Field glossary · measurement
Lux (lx)
A lux (lx) reading reports illuminance at a specified position and sensor orientation, in lumens per square meter. NIST's conversion factor makes 500 lx equal to 46.45 footcandles. At that reference level, the Testo 540's stated accuracy allowance is 16 lx, including its display digit, under the manufacturer's reference conditions. Changing units rescales that same allowance; retain the measurement plane and instrument specification with the reading.
Metric illuminance, one lumen per square meter; 1 fc is about 10.76 lux
Why two lux meters disagree under LEDs
NIST SP 250-95, Photometric Calibrations, describes illuminance-meter calibration with incandescent lamps at 2856 K unless another condition is requested. NIST identifies spectral mismatch as an error when that calibrated meter measures a different source spectrum. The calibration certificate therefore needs more than a date: the calibration source and any source-specific correction determine how the result transfers to an LED installation.
A filter photometer approximates the eye's wavelength response. Equal readings under the calibration lamp do not establish equal readings under every LED. When comparing a replacement meter with an existing survey, keep the luminaires and dimming state fixed and compare both instruments at the same point. Use the white-space verification guide for the room survey; resolve instrument response before treating the difference as a lighting defect.
Resolution is smaller than measurement error
Testo's 540 instruction manual specifies 1 lx resolution through 19,999 lx and 10 lx resolution above that range. Testo specifies an accuracy allowance of the greater of 3 lx or 3 percent of the reference, plus one display digit, at a nominal temperature of 25 C. Those are separate specifications: a one-lux display increment does not establish one-lux accuracy.
At a 500 lx reference, the percentage term is 15 lx, larger than the 3 lx fixed term; adding the one-lux digit gives a 16 lx allowance under the stated conditions. At 20 lx, the fixed term dominates, giving 4 lx including the digit. An apparent one-lux improvement near a lighting threshold is smaller than either allowance.
Record the plane and the meter's hold mode
Testo's 540 manual instructs the user to hold the instrument horizontally with the sensor facing upward. That arrangement measures a horizontal plane; a vertical rack-face survey needs the receiving surface aligned with the rack face. Record that change of orientation so the two surveys remain distinguishable in the lighting design record.
Testo provides current, Hold, Max, and Min display modes. Ordinary Hold freezes the captured reading; it does not supply a delayed exposure or automatically remove the operator's shadow. Record the active mode with each survey. A maximum retained while walking between points is not the illuminance at the final stationary location.
Distinctions
- Footcandle
- Changing the displayed unit rescales the reading and its tolerance; it does not improve the sensor.
- CCT / CRI
- Color descriptors do not supply the full spectral distribution needed to calculate a meter-specific spectral correction.
Frequently asked questions
Can a lux meter report LED flicker?
A steady illuminance reading does not describe the time waveform. Use an instrument with the required temporal response and flicker measurement function.
Does a calibration sticker prove the LED reading is accurate?
The sticker identifies calibration status. The certificate, source spectrum, instrument response, and measurement geometry establish the applicable accuracy.
Sources checked
Also defined as
- Datacenter: Illuminance of one lumen per square meter, the metric unit on most cut sheets
- Datacenter: Illuminance of one lumen per square meter, the metric unit