ANVILFIELD Try FieldOS

Field glossary · material

Infill

Order synthetic-turf infill by the carpet-and-granule combination, then reconcile installed weight with depth readings. Motz recommends 2.5 to 3.5 pounds per square foot and 1/2 to 3/4 inch depth for specified Envirofill grades in 1 1/2 to 1 3/4 inch landscape turf. A correct bag count establishes average loading; measurements from the backing reveal whether brushing left thin areas or concentrated pockets.

Granular sand or coated sand brushed into the fibers to add ballast, stand the blades up, and protect the backing

Used across 3 Anvilfield field guides, most in Landscaping.
Updated

Match the infill depth to the turf system

Motz's Envirofill landscape installation guide recommends ½ to ¾ inch of infill and 2.5 to 3.5 pounds per square foot for its listed 12/20 and 16/30 products in turf with 1½ to 1¾ inch pile. Those paired dimensions and rates belong to that product combination, not every synthetic lawn.

Record the turf designation, pile height, infill grade, target depth, and loading rate on the same material schedule. A purchase order that says only silica sand leaves the installation target unresolved. The synthetic turf guide covers placement; the product pairing establishes what the finished measurements should mean.

Reconcile delivered mass with measured depth

At a selected rate of 3 pounds per square foot, a 600-square-foot area requires 1,800 pounds of infill. Divide the net material placed by the installed area to reconcile the average loading. Subtract unopened material and material used elsewhere rather than counting every bag delivered as installed.

Motz directs Envirofill placement in ¼-inch lifts, with brushing between lifts and depth checks during installation. Incremental placement exposes areas where material hangs in the fibers instead of reaching the backing. A correct total bag count can still leave thin spots and deep pockets.

Take depth readings at identified locations, keeping the gauge referenced to the backing rather than the fiber tips. A map of the readings preserves the distribution that the average pounds-per-square-foot calculation cannot show. Use those same locations during later maintenance to distinguish migration from an installation shortfall.

600-square-foot installationRecorded quantityMeaning
Target at 3 pounds per square foot1,800 poundsTotal planned infill
Thirty-six 50-pound bags placed1,800 pounds3 pounds per square foot on average
Depth measured from backingReadings by marked locationDistribution within the carpet

Wear areas need their own maintenance readings

FieldTurf's 2017 maintenance guidelines recommend measuring and correcting infill at covered home-plate and first-base areas after every game and practice. That baseball-specific interval addresses concentrated displacement; a field-wide average cannot describe the material remaining at a repeated pivot point.

Log the area replenished and the mass added. Repeated additions at one location point to a recurring displacement pattern and create a record for adjusting grooming or wear-area maintenance. Replacement material must retain the approved system pairing, including particle size and material type.

Distinctions

Turf face weight
Face weight describes the manufactured turf fibers per area. Added infill is a separate installed material quantity.
Guardrail infill
In a railing, infill means the elements occupying the opening between structural members. That use is unrelated to loose turf granules.

Frequently asked questions

Can infill replace a natural-turf rootzone?

No. Rootzone is the growing medium occupied by living roots. Synthetic-turf infill works within the manufactured carpet and does not perform that plant-growing function.

Does a load of infill certify a sports field's impact performance?

A loading record accounts for granules. It does not measure impact attenuation; keep the completed system performance report separate from material delivery and depth records.

Sources checked

Also defined as

  • Concrete: The pickets, glass, cable, or mesh filling the guard, which must resist 50 lbf on a 1 sq ft area
  • Granular material brushed into synthetic turf that sets the fibers, holds the carpet, and cushions

Where this shows up

Next step: Find school field bids

Back to the full field glossary