Near-miss
A near-miss records an unplanned event with a credible path to injury and an uninjured outcome. Someone need not already be standing at the impact point: a small change in timing or position can establish the exposure that narrowly failed to occur. Record the event, the normal work route, and the failed control. Keep a static hazard observation and any actual injury outcome in separate reporting fields.
An event that could have caused injury but did not; a free lesson that feeds back into the JHA and the talk
Reconstruct the event and the exposure that nearly occurred
A loose object stored above a walkway is a hazard observation. An object that falls onto that route between two workers passing is an event, even when neither worker is in the impact zone at that instant. Record the release point, travel path, access pattern, and the control that should have retained it.
OSHA's incident-investigation guidance includes close calls in which a worker could have been hurt after a slight change in circumstances. That definition allows the timing evidence to matter; an investigator should not discard the report solely because the impact point was empty when the object landed.
Prioritize the credible exposure. A dropped object over a closed, enforced exclusion zone presents different evidence from one falling onto an active route during a short gap in traffic. Preserve the access controls and actual worker movements with the report rather than assigning every falling-object event the same potential consequence.
Washington L&I advises documenting the scene with notes, photographs, video, or sketches, together with witness information and relevant operating records. A camera sequence showing the last person to pass and the next arrival can resolve the timing question. Use the incident-investigation guide to carry that evidence into the causal finding.
Keep injury recordkeeping as a separate decision
OSHA 29 CFR 1904.7 includes medical treatment beyond first aid, days away, restricted work or transfer, loss of consciousness, and death among its general criteria for recording work-related injuries and illnesses. Calling an event a near-miss does not resolve whether a worker actually sustained a recordable injury or illness.
OSHA 1904.7 also requires recording certain significant diagnosed injuries or illnesses even without those other outcomes. An internal label should be updated when later information changes the known consequences. Preserve the original event timeline while correcting the outcome and recordkeeping fields.
Distinctions
- First-aid case
- A first-aid case involves an actual injury or illness, even when it does not meet OSHA recording criteria. A near-miss without injury has a different outcome.
- Hazard observation
- A hazard observation describes a condition. A near-miss report adds an event sequence and credible injury mechanism, including the timing or separation that prevented contact.
Frequently asked questions
Can a report stay a near-miss after a fracture is diagnosed?
A fracture establishes an actual injury outcome. OSHA 1904.7(b)(7) treats a diagnosed, work-related fractured or cracked bone as recordable even without time off or treatment beyond first aid. Update the outcome and recordkeeping decision while retaining the original event timeline.
What makes a short near-miss report useful?
State what happened, who was exposed, what prevented harm, and which control failed or was missing. Include time and location so the investigation can recover supporting evidence.