ANVILFIELD Try FieldOS

FieldOS for Landscaping

The field CRM for Landscaping crews.

Run landscaping jobs from the first visit to getting paid: capture the work in the field, build photo and checklist proof, send the customer a clean record, and run the operation offline. Built on the Anvilfield system, with every free landscaping calculator, checklist, and guide feeding in.

Works offline. Built for the truck, the roof, and the basement, not just the office.

CaptureProveSendGet paid

How it works

One flow, from the landscaping field to getting paid.

Capture the landscaping job in the field

Log the visit, the customer, the scope, and the readings once. No clipboard, no re-typing it at the truck.

Build the proof as you work

Before-and-after photos, checklists, and sign-offs attach to the job automatically and stay organized by stop.

Send a clean record

One link sends the customer a branded proof page with the photos and the work done, so they see a professional record.

Run the whole operation

Jobs, estimates, change orders, and customer history in one place, offline, syncing when you get signal.

Start free

The free landscaping tools that feed FieldOS.

Every Anvilfield landscaping calculator, readiness check, and field guide is free and works offline. Run them today; capture the job and the proof in FieldOS when you are ready.

Paver count calculatorFind how many pavers or bricks an area needs: area divided by the coverage of one unit, plus a waste allowance for cuts and breakage.Retaining wall calculatorFind the segmental wall blocks for a wall: face blocks = wall face area divided by the block face area.Bulk material calculatorEstimate the cubic yards, cubic feet, bags, and tons of mulch, gravel, topsoil, or sand for a bed or area from length, width, and depth.Deck board calculatorFind the deck boards for a deck: boards = deck area divided by the coverage of one board, plus waste.Drip run time calculatorFind a drip zone's precipitation rate and run time: rate = GPH x 1.604 / area, and run time = target depth divided by the rate.Fence post calculatorFind the posts, sections, and rails for a fence run: sections = length divided by post spacing.Track surfacing readinessA 2 minute check on whether your running track has the flat, sealed base, the right system thickness, and the geometry and certification it needs, before it ponds and fails.Dock & marina readinessA 2 minute check on whether your dock or marina handles electric shock drowning, the water environment, and the permits, before someone is hurt or the build is stopped.Deck construction readinessA 2 minute check on whether your deck has the ledger, footings, span, and guardrail to carry people safely, before a collapse or a fall.Exterior cleaning checkA 2 minute check on whether your pressure and soft washing matches the method to the surface, protects people and plants, and keeps the wash water out of the storm drain.

Offline landscaping field apps

Run your next landscaping job through FieldOS.

Open it in your browser or on the app and capture your next visit, nothing to install to try it. The customer gets a clean, branded proof record: the before-and-after photos, the completed checklist, the work done, and the sign-off, in one link.