ANVILFIELD Try FieldOS

Field glossary · measurement

DFU

DFU means drainage fixture unit: the code’s loading assignment for a fixture or discharge entering a drain. New York’s 2025 Table 709.1 assigns different DFU values to a 1.6 gpf private toilet and a public toilet at the same flush volume, 3 and 4 respectively. Occupancy and fixture type therefore matter alongside flow. Sum the applicable assignments along each drainage segment, then use its drain or vent capacity table.

Drainage fixture unit, a dimensionless load value for a fixture used to size drains and vents; one DFU is about 7.5 gallons per minute of discharge

Used across 3 Anvilfield field guides, most in Plumbing.
Updated

The same flush volume can carry a different DFU load

New York’s 2025 Table 709.1 distinguishes fixture use as well as water consumption. Its 1.6 gpf private water closet is 3 DFU, while the public version is 4 DFU; a flushometer-tank water closet is 4 DFU in either setting. Record the fixture category before totaling the branch.

A schedule of four public 1.6 gpf water closets totals 16 DFU. Copying the private-fixture value would produce 12 DFU, an undercount of 4. Both schedules describe four fixtures using the same flush volume, but only one applies to that public installation.

Water closet category in Table 709.1DFU per fixture
Private, 1.6 gpf3
Public, 1.6 gpf4
Flushometer tank, public or private4

Use the gpm conversion only where the code calls for it

The 2025 Plumbing Code of New York State, Section 709.3, assigns two DFU per gallon per minute where the discharge is known only as a flow rate. A documented 4 gpm discharge therefore becomes 8 DFU under that provision. This is a specified loading conversion, not a statement that ordinary fixture units each discharge 0.5 gpm continuously.

The direction matters. Start with a known flow when using that provision; do not reverse it to derive the actual instantaneous discharge of a toilet, basin or bathroom group. The DWV sizing guide describes how the resulting load totals pass through the drainage sizing tables.

Indirect receptors inherit the load they receive

New York’s 2025 Section 709.4 assigns an indirect-waste receptor the sum of the fixture-unit values discharging into it, with a floor at the receptor’s own tabulated value. A floor sink label alone therefore does not establish the connected drainage load.

If the connected equipment totals 8 DFU and the receptor’s applicable tabulated value is 2 DFU, the receptor load is 8 DFU. If the connected sum is lower than its own required value, retain the higher receptor value. Keep the equipment list with the receptor schedule so later additions do not disappear behind an unchanged floor-sink symbol.

The clear-water exception has a defined scope

New York’s 2025 Section 709.4.1 gives a one-half DFU value to receptors receiving only clear-water waste from the listed refrigerated cases, ice bins, coolers and freezers. That narrow provision does not assign every commercial floor drain one-half DFU.

Identify what actually reaches the receptor, including later equipment additions. A receptor receiving food-preparation waste or other discharge cannot be classified by its original cooler connection alone. The building-sewer guide follows these upstream loads into the exterior drainage system.

Vent ratings do not size the drain beneath them

Oatey publishes separate branch and stack DFU ratings for its Sure-Vent products. Those ratings describe the valve’s listed venting duty. A valve with adequate DFU capacity does not establish drain diameter, slope, trap-arm geometry or the permitted vent arrangement. Retain those checks as separate parts of the drainage design.

Distinctions

WSFU
Water supply fixture units estimate supply demand. They belong to supply tables and cannot replace drainage fixture units.
gpm
A volumetric flow rate. DFU is a relative code loading value, with a special flow-to-load rule where the cited provision applies.

Frequently asked questions

Can I divide total DFU by two to get design gpm?

Section 709.3 converts a discharge already known in gpm into a code load. Reversing that special assignment does not recover the simultaneous discharge from a mixed fixture schedule.

Can I size a floor sink from its outlet diameter alone?

The receptor’s minimum size and its connected load are separate checks. Identify the equipment discharging into it and apply the receptor loading provision.

Sources checked

Also defined as

  • Drainage fixture unit, the dimensionless load value that sizes drains and wet vents; a full bathroom group runs about 5 DFU
  • Drainage fixture unit, the load currency that sizes the sewer against the code table

Where this shows up

Next step: Track kitchen drain projects

Back to the full field glossary