Field glossary · component
Cleanout
A cleanout is usable drain-service access only when its closure, cover and tool clearance all work together. New York’s 2025 Section 708.1.10 requires 18 inches clear perpendicular to the opening for piping through 6 inches, and 36 inches for 8 inch and larger piping. Measure at the plug opening, including cabinet obstructions. A decorative plate or temporary test closure does not establish a complete permanent assembly.
A capped access fitting on a drain line; a missing or loose plug is a direct opening for sewer gas
The cover screw must not create a leak path
The 2025 Plumbing Code of New York State, Section 708.1.7, requires a manufactured blind-end threaded hole where a trim-cover screw enters a cleanout plug. Drilling an ordinary plug through to receive a decorative plate defeats that detail by opening a route through the drainage closure.
Section 708.1.11.1 also requires corrosion-resistant fasteners where the cover threads into the plug. Match the plate, fastener and closure as an assembly. The sewer-odor guide explains why an apparently minor closure defect produces an occupied-space complaint.
A test closure and a permanent plug are separate purchases
Sioux Chief expressly excludes permanent service for its 882-96 HandTite test plug. That model left in a finished cleanout is still temporary test equipment; replace it with the permanent closure specified for the assembly.
Identify the maker and model on any expansion-style closure found in service. Some products are repair closures with their own approved duty; others are temporary test equipment. Rubber and a wing nut do not identify which one is installed. Restore the specified permanent closure after testing or cleaning instead of leaving that decision to the next service call.
Measure from the opening face, including small pipe
New York’s 2025 Section 708.1.10 measures working clearance perpendicular to the opening face. A 2 inch cleanout follows the same 18 inch rule as a 6 inch cleanout in this edition. Measure to the nearest obstruction with the cabinet and equipment installed, rather than accepting the rough-in aisle width.
At a wall opening, Section 708.1.11 limits the setback of the opening face to 1 1/2 inches from the finished wall surface. A deep recess behind a small cover can prevent tool engagement even when the visible wall plate looks accessible. Include finish thickness in the rough-in measurement. The cleanout access guide covers the drainage layout that brings the machine to that opening.
| Drain served | Required perpendicular clearance |
|---|---|
| 6 inches and smaller | 18 inches minimum |
| 8 inches and larger | 36 inches minimum |
Floor traffic loads belong on the floor assembly
New York’s 2025 Section 708.1.11.2 requires an ASME cleanout assembly where vehicular loads need protection, and its standards chapter cites A112.36.2M-1991(R2022). ASME’s current replacement publication is A112.36.2-2022/CSA B79.2:22. Preserve that distinction on a substitution submittal: a current product standard and the edition incorporated by the code are separate records. Identify the floor assembly’s load rating before an equipment aisle or vehicle route opens.
Distinctions
- Trim cover
- Finishes or protects the opening. The underlying closure provides the drainage seal.
- Masonry cleanout
- An inspection and debris-removal opening in a masonry grout cell, with a different construction purpose from drain access.
Frequently asked questions
Can I screw a plate through an ordinary cleanout plug?
Use a plug manufactured with the required blind threaded hole and the matching cover hardware. A through-hole compromises the closure.
Does every rubber expansion plug qualify for permanent service?
No. Read the exact product duty; the cited Sioux Chief test plug explicitly excludes permanent use.
Sources checked
Also defined as
- Concrete: An opening cut at the base of a grouted cell to clear droppings and inspect the grout on a high-lift pour
- The capped access fitting you run a cable or hose through