EMR, short for experience modification rate, is the insurance factor applied to the experience-rated share of workers compensation premium. Its worksheet combines payroll classifications with insured losses from earlier policy periods. That time lag makes the rating effective date essential: a contractor can improve its current injury record while a reserved claim from an older year keeps the next modifier elevated.

Experience modification rate, a multiplier on workers comp premium from a three-year claims history; 1.0 is average, below 1.0 is better than average

Used across 4 Anvilfield field guides, most in Electrical.
Updated

What a 0.85 modifier does to premium

NCCI classifies modifiers below 1.00 as credit, above 1.00 as debit, and exactly 1.00 as unity. With a 0.85 modifier, multiply the premium subject to experience rating by 0.85: that portion falls by 15 percent. The percentage does not describe a reduction in claim frequency or in the entire policy invoice.

Which years are actually in an EMR?

The North Carolina Rate Bureau normally uses 36 months of policy experience, with the newest included policy having expired one year before the rating effective date. For an annual policy renewing January 1, 2026, the usual experience window is January 1, 2022, through January 1, 2025. The 2025 policy year has not yet matured into that calculation.

NCCI's published plan review uses claims from July 2017 through July 2020 to rate a policy beginning July 2021. For a prequalification submission, identify the rating date and included policy periods alongside the number. A buyer comparing two contractors needs matching periods, not one expired mod beside one current mod. Keep that worksheet with the prequalification package.

Paid claims and open reserves enter together

NCRB requires claim values on an incurred basis, meaning payments plus outstanding reserves. A claim with 8,000 dollars paid and a 12,000-dollar reserve enters the loss record at 20,000 dollars before rating adjustments. Reconciling only the checks already written misses most of that claim's recorded cost.

Medical-only treatment also changes the calculation. The North Carolina Rate Bureau reduces medical-only losses by 70 percent for experience rating. A medical-only claim of 10,000 dollars therefore contributes 3,000 dollars before other applicable adjustments. A medical-and-indemnity claim follows a different treatment. Record the claim category as well as its total when reconciling a worksheet.

Why dividing losses by payroll does not reproduce the mod

NCRB calculates expected losses by multiplying payroll in each classification by its expected loss rate and dividing by 100. Actual losses are then split into primary and excess portions and enter a weighted formula. The mod is therefore more than actual claim dollars divided by expected claim dollars.

A payroll classification error changes expected losses even when no claim changes. Reconcile the worksheet in two passes: first class codes and audited payroll, then claim ownership, accident dates, payments, and reserves. Carry the bureau-issued result into the insurance record. Changing a spreadsheet total does not revise the issued modifier.

Distinctions

TRIR
TRIR counts OSHA-recordable cases against hours worked. EMR uses insurance loss and exposure data, with a different time window and weighting.
Premium invoice
The modifier affects the experience-rated portion of premium. An invoice also contains rating and policy items outside the mod calculation.

Frequently asked questions

Does an employer without an EMR automatically have a 1.00 mod?

No. Experience rating has eligibility thresholds. An employer below the applicable threshold has no calculated modifier; describe that status rather than inventing an average score.

Can an open claim affect my next EMR?

Yes. Its outstanding reserve is part of incurred loss. The relevant valuation and policy periods determine which rating calculation receives it.

Sources checked

Also defined as

  • Datacenter: Experience modification rate, the workers' comp factor that scores a sub's injury history against its peers, 1.0 being average
  • Roofing: Experience modification rate, a multiplier that scales workers comp premium against claims history