Anvilfield builds focused calculators and job tools that work on the jobsite with no signal. Each app does one thing well and runs entirely on your device. No accounts, no ads.
Apps
AmpRight
Electrical
AnchorProof
Post-installed anchor special inspection
Anchor Template Check
Pre-pour anchor-bolt template verification packets
Assured Ground Route
AEGCP continuity, terminal, color-cycle, repair, and export log
Backflow Test Report & Repair
Failed-test diagnosis, rebuild kit lookup, retest gate, and repair sheet PDF
BlindSide Spark DC
Spark-test voltage, holiday map, cover release, and survey export
BlowerCFM
HVAC airside commissioning, start-up, and service
BoulderRig
Boulder-wall, water-feature, and natural-stone landscape crews
BracePass DC
Tilt-up brace sizing, release checks, and export records
CascadeWright
Water-feature, pond build, and waterscape contracting
Cable IR Test Record
Offline cable insulation-resistance readings, photos, verdicts, and export
Clearance Proof
Line-clearance span photos, clearance math, sealing, and export packets
ChargeRight
HVAC/R service and install
CricketWright
Low-slope roof cricket and tapered insulation layout
CulvertCheck
Excavation, rural road, driveway, and culvert crews
CutEdge
Machining, CNC, drilling, and tapping
DeckCheck DC
Fall clearance, swing fall, leading edge, and fall-plan export
DeckFrame
Residential deck framing and prescriptive design
Deficiency Tag Loop
Fire-life-safety deficiency wording, photos, re-inspect tracking, and reports
DirtBalance
Excavation, site grading, and earthwork estimating
DoorCert
Automatic pedestrian door inspections, daily safety logs, and signed PDF reports
DropTakeoff Copper
Copper drop takeoff pricing, cost books, what-if bids, and clean exports
DryPlan S500
Water-damage restoration drying plans
Transformer Oil DGA Reader
Transformer oil grading, Duval DGA plots, C57.104 status, trend, and export
DGA Bottle Custody
Transformer oil sample bottle labels, photos, GPS stamps, and custody export packets
Oil Pass Gate
Transformer oil and electrical acceptance records, verdicts, witness guardrails, and exports
EVFeeder
EV charger load calculation, EVEMS managed demand, feeder sizing, and panel balance
FireBatt 72
NFPA 72 battery and NAC voltage-drop worksheets
FilmProof
SSPC-PA2 dry-film-thickness inspection log and signed conformance reports
FITUP DC
WPS bevel, root gap, land, and hi-lo targets with a phone angle check
FloorGrid DC
Raised-floor level acceptance grids, load test packets, and turnover exports
FreshTest DC
Concrete slump, air, temp, unit weight, yield, and truck PASS or FAIL records
GasTrunk
Plumbing, gas fitting, and HVAC install
GaugeGate DC
Datacenter duct gauge, leakage, layout, and balance records
GroutPour Baseplate DC
Non-shrink grout bags, substrate cure gate, pour log, and export packet
HeadRoom
Well, pump, and pump-house service techs
Hood Suppression Packet
NFPA 17A hood checks, link clock, nozzle map, hydro math, and AHJ reports
JointPlan
Concrete flatwork joint planning
Laydown Yard Map
Construction laydown grid, material pins, photos, search, and handover exports
LoopWright
Hydronic radiant installation
LotDoctor
Asphalt pavement maintenance and lot assessment
MatchRate
Irrigation service and water audit work
MatWindow
Asphalt paving and compaction timing
MeggerMind
Offline PI/DAR insulation resistance readings, trends, and export records
OhmGround FOP
Fall-of-potential ground resistance readings, 62% checks, photos, and reports
PanelCourse DC
Metal panel coursing, reveal hits, hang maps, and set-order cut lists
PanelRun
Electrical panel and circuit planning
Pay App SOV
Offline G702/G703-style SOV billing, retention, T&M, and closeout
PitWitness Test-Well
Offline ground test-well route readings, trends, photos, GPS stamps, and exports
Pick Planner DC
Crane lift-planning checks, radius charts, rigging notes, and export packets
PaverFit
Hardscape and interlocking paver layout
PaverPro
Concrete, masonry, and hardscape estimating
PlankPilot
Flooring layout and material planning
PoEHeat
PoE voltage drop, bundle heat, conduit fill, and 802.3bt power checks
Construction Job Cost Tracker
Earned vs spent crew hours per cost code, hours variance, and cost at completion
PourClock DC
Concrete evaporation timing and active pour gate alarms
PourPilot
Concrete and masonry job planning
Pull Plan Card
Cable pull planning, measured peak log, photos, and turnover card export
Reel Receiving
Cable reel receiving, damage photos, claim clock, and export packets
Restroom Route Score
Restroom APPA route scoring, photo proof, trends, and PM audit exports
RigChain
Rigging CG, sling tension, WLL checks, and signed rig sheets
RunoffRoute
Residential and light-commercial drainage work
Salt Cell Service
Salt dose, cell cleaning, diagnostics, and pool service proof
SaltLedger
Commercial snow and ice management
ScanMark DC
Concrete scanner readings, bit-depth stops, tendon STOP flags, and deck drill maps
ShaftLine DC
Shaft alignment moves, validity checks, and Final Alignment Records
ShoreSafe DC
OSHA trench slope, box reach, STOP call, and signed card export
SnapTime
Two-part structural silicone QC, lot trace, and snap-time batch records
SprayMix
Wood finishing and spray mix planning
SSO Clock
Sanitary sewer overflow timer, gallons estimate, and export packet
StaticFloor S20.20
ESD floor resistance and walking-body-voltage acceptance grids
StaticDoctor
Residential and light-commercial HVAC airside service
SteelCoat
Structural-steel coating takeoffs, gallons, kits, and priced bids
Storm Force-Account Log
Storm labor, equipment, photos, force-account packets, and Pro certification exports
Storm Material Slip
GPS-tagged material slips, photos, roll-ups, and yard-request exports for storm line crews
Switchgear Receive QA
Switchgear receiving packets, receipt notes, damage photos, shortages, and claim-window reminders
StringerWise
Stair stringer layout for carpentry and framing
StripeSet
Parking-lot striping and paving maintenance
SunVault
Off-grid and mobile solar planning
TapWise
Machining, CNC, fabrication, and tapping
TieMap DC
Scaffold tie maps, daily inspection, and tag-record export
T&M Ticket
Signed extra-work T&M tickets, evidence photos, PDF export, and office CSV
TrayFill Copper
Cat6A tray fill, conduit sleeve, J-hook support, and segment reports
TrenchSafe
Excavation, utility, and earthwork safety
TitrateSuite DC
Drops-to-ppm, loop volume, pump feed, and passivation field aid
TurfClock
Lawn-care and turf IPM season programs
TurfRate
Lawn, landscape, and turf application rates
UCPercent
Undercarriage wear measurements, percent-worn scoring, and signed reports
UpliftZone
Commercial low-slope roof wind-zone and fastener planning
DWV Sizing: Plumber Exam Prep
Worked DWV sizing practice for IPC plumber exams, plus the field calculator
VectorMap ELD
Electronic leak detection survey grid, breach map, and report export
WallWright
Concrete, masonry, and hardscape wall planning
WaterMistProof DC
NFPA 750 water mist zone acceptance records, discharge timing, and signed export
WaterShot DC
Water-main thrust restraint and hydro test records
WasteTrack DC
Construction waste diversion, haul tickets, roll-off boxes, and owner reports