Field glossary · measurement
LPD
Lighting power density (LPD) turns a lighting schedule into a floor-area power figure: 6000 W assigned to 10,000 ft² is 0.60 W/ft². Compare that installed value with the allowance built under the adopted energy code and its chosen calculation method. Occupancy savings reduce operating energy but do not automatically remove connected watts. The included fixtures and area boundary must match for the ratio to support a compliance decision.
Lighting power density, watts per square foot, capped by the energy code on a triggered alteration
Count the input watts the code actually assigns
Washington's 2021 commercial energy code, WAC 51-11C-405051, counts ballast or transformer input wattage when it operates the lamp. Its modular-lighting provision uses the maximum rated input wattage of the driver, power supply, or transformer. A lamp's output-side rating is therefore an incomplete basis where conversion losses sit upstream.
A schedule with 100 luminaires rated at 40 W totals 4000 connected watts. If the approved product changes to a 44 W input model, the installed total becomes 4400 W even when its LED board still carries a 40 W description. Put the complete luminaire or system input rating in the takeoff and carry substitutions into the compliance schedule.
Build the wattage allowance before judging the ratio
Washington WAC 51-11C-405053 assigns an office building-area allowance of 0.64 W/ft² under its 2021 commercial code. On that basis, a 10,000 ft² office has a 6400 W lighting allowance. A 6000 W installation is 0.60 W/ft² and leaves 400 W of allowance; another 500 W of counted lighting raises the total to 6500 W and exceeds it by 100 W.
The denominator must describe the same area served by the counted lighting. Including unfinished tenant space in the floor area while omitting its lighting creates a false reduction. WAC 51-11C-405052 requires the space-by-space method for projects involving only portions of a building and for buildings with unfinished spaces. Preserve the project boundary and room-use classifications with the calculation.
Separate connected demand from annual lighting energy
A 6000 W installation operating 3000 equivalent full-output hours uses 18,000 kWh. Occupancy control that cuts equivalent hours to 1800 reduces that figure to 10,800 kWh while leaving its 0.60 W/ft² connected LPD unchanged. Power and energy belong in separate columns of the retrofit comparison.
Apply a control-related power adjustment only where the selected code method expressly provides one. A control sequence that saves energy also needs its own compliance review. Passing the wattage calculation does not demonstrate that occupancy, daylight, scheduling, or functional-testing requirements have been met. The lighting design guide connects these requirements to the layout.
Keep the published edition distinct from the adopted code
ANSI/ASHRAE/IES 90.1-2025 is the current published edition as of November 5, 2026; ASHRAE lists its revised interior and exterior lighting power-density provisions separately from controls. Its publication does not replace an earlier edition named in an adopted state or local code. Put the actual compliance basis on the drawing and calculation cover sheet.
For an LED replacement project, reconcile counted lighting against the approved exclusions. Washington specifically excludes exit signs and emergency lighting that is automatically off during normal building operation. A normal-use luminaire with an emergency driver still supplies normal lighting and needs its normal input power counted.
Distinctions
- Allowed LPD versus installed LPD
- Allowed LPD is a code-table budget by building or space use. Installed LPD is the power assigned to the actual lighting divided by its area. Both need the same method and boundary.
- Luminaire efficacy
- Two luminaires drawing the same watts contribute equally to installed LPD even if one emits more lumens. That output difference changes efficacy and potentially task illuminance; it does not change the connected-power numerator.
Frequently asked questions
Does dimming a fixture reduce its LPD?
Ordinary operating dimming lowers current energy use. Use the power rating required by the selected compliance method unless that method recognizes the specific permanent limitation or adjustment.
Can spare watts in one room cover another room?
Sum the permitted project allowances under the selected method. Washington C405.4.2.2.1 reserves additional lighting power for the specified luminaires and use; that restricted allowance cannot cover unrelated lighting elsewhere.
Sources checked
- Washington 2021 commercial energy code: connected lighting power
- Washington 2021 commercial energy code: calculation methods and project boundaries
- Washington 2021 commercial energy code: building-area LPD allowances
- ASHRAE: Standard 90.1, current 2025 edition and lighting changes
- ASHRAE Standards Actions, March 20, 2026: 90.1-2025 edition identification