A COI, or certificate of insurance, reports selected policy details without creating coverage or changing the insurer's obligations. Use it to locate the named insured, policy dates and limit categories, then match requested rights to the policy or endorsement. ACORD 25 also warns that paid claims can reduce the limits shown. A large aggregate figure and a certificate-holder listing therefore answer different questions from available occurrence coverage and additional-insured status.
Certificate of insurance summarizing the sub's coverage, limits, and expiration; coverage runs through the policy and endorsement, not the certificate
Compare occurrence and aggregate limits field by field
ACORD 25 (2016/03), published by New York DFS, separates each-occurrence, general-aggregate and products/completed-operations limits. For a contract requiring 2 million per occurrence and 2 million general aggregate, a submission showing 1 million per occurrence and 2 million general aggregate has a 1 million occurrence shortfall. The matching aggregate does not resolve it.
ACORD 25 states that the displayed limits can have been reduced by paid claims. A certificate showing a 2 million aggregate is therefore not a current claims ledger. Keep the remaining-limit confirmation separate from the document that establishes the policy's original limit.
| Comparison field | Required (USD) | Submitted (USD) | Finding |
|---|---|---|---|
| Each occurrence | 2 million | 1 million | 1 million shortfall |
| General aggregate | 2 million | 2 million | Nominal limit matches; available balance is a separate question |
Trace additional-insured status to its policy wording
The ACORD 25 (2016/03) form published by New York DFS states that additional-insured status requires applicable policy provisions or an endorsement. Being entered in the certificate-holder box identifies the certificate's recipient; it does not supply that policy status. Retain the applicable endorsement or policy provision with the contract requirement it satisfies.
Compare the contractor's contracting entity with the named insured, then read which parties and operations the additional-insured provision includes. For a requested waiver of subrogation, identify its own policy support. ACORD 25 addresses that waiver separately from additional-insured status; an operations-box note is a pointer to the supporting language, not the language itself.
Find cancellation notice in the policy provisions
ACORD 25 (2016/03) directs cancellation notices through the policy provisions. New York DFS's OGC Opinion 08-05-13 was issued May 30, 2008, and explains why a producer's certificate cannot add insurer obligations. A contract calling for 30 days' notice therefore needs policy support for that notice right, rather than an unsupported promise typed into the certificate.
For renewal review, preserve the certificate issue date, policy period and supporting endorsement revision together. Compare the work period with the policy dates, and keep the issuing producer's response attached to each unresolved requirement. Carry the coverage comparison into the subcontractor pre-work review with the document that supports each accepted requirement.
Distinctions
- Insurance policy
- The contract of insurance, including its conditions, exclusions and endorsements. The certificate summarizes selected information from it.
- Surety bond
- A separate undertaking addressing a bonded obligation. It is not established by the liability limits on a COI.
Frequently asked questions
Does a COI guarantee 30 days cancellation notice?
The ACORD form points to the policy provisions. Obtain the applicable provision or endorsement when a contract requires a particular notice right.
Can a $2 million aggregate satisfy a $2 million per-occurrence requirement?
Compare the each-occurrence field with the required each-occurrence limit. A $2 million aggregate describes a different constraint and does not establish that amount for one occurrence.
Sources checked
Also defined as
- Electrical: Certificate of insurance, the one-page proof of coverage that reports, but does not change, your policy