ANVILFIELD Try FieldOS

Field glossary · property

Perched water table

Confirm a perched water table by finding a saturated layer and unsaturated material beneath it during the same monitoring period. Water entering an auger hole after rain is insufficient evidence: NC State Extension warns that filled macropores can drain into a hole while the surrounding clay remains unsaturated. Log the entry depths, rainfall, and isolated instrument intervals before assigning a drainage problem to regional groundwater.

Water trapped above an abrupt texture change, the bathtub effect under thin topsoil on compacted clay

Used across 2 Anvilfield field guides, most in Landscaping.
Updated

A wet hole does not identify the whole water profile

NC State Extension defines a saturated horizon for its aquic-condition assessment as having zero or positive soil-water pressure. It also warns that water entering an auger hole through rain-filled macropores can misrepresent the saturation of the surrounding clay matrix. Record rainfall timing and the depths from which water enters, rather than treating the final water level as a complete profile.

NC State Extension describes episaturation as periodic saturation above an unsaturated horizon within 2 meters of the surface. This soil-classification distinction depends on the vertical sequence. It separates an upper saturated layer from a profile saturated continuously downward through that depth.

A log showing saturation from 12 to 20 inches and unsaturated soil at 30 inches records that separation. A log stating only water at 12 inches does not. Keep the observations tied to the same monitoring period: comparing a wet-season upper reading with a dry-season lower reading cannot establish simultaneous perching.

Where open-hole observations are unreliable, NC State Extension recommends sealed piezometers or tensiometers. NC State calls for a clay seal, such as bentonite, to stop surface water bypassing the soil beside the instrument. Record the monitored depth interval as well as the water reading so another observer can identify which layer the instrument represents.

Why gravel under finer soil can hold water above it

Washington State University Extension's container research summary reports more retained moisture above gravel than above sand. The result separates coarse-layer permeability from drainage across a textural interface: large voids below the growing medium do not, on their own, establish rapid downward flow from it. A fine-over-coarse contact must be described as part of the profile, not simply labeled drainage stone.

Distinguish that interface effect from water accumulating over slowly permeable clay or compacted soil. Both can produce wet roots above a boundary, but the material properties and possible corrections differ. Preserve a layer-by-layer description when following the soil preparation guide or reviewing an engineered rootzone.

Soil color helps locate layers worth monitoring, but it cannot date the current water condition. NC State Extension notes that redox features can remain from earlier moisture regimes. Pair the morphology with contemporary water observations instead of assigning a present water-table elevation from mottling alone.

Distinctions

Surface ponding
Standing water above the ground surface does not identify whether a separate saturated body exists within the soil.

Frequently asked questions

Does perched water mean the regional water table is high?

No. The defining separation is unsaturated material beneath the perched body. Regional groundwater depth needs its own observation.

Will a gravel layer always drain a planting bed?

An outlet drains water that reaches the gravel. It does not remove the capillary-entry condition at a fine-over-coarse contact. Record both the outlet elevation and the material boundary when diagnosing water retained above the gravel.

Sources checked

Also defined as

  • The reservoir of moisture the layered profile holds just above the gravel for the roots

Where this shows up

Next step: Track public drainage work

Back to the full field glossary