AAV

AAV means air admittance valve, a vent component whose branch and stack capacities must be read separately. Oatey’s model 39223, for example, carries 160 branch DFU and 500 stack DFU ratings despite using one 3 to 4 inch adapter. Selection also depends on the stack’s branch intervals and relief venting. An adequate local DFU rating cannot resolve positive pressure elsewhere in the drainage system.

Air admittance valve, a one-way valve that admits air under negative pressure; failure open can release gas, while failure closed can disturb drainage and trap seals

Used across 4 Anvilfield field guides, most in Plumbing.
Updated

Read both capacities on the valve label

Oatey rates its 3 to 4 inch Sure-Vent model 39223 for 160 branch DFU or 500 stack DFU. Those are two application ratings on one product, not interchangeable measures of the same installation. Match the proposed vent duty to the corresponding rating before using the adapter size as a purchasing shorthand.

Oatey states that this model receives functional testing at 1/4 inch and 30 inches of water column. These are manufacturer test conditions, not permissible operating pressures for the building drain or settings for a field pressure test. The product label and submittal distinguish a verified valve from an unlabeled mechanical vent.

Keep pressure testing out of the installed valve

The 2025 Plumbing Code of New York State, Section 918.2, requires AAV installation after the DWV test. Leaving the valve off until that test is complete also leaves its threaded connection available for the specified test closure. Install the selected valve after the piping test record is established.

ASSE’s catalog lists stack-valve standard ASSE 1050-2021(R2026) and individual/branch standard ASSE 1051-2021. New York’s 2025 code references the 2021 editions of both; the later reaffirmation in the publisher’s catalog is a separate edition record. Put the applicable standard and complete model number on the submittal beside the duty. The AAV and island-vent guide maps the vent arrangements.

Check branch intervals before specifying a stack valve

New York’s 2025 plumbing code prohibits a stack AAV as the terminal for a drainage stack with more than six branch intervals. Section 918.3.1 separately requires a relief vent when an AAV-served horizontal branch lies more than four branch intervals below the stack top. Floor count and branch interval count are not substitute descriptions.

This matters in a tenant fit-out: a valve adequate for the local fixture load does not resolve a distant stack’s relief-vent requirement. Mark the branch connection on the riser and count intervals there. Carry that drawing into the DWV vent-sizing review, rather than treating the cabinet installation as the entire vent design.

Distinctions

Branch rating
Describes the permitted fixture load for the branch application; it is not the stack rating printed beside it.
Open vent terminal
Communicates with atmosphere in both directions. An AAV closes under positive internal pressure.

Frequently asked questions

Can a 160 DFU valve serve a 500 DFU stack?

Only a model specifically rated for 500 stack DFU, installed within its listing and the governing stack limitations, has that capacity. Read the complete rating.

Should the AAV be fitted during the drain test?

Under New York’s 2025 Section 918.2, complete the Section 312.2 or 312.3 DWV test before installing the valve. The manufacturer’s factory functional-test pressures describe a different test.

Sources checked

Also defined as

  • Air admittance valve, a one-way valve that admits air on negative pressure and seals against sewer gas; often called a Studor vent after the original brand
  • Air admittance valve, a one-way valve that admits air and seals against gas, accepted under the IPC and restricted under the UPC

Where this shows up