Look-ahead

The three to six week window pulled from the CPM that the field builds from, with constraints cleared and crews assigned

Used across 4 Anvilfield field guides, most in Concrete.

Also defined as

  • Electrical: A short rolling schedule, often two to three weeks, listing upcoming work and what must be made ready before each task can begin
  • Datacenter: Rolling 3 to 6 week short-interval schedule pulled from the master into the field