Field glossary · safety
Stop-work authority
Stop-work authority lets a worker invoke the site's pause process when a control fails or the work no longer matches the plan. The useful record names the affected task, the condition that stopped it and the person authorized to release it after correction. Keep that site permission distinct from federal protected refusal: the OSHA regulation applies a specific imminent-danger test, rather than automatically protecting every refusal over a reported hazard.
The right and duty of anyone on the crew to halt a task that has become unsafe, without fear of reprisal
Record the work boundary before authorizing restart
For a lift interrupted by a pedestrian crossing, identify the lift and crossing on the stop record, then document the revised access control and the person who verified it. 'Supervisor notified' names a communication event; it leaves the physical correction and release boundary unresolved. Carry the revised access arrangement into the crew briefing.
OSHA defines a competent person in 29 CFR 1926.32(f) through two conditions together: capability to recognize the relevant existing and predictable hazards, and authority to take prompt corrective measures. A worker's permission to call a stop does not establish that competence or corrective authority for every task. Assign the restart role in the field-leadership plan.
A release should describe the work made ready by the correction. Clearing the pedestrian crossing for one lift leaves any separate stopped task with its own unresolved condition and release decision. Record the revised control and the boundary of the released activity together so a general 'resume work' message does not outrun the correction.
A site pause and a protected work refusal have different tests
Under 29 CFR 1977.12(b)(2), protected refusal requires a good-faith response to a danger of death or serious injury that a reasonable person would recognize, with no reasonable alternative and insufficient time to use ordinary enforcement channels. The regulation also requires the employee, where possible, to have sought correction from the employer without obtaining it. A general statement that any perceived hazard automatically satisfies federal refusal protection omits those conditions.
Employer programs can authorize a pause earlier, including an unexplained change in a lift route or a missing barrier. That delegated permission is part of managing the site, whereas the regulation addresses legal protection for refusing dangerous assigned work. Put the site's reporting and release roles in the written program so those decisions do not depend on a worker applying the legal test in the field.
29 CFR 1977.15(d) sets a 30-day period after an alleged section 11(c) discriminatory act for filing the federal complaint, with specified tolling principles. A grievance or filing with another agency does not itself extend that period. Record the date of the adverse action separately from the earlier hazard report and any internal investigation.
Frequently asked questions
Is a special form required for the federal retaliation complaint?
29 CFR 1977.15(b) requires no particular complaint form. Preserve the dates, reported hazard and adverse action so the complaint can identify what happened within the filing period.
Sources checked
- OSHA: 29 CFR Part 1977, employee rights and section 11(c) complaint procedures, 2025 edition
- OSHA: 29 CFR 1926.32(f), construction competent-person definition, 2025 edition
- OSHA: current 29 CFR 1977.12, conditions for protected refusal of dangerous work
- OSHA: current 29 CFR 1977.15, filing and tolling of discrimination complaints
Also defined as
- Roofing: Every worker's explicit right to stop unsafe work with no blame for the call