ANVILFIELD Try FieldOS

Field glossary · measurement

Footcandle (fc)

A footcandle (fc) is a surface illuminance unit: when 100 lumens land uniformly on 25 ft², the result is 4 fc, equivalent to 43.06 lux. Treat the reading as a location-and-plane measurement. The same meter held horizontally at a desk and vertically at a label answers different task questions. Record the lighting state and sensor orientation with the number; a bright-looking room does not supply those details.

Illuminance at a surface, one lumen per square foot

Used across 2 Anvilfield field guides, most in Electrical.
Updated

How distance changes a footcandle reading

Lighting manufacturer CCS explains that doubling the distance from a point source reduces illuminance to one quarter, while tripling it reduces illuminance to one ninth. The working relationship is E = I / d² for light arriving perpendicular to the receiving plane. With intensity in candelas and distance in feet, E is in footcandles.

A 1600-candela beam produces 16 fc on a perpendicular surface 10 ft away and 4 fc at 20 ft. This is useful for understanding a mounting-height change or an aimed beam. An extended linear fixture close to a workbench needs its full photometric geometry; a point-source shortcut loses accuracy as source dimensions become significant relative to distance.

Why aiming the sensor at the lamp overstates the task

CCS describes Lambert's cosine law as illuminance decreasing in proportion to the cosine of the angle from the surface normal. At the same source distance, a 60-degree incidence angle delivers half the illuminance obtained with perpendicular incidence. Tilting the detector to face the luminaire changes the receiving plane and changes the question the reading answers.

Keep the detector aligned with the actual task surface. On an inclined drafting surface, match that incline. At a vertical nameplate, keep it vertical. A cosine-corrected receptor accounts for incident light arriving obliquely to that plane; it does not correct an operator who has pointed the meter at a different plane. The white space verification guide applies this distinction to rack faces.

Which footcandle limit applies to the work?

Washington WAC 296-800-21005 requires at least 10 fc average for indoor task activities and permits no individual measurement used in that average below 5 fc. The same rule specifies measurement 30 inches above the floor or working surface at the task. These are Washington workplace safety minimums, a different basis from a project lighting recommendation.

That rule also sets outdoor task activities at 5 fc average with a 2.5 fc individual minimum. Name the applicable jurisdiction and task beside the criterion. A building lighting specification, a workplace safety rule, and an emergency egress requirement each define their own receiving plane and acceptance conditions. The egress lighting guide covers emergency operation separately.

Resolution is smaller than measurement accuracy

Extech lists 0.01 fc resolution and ±5 percent basic accuracy for its LT300 meter, with cosine and color correction. The smallest displayed increment is therefore not the measurement uncertainty. At 10 fc, a 5 percent term alone is 0.5 fc; a display reading to hundredths does not establish hundredth-footcandle accuracy.

Use the instrument's applicable range and complete accuracy specification in a close acceptance decision. Preserve the measured value rather than rounding it upward to the threshold, and retain the meter model so a reviewer can identify the specification used.

Calculate an average that represents the area

An arithmetic mean represents the surveyed area when each reading represents an equal area. Taking extra readings under the brightest fixtures gives those bright locations extra influence. Establish equal-area cells or weight each reading by the area it represents when the grid is irregular.

Four equal-area readings of 8, 12, 16, and 20 fc average 14 fc. The minimum is 8 fc and the maximum-to-minimum ratio is 2.5:1. Adding three extra 20 fc readings at the same bright location raises the unweighted mean to 16.6 fc without improving any dark location. Keep the grid with the results so the average remains reproducible.

Distinctions

Footcandle versus luminaire lumens
Lumens describe total luminous flux. Footcandles depend on where that flux lands, including distance, incidence angle, optics, and reflected light. A lumen rating alone cannot establish a surface reading.
Average versus minimum
Average describes the sampled area as a whole. Minimum identifies the darkest measured point. An acceptance requirement can constrain both independently.

Frequently asked questions

Is 500 lux exactly 50 footcandles?

No. Using 10.7639 lux per footcandle, 500 lux is 46.45 fc and 50 fc is 538.20 lux. Retain the specified unit when judging a close result.

Should a footcandle meter face upward?

Only when the receiving plane is horizontal. Match the sensor to the desk, floor, wall, or inclined surface whose illuminance the report is meant to describe.

Sources checked

Also defined as

  • Datacenter: Illuminance of one lumen per square foot, the US unit on most drawings
  • Datacenter: Illuminance of one lumen per square foot; 1 fc is about 10.76 lux

Where this shows up

Related guides

Next step: Build a lighting territory