ANVILFIELD Try FieldOS

Field glossary · material

Rootzone

Judge a turf rootzone by both its installed depth and its laboratory air-and-water balance. For a USGA putting-green mixture, the 2018 recommendations pair 35% to 55% total porosity with at least 6 inches per hour saturated conductivity. These are properties of the tested growing medium, not sand-blending percentages or proof of root growth. Native-soil lawns and manufactured sand profiles need different acceptance criteria.

The engineered soil or sand layer the turf roots into, built to drain and resist compaction

Used across 2 Anvilfield field guides, most in Landscaping.
Updated

Read porosity as a division of pore space

The USGA's 2018 putting-green construction recommendations specify total porosity of 35% to 55% and air-filled porosity of 15% to 30% for the rootzone mixture. Those percentages describe volumes within the tested sample, not the percentages of sand and amendment used to manufacture the blend.

USGA recommends capillary porosity of 15% to 25% and saturated hydraulic conductivity of at least 6 inches per hour for that putting-green mixture. Water retention and conductivity belong in the same acceptance review. A high conductivity result alone does not describe the water remaining in the pores after drainage.

A report showing 22% air-filled porosity and 20% capillary porosity gives 42% total porosity. Those three results sit within the cited USGA ranges. If conductivity is 8 inches per hour, that result also exceeds the cited minimum. Keep each result visible; reducing the report to drains well discards the air and water-storage information.

What ASTM F1815 measures

ASTM F1815-11(2026) covers hydraulic conductivity, water retention, porosity, and bulk density of sand-based rootzone mixtures, excluding fine- and medium-textured soils such as loams. Its scope fits manufactured sand-based turf profiles; an ordinary planting-soil report needs methods appropriate to that soil.

Under ASTM F1815, air-filled porosity is calculated as total porosity minus capillary porosity at the stated soil suction. The test condition matters: a water-filled pore can become air-filled as the sample drains. Compare reports at the specified condition rather than treating air space as a fixed material ingredient.

In a 12-inch-deep profile with a uniform 20% volumetric water content, the stored water corresponds to 2.4 inches of water over the same area. That volume calculation describes the stated moisture condition. Scheduling irrigation requires the change in water storage between the management thresholds, rather than treating the entire stored amount as the next irrigation dose.

Keep the approved blend connected to the installed layer

Identify the sand source, amendment, mixing proportions, and sampled production lot with the laboratory report. Source changes can change the combined pore system even when the nominal blend ratio stays the same. Acceptance concerns the mixture that will occupy the athletic-field profile.

Log the installed layer boundary and live-root depth in separate columns. A 12-inch material layer containing roots only 4 inches deep leaves 8 inches of installed medium below current rooting. Those observations prompt a profile and management review; they do not change the laboratory sample into an 8-inch or 4-inch construction layer.

Distinctions

Topdressing
Material placed onto established turf becomes part of the upper profile over time. Compatibility depends on its properties, not merely on sharing the word sand.
Infill
Synthetic-turf granules occupy spaces in a manufactured carpet. They are not a growing medium for living turf roots.

Frequently asked questions

Does a putting-green rootzone specification apply to every lawn?

It defines a particular sand-based construction system. Turf grown in native soil is characterized by that soil and its management requirements, not automatically by putting-green acceptance ranges.

Sources checked

Also defined as

  • The loosened, amended layer of topsoil the roots grow in, commonly 4 to 6 in deep

Where this shows up

Related guides

Next step: Find natural-turf projects

Back to the full field glossary