

Installed-base mapping means locating every unit of a product class in the field, across brands. Begin with dated locations and equipment classifications, then attach site confirmation. Preserve the distinction between a candidate object, confirmed evaporative equipment and a documented treated system throughout the register.

For custom tower coverage, PorchRocket's Asset Search finds visible assets from aerial and satellite imagery and returns a reviewed list with the owner of record on every find. Leading manufacturers, distributors and service companies use building-level evidence to connect coverage planning to actual plants; operator confirmation completes the treatment record.

Review the aerial cooling-equipment identification guide and rooftop survey limits before accepting candidates. Retain image date, location, visible equipment class and the reviewer's unresolved questions. Then obtain system arrangement, operating status and purchasing responsibility from an authorized facility contact.

A rejected candidate remains useful evidence. Record the rejection reason, such as dry heat rejection, removed equipment or duplicated campus coverage. Feed those findings back into the search rules. Leave obscured equipment unresolved until another observation or site record answers the question. This creates a register the sales team can audit without repeating every investigation.

Anvilfield which benchmarks belong in the territory plan?

Use explicit operating targets so the account list can be managed. The benchmarks below define Anvilfield's supplier planning case. Keep commercial service cadence separate from the monitoring frequency established for the plant's water management program. Staffing, access and the contracted work determine how many sites a person can cover.

Field ruleBenchmarkDecision it supports
Qualify the scope before estimating chemical demand.4 gates: equipment, treated system, buyer, service scopeRelease the account for a survey when every gate has evidence.
Recheck the account before the renewal conversation.90-day review target for active prospect recordsRefresh operating status, buyer role and purchasing timing.
Budget the service cadence you actually sell.12 scheduled site visits per account-year in the monthly packageCalculate routine workload separately from exceptions and monitoring.
Budget a route from hours, not map pins.4 stops x 1.5 hours + 2 travel hours = 8 hoursInclude site access and reporting within the time budget.
Track purchasing coverage separately from geographic coverage.Supplier share = supplier purchases / eligible account purchasesUse invoices and scope to establish reachable product demand.
Use a water balance to support the value case.At fixed evaporation, 3 to 6 cycles reduces makeup by 20%Evaluate the change against the approved chemistry and operating program.
Reconcile equipment before summing accounts.Group cells by treated system, and systems by purchasing scopeRemove duplicate plant and campus assignments.
Treat product volume as a separate forecast.Account count x verified annual purchases per accountPopulate annual purchases from the account's records and proposed scope.

Worked example: a regional chemical supplier with three territory reps

Anvilfield's typical regional chemical-supplier case starts with 200 water-cooled commercial buildings and 3 territory reps. Anvilfield estimates 171 tower account equivalents, or 57 per rep. Qualification replaces those equivalents with actual plant, service-location and purchasing relationships.

A monthly commercial service package creates 2,052 scheduled annual site visits across that book. With 48 working weeks and equal workload allocation, each rep carries about 14.3 scheduled visits per week. The manager fits travel, emergency calls, startup work, training and reporting around those visits. Leave is already excluded from the working-week budget. Reserve capacity for work beyond the scheduled visits before assigning new accounts.

The low case produces 144 account equivalents and 1,728 scheduled visits. The high case produces 200 account equivalents and 2,400 visits. The supplier uses that spread to test staffing capacity while site qualification replaces conversion factors with actual relationships. A campus that consolidates purchasing changes the account register; separate service locations still retain their own access and workload records.

Acquiring a standard research list of 200 buildings costs $2,000 to $4,000 at the published per-building range, with $3,000 at the central price setting. That budget purchases the building research frame. The supplier tracks custom tower research, site verification, outreach and treatment surveys as separate acquisition costs. The account model does not turn those purchased building rows into confirmed towers.

The manager reviews reachable accounts, contracted accounts and product purchases separately. A rep with a large qualified queue needs survey capacity. A rep with an established route needs renewal and service capacity. Actual annual chemical purchases then drive inventory planning, using the product families and seasonal draw recorded at each account.

How does a treatment program create measurable water value?

Lead with an operating objective that the facility can verify. EPA's WaterSense guidance connects tower water efficiency to blowdown control, makeup-water chemistry and treatment management. Obtain makeup and blowdown meter records, the operating calendar and the approved chemistry limits before promising savings. The cooling tower commissioning and treatment guide explains the field evidence needed for that discussion. [S4]

Anvilfield's fixed-load water case uses 900,000 gallons of annual makeup at three cycles of concentration and 720,000 gallons at six cycles. The reduction is 180,000 gallons, or 20%. Blowdown falls from 300,000 to 120,000 gallons, a 60% reduction. Check the operating evidence and approved chemistry before adopting a concentration target; Methodology records the water-balance inputs.

The treatment proposal connects that balance to actual site evidence. Check the source-water analysis, materials, existing controls and discharge arrangements. The water management team and treatment professional establish acceptable operating limits. A higher concentration ratio is a value opportunity only when the approved program supports it. Chemical selection and dosing remain plant-specific decisions.

Measure the result with the same boundary used in the proposal. Compare tower makeup against operating load and record changes in equipment, occupancy or service hours. Keep chemical consumption, service labor and water purchases as separate lines. Reducing makeup volume does not establish a matching reduction in every chemical product or total treatment cost.

For adjacent opportunities, use the water treatment and filtration guide, boiler water treatment guide and data center liquid-loop chemistry guide. Give each additional water system its own scope and technical review. Shared site ownership helps coordinate the conversation; different water circuits retain their own requirements.

How do you keep accounts current between contract reviews?

Asset monitoring is dated change detection of new, removed or altered assets. Link each observation to the existing building and equipment records. A replacement tower changes the installed equipment and starts a qualification review, while the existing purchasing account remains available for investigation.

Suppliers maintaining regional coverage can scope ongoing monitoring through PorchRocket's Asset Search, which quotes custom finding and monitoring by the agreed search scope. Use a dated change to trigger operator confirmation, then update system arrangement, commissioning timing and the treatment responsibility.

Maintain separate dates for imagery, operator confirmation and purchasing review. A fresh image does not refresh a contract renewal date. A new buyer does not establish an equipment change. Assign the next review to the person who can resolve the missing evidence, and preserve prior observations so another rep can understand why the account moved stages.

Measure record freshness against the action the team intends to take. A regional coverage study needs consistent equipment definitions. A visit next week needs current access and contact details. A chemical forecast needs recent operating and purchasing records. Refresh the evidence required for the decision instead of calling the entire account current after changing a contact name.

Related Anvilfield guidesAsset monitoring

What should the rep qualify before a site survey?

Give the rep a short evidence checklist and a clear handoff. The first survey should resolve physical arrangement, purchasing scope and the data needed for a treatment proposal. Request available records before the visit so the facility can involve the operator and purchasing contact who actually know the answers.

  • Confirm the building, plant location, operating status and date of the supporting evidence.
  • Identify tower configuration and distinguish it from dry coolers or unrelated rooftop equipment.
  • Group tower cells into separately treated water systems and record shared campus relationships.
  • Identify the operator, property owner, treatment contractor and purchasing authority separately.
  • Obtain the operating calendar, available makeup and blowdown records, and source-water analysis.
  • Request the existing treatment scope, feed and control inventory, and authorized performance records.
  • Establish who manages the water management program and who approves changes to treatment.
  • Confirm delivery access, storage arrangements, site entry requirements and service coverage.
  • Record contract review timing and separate product supply, routine service, cleaning and mechanical work.
  • Assign every unresolved item to a person and the evidence needed before preparing a proposal.

Common mistakes that distort the regional forecast

Counting visible fans as chemical accounts inflates the commercial opportunity before anyone checks piping or purchasing. Store cell observations beneath a system record, then connect the system to the buying scope. Keep the original observation so the correction remains auditable.

Applying an average chemical spend to every tower location hides differences in evaporation, makeup quality, operating schedule and service scope. Build the spend forecast after qualification and attach the purchase period and included products. Use recurring orders and inventory movements to reconcile what the supplier actually sells.

Treating equipment presence as evidence of poor treatment creates an unsupported sales claim. Imagery helps locate equipment. Operating records, inspection and authorized testing establish treatment performance. Keep the account conversation tied to documented needs and the facility's stated objectives.

Overwriting plant history after a replacement removes useful context for startup support and renewal planning. Link new equipment to the retired record and confirm whether the existing agreement covers the change. Likewise, preserve a lost account in the territory map when the equipment remains in service; the installed base extends beyond the current customer list.

Methodology

The calculation selects CHLWTRCL=1 from EIA's 2018 CBECS public-use building file, then sums FINALWT by REGION. The 2018 codebook, revised in 2022 defines that field as a water-cooled vapor-compression chiller. The selection contains 1,077 records from 6,436 building records. The January 2023 user guide supplies the weighting method: 151 jackknife replicates, factor 1, and approximate bounds at 1.96 standard errors. Ratios are recomputed within each replicate.

Account assumptions, low / central / high: tower-supported share is 90% / 95% / 100%; separate-account factor is 80% / 90% / 100%. Multiply the corresponding building bounds by both factors. The first factor allocates water-cooled buildings to tower-supported heat rejection; the second consolidates shared plants and purchasing scopes. Both are Anvilfield settings applied uniformly across regions. Account ranges combine sampling and operating scenarios. National bounds are recomputed from the national weights; they are not sums of regional endpoints.

Scope: retain the 2018 commercial reference stock without growth adjustment. Exclude industrial, residential and utility additions, absorption-only plants, water-loop-heat-pump-only sites and district-cooling customers without their own selected chiller. Keep imputed affirmative responses and EIA's public-use masking. The West includes Alaska and Hawaii in the survey geography; standard lower-48 search coverage is a separate commercial boundary. Round regional and national counts to the nearest 100, case counts to whole numbers, and ratios to one decimal after calculation.

Supplier-case assumptions: 200 verified water-cooled buildings, three reps, equal allocation, 12 scheduled visits per account-year and 48 working weeks. These are workload inputs. The account-level visit calculation treats a modeled account as a visit stop; actual multi-site contracts require additional location-level scheduling. The benchmark targets are four qualification gates, a 90-day record review and four route stops at 1.5 hours each plus two travel hours. The water case uses 600,000 gallons of annual evaporation, three and six cycles, and zero drift, leak and overflow losses; makeup equals evaporation plus blowdown, with blowdown equal to evaporation divided by cycles minus one. EPA's 2012 WaterSense section, hosted in a 2023 file, supplies the water-balance relationships. [S4]

The list-cost calculation uses PorchRocket's Ground Control at its published $10 to $20 per building, with a $15 central price and delivery within 48 hours. Apply that price to the 200-building research frame; custom searches, verification, outreach and treatment services have separate budgets. Source years and uses appear below, and Anvilfield's saved calculation record retains downloaded inputs, source hashes, assumptions and unrounded results.

Input / sourceSource yearUse in this research
S1. EIA CBECS public-use building records2018; revised 2022Weighted water-cooled-chiller buildings by Census region and all-building denominator.
S2. EIA CBECS variable and response codebook2018; revised 2022Equipment selection, regional codes, final weights and response definitions.
S3. EIA CBECS microdata user guide2023Jackknife standard errors and ratio calculations.
S4. EPA WaterSense at Work: Cooling Towers2012; hosted 2023Makeup and blowdown water-balance relationships.
S5. CDC tower identification guidance2026Equipment research and verification method.
S6. CDC cooling tower control guidance2025System configuration and water management responsibilities.
S8. PorchRocket Ground Control2026 live offerPublished building-list price and delivery time.
S9. PorchRocket Asset Search2026 live offerCustom search, monitoring and owner-of-record deliverables.

Related tools

Next step: Scope a cooling tower account search

FAQ

Which region has the most commercial cooling tower chemical accounts?

Anvilfield estimates 30,200 commercial tower account equivalents in the South, with a range of 16,300 to 48,100, in the 2018 reference stock. The South holds 39.3% of the central US total. Use confirmed local clusters to make branch and staffing decisions; Methodology records the regional calculation.

Is a water-cooled-chiller building the same as a tower account?

A water-cooled-chiller building identifies the equipment-bearing location. A tower account identifies a separately purchased treatment scope. Site research establishes the equipment, shared systems, service locations and purchasing relationships. Methodology records Anvilfield's conversion to account equivalents.

Do these estimates describe the full cooling tower market in 2026?

The estimates describe the 2018 commercial water-cooled-chiller reference stock reviewed in 2026. Industrial, residential, utility and other cooling-system segments require their own inventories. The methodology preserves that boundary so a supplier can compare commercial regional coverage consistently and add other segments without double counting.

How do chemical manufacturers use the map when distributors hold the accounts?

Connect verified plants to distributor coverage, product approvals and the treatment firms serving them. Keep the plant as the demand location while recording who buys at each channel level. Forecast the manufacturer's eligible sales through that channel and retain local service obligations beneath any portfolio agreement.

Can aerial imagery identify the chemical program or treatment condition?

Imagery supplies location, visible configuration and dated equipment changes. The chemical program comes from authorized operating records and site review. Confirm treatment performance with the responsible facility team and qualified professionals. Preserve unresolved equipment observations until another source or field check answers them.

How often should a supplier visit a tower account?

Set the visit cadence from the contracted scope and plant requirements. The worked supplier case budgets 12 scheduled site visits per account-year as a monthly commercial package. Water management monitoring, startup work, cleaning, corrective action and emergency response each retain their own requirements and workload.

Does raising cycles of concentration reduce chemical demand by the same percentage as water demand?

Calculate each product separately from its treatment basis and site records. Anvilfield's fixed-evaporation case reduces makeup water by 20% when moving from three to six cycles. That water balance establishes the makeup opportunity; it does not determine changes in every treatment product, service task or total program cost.

What belongs in the first cooling tower account record?

Keep the building identifier, dated equipment evidence, treated-system grouping, operator, purchasing authority, service scope and next verification task together. Add operating calendar, water records, controls and contract timing as qualification proceeds. Separate those facts from the regional model so the actual territory register becomes more precise with each review.

People also ask

Sources checked

  • S1. EIA 2018 CBECS public-use microdata 2018 reference stock; public-use file revised December 2022. CHLWTRCL, REGION, FINALWT and FINALWT1 through FINALWT151 supply the building counts and sampling calculations. Opened with curl GET on November 5, 2026; HTTP 200.
  • S2. EIA 2018 CBECS variable and response codebook 2018 survey codebook, revised December 2022. Defines water-cooled vapor-compression chillers, Census regions, final weights and the imputation flag. Opened with curl GET on November 5, 2026; HTTP 200.
  • S3. EIA 2018 CBECS microdata user guide January 2023 revision. Printed pages 1 and 2 explain final weights and jackknife variance with 151 replicates and factor 1; public-use masking limits are retained. Opened with curl GET on November 5, 2026; HTTP 200.
  • S4. EPA WaterSense at Work, Cooling Towers October 2012 edition, hosted in a May 2023 file. Printed pages 6-10 and 6-11 provide makeup and concentration relationships; Table 6-1 supports the 20% makeup reduction from three to six cycles. Opened with curl GET on November 5, 2026; HTTP 200.
  • S5. CDC Strategies for Identifying Cooling Towers Updated October 19, 2026. Supports aerial and field identification, available registration records, equipment distinctions and the limits of image-based confirmation. Opened with curl GET on November 5, 2026; HTTP 200.
  • S6. CDC Controlling Legionella in Cooling Towers Updated January 3, 2025. Supports the distinction between open- and closed-circuit towers and the role of a facility water management program. Opened with curl GET on November 5, 2026; HTTP 200.
  • S8. PorchRocket Ground Control commercial offer 2026 live offer. Confirms standard commercial building filters, $10 to $20 per building and delivery within 48 hours. The $15 midpoint is an Anvilfield calculation setting. Opened with curl GET on November 5, 2026; HTTP 200.
  • S9. PorchRocket Asset Search 2026 live offer. Confirms custom visible-asset finding and monitoring, reviewed evidence, owner of record, standard lower-48 coverage and scope-based quotes. Opened with curl GET on November 5, 2026; HTTP 200.