ANVILFIELD Try FieldOS

Free book toolkit

Your Pressure Washing Starter Toolkit

The exact calculator, templates, checklists, and scripts from the book, ready to use. Set them up before your first call and you will be ready the moment the phone rings.

From the book How to Start a Pressure Washing Business by Marcus Reed. Everything here is free for readers, no purchase or sign-up required.

  • Pricing calculator: type in the square footage, get a price that respects your minimum
  • A ready-to-send quote and service-agreement template
  • The equipment shopping checklist from Chapter 2, in lean and pro versions
  • The First 50 Customers tracker from Chapter 5
  • A review-request swipe file plus a printable QR review card

Pricing calculator

Type in the square footage and the surface, and it returns a price that already respects your minimum and your rates. Fill in your own three core numbers once, and every future quote takes ten seconds.

Wall area for a house wash; ground area for flatwork.
Prefilled from the surface; edit to your own rate.
No profitable stop falls below this.
$0

The math is simple: rate times area, then check it against your minimum. You measure the surface, multiply by your per-square-foot rate, and if the result comes in under your minimum, you charge the minimum instead and add value (the front walk, the porch) so the customer feels they got a deal and you get a full, profitable stop. Set your three core numbers once and you never guess on a call again: (1) your job minimum (start at $199), (2) your house-wash rate per square foot (start at $0.20), and (3) your driveway rate per square foot (start at $0.20). Example: a 600 sq ft two-car driveway at $0.25 is $150, but your $199 minimum wins, so you charge $199 and throw in the front walk. A 1,800 sq ft house wall at $0.20 is $360, which clears the minimum on its own.

Download the rest of your toolkit

Print the templates and checklists, save the tracker, and make the QR card. They open on your phone or computer.

Did the book help? Leave a quick review

Thank you for reading the whole book and for putting in the work to build something real. If this book helped you see a clear path to your own business, a quick review genuinely makes a difference, and the author reads every one.

Leave a review