Field glossary · material
FOG
FOG means fats, oils, and grease in wastewater. A FOG result in milligrams per liter is an analytical concentration, while an interceptor’s grease-layer measurement describes accumulated material inside equipment. Those measurements answer different questions. The laboratory method, sampling point, and discharge authority belong beside the concentration before anyone labels the result compliant or excessive.
Fats, oils, and grease, the regulated material the interceptor is built to capture
What EPA Method 1664B actually weighs
EPA Method 1664B, Revision B dated February 2010, defines HEM as n-hexane extractable material and SGT-HEM as the portion remaining after silica-gel treatment. The second result is a nonpolar fraction; it is not an interchangeable name for every oil-and-grease result.
EPA Method 1664B includes relatively nonvolatile hydrocarbons, vegetable oils, animal fats, waxes, soaps, and greases in its HEM measurement. The analytical category is broader than food grease alone. A rise in HEM therefore needs a source investigation rather than an automatic assumption that the kitchen interceptor has failed.
EPA Method 1664B specifies a measurement range of 5 to 1,000 mg/L and a minimum quantitation level of 5.0 mg/L. A report below that quantitation level is not proof that the sample contains zero FOG. Preserve the laboratory’s reporting qualifier instead of converting it to a zero in a maintenance spreadsheet.
EPA Method 1664B requires analysis within 28 days of sample collection. The collection timestamp and laboratory receipt record therefore affect whether an otherwise precise-looking number is usable.
A layer percentage cannot be converted to mg/L
An interceptor inspection measures retained grease and settled solids against the unit’s liquid depth. An effluent sample measures material carried in a particular water sample. A recently pumped interceptor and a low discharge concentration are separate findings; neither measurement establishes the other.
Keep pump-out records with layer measurements, tank identification, and waste removal details. Keep discharge results with sampling location, date, method, units, and the applicable permit or sewer-use limit. Combining both records on a trend chart is useful, but they need separate axes and labels.
Why the local limit stays attached to the result
EPA’s October 2023 FOG webinar presents municipal programs with different concentration limits and analytical methods. That comparison supports a practical rule: the number in another utility’s program is not the discharge limit for this connection.
A permit review should resolve whether the limit addresses HEM, another defined fraction, or a separately specified method. Reporting “FOG passed” hides the exact test that passed. Name the parameter and retain the original report so a change in laboratory method does not look like a sudden treatment improvement.
The interceptor guide covers equipment service, while drain cleaning addresses deposits in piping. Laboratory FOG belongs to the discharge record rather than either maintenance measurement.
Frequently asked questions
Does a FOG laboratory result measure the grease layer in an interceptor?
No. The laboratory reports extracted material per volume of sampled wastewater, usually mg/L. An interceptor inspection reports retained layer depths or their share of liquid depth; keep those records separate when deciding whether pump-out or discharge treatment needs attention.
Sources checked
Also defined as
- Fats, oils, and grease that congeal on the pipe wall