Field glossary · measurement
CCT / CRI
Correlated color temperature (CCT) describes the apparent warmth of white light in kelvin; color rendering index (CRI) describes average color fidelity relative to a reference at the same CCT. Neither predicts the other. Two 4000 K lamps can differ in green or pink tint and in how they show red objects. A useful substitution review therefore includes measured chromaticity, CRI Ra, saturated-red R9, and the specified color-rendering report.
Correlated color temperature in kelvin (warm to cool) and color rendering index on a 0 to 100 scale
Why two lamps marked 4000 K look different
The U.S. Department of Energy explains that positive Duv places a white source above the blackbody locus with a greenish tint, while negative Duv places it below with a purplish tint. CCT locates the source along that locus; Duv describes its displacement from it. A shared nominal CCT leaves that second coordinate unresolved.
Order replacement luminaires by the complete color option and approved submittal. A room with a green cast after a nominally matching replacement needs a chromaticity comparison with the retained fixtures. Raising or lowering the CCT selector does not directly correct a Duv mismatch. DOE identifies ANSI/IES TM-40-24 as the method for calculating CCT and distance from the Planckian locus.
What the CRI average leaves out
NIST states that general CRI, Ra, averages the individual color-rendering indices of the first eight test samples, which have low to moderate saturation. A strong average therefore leaves room for poor treatment of a particular color. It also compares against a reference matched to the test source CCT, so a higher CRI is not a promise of cooler or warmer light.
DOE's LED Color Characteristics fact sheet identifies R9 as the separate index for the strong-red sample and confirms that it is excluded from the Ra average. Request R9 when evaluating red merchandise, skin appearance, or colored finishes. Keep the submitted value with the selected product rather than treating a marketing description such as full spectrum as a test result.
Use the TM-30 report for color-critical substitutions
The current IES color-rendition method listed by DOE is ANSI/IES TM-30-24. DOE's tutorial describes TM-30 as evaluating 99 color samples and using 16 hue-angle bins to show where the color shifts occur. Its fidelity index Rf and gamut index Rg answer different questions: overall color difference and average gamut change.
In DOE's explanation, an Rg above 100 indicates an average increase in gamut area, while an Rg below 100 indicates a decrease. Read the color-vector graphic alongside the average values. A substitution with the same Ra can increase the saturation of one hue and reduce another, changing how the room's materials appear.
Which instrument verifies delivered color?
Use a spectroradiometer or lighting spectrometer that measures spectral power distribution and calculates the specified indices. A basic illuminance meter reports light quantity and cannot establish CRI from its footcandle reading. Measure the product at its scheduled CCT setting and operating condition, and retain the instrument report with its model identification.
The commercial lighting design guide supplies task levels and layout. This color review adds the spectral evidence needed when the delivered product changes during an LED retrofit.
Distinctions
- CCT versus LED temperature
- Kelvin in a CCT rating describes light appearance. It does not report the LED junction, heat sink, or room temperature.
- CRI versus efficacy
- CRI describes color fidelity. Efficacy describes lumens per input watt. A product substitution must satisfy each scheduled requirement separately.
Frequently asked questions
Does 90 CRI mean every color is rendered at 90?
No. Ra is an average of eight sample indices. R9 and the TM-30 hue results expose information that this average leaves out.
Can CRI be below zero?
Yes. DOE and NIST explain that negative CRI values are possible. Zero is not the mathematical floor, even though common product descriptions present CRI as a 0 to 100 scale.