ANVILFIELD Try FieldOS

Field glossary · business

Single source of truth

A single source of truth identifies which record controls a particular fact and how changes become authoritative. It can span connected systems: the customer ID identifies the account, the approved issue controls construction, and the reel ledger controls remaining cable. The useful test is whether a conflicting update has a defined owner, approval path, and traceable resolution.

One record per customer that everyone works from, so no conflicting copies exist in phones and spreadsheets

Used across 2 Anvilfield field guides, most in Roofing.
Updated

A master ID is different from a matching name

PostgreSQL's primary-key documentation requires a primary key to be both unique and non-null, providing a concrete acceptance test for a master record identifier. A customer name, street address, or drawing title can change without creating a new underlying entity. Preserve the ID through those changes and keep separate identifiers for the customer, property, project, and document.

Two customer records with different IDs can still describe the same company. Uniqueness prevents an identifier collision; matching and merge rules prevent a duplicate entity. Before merging, decide which record survives and retain the retired ID as an alias. Otherwise old invoices and field photos lose their route back to the account described in the contractor CRM guide.

Which issue is authorized for this purpose?

The UK BIM Framework's Guidance Part C, Edition 1, distinguishes four information states: work in progress, shared, published, and archive. A newer file in work in progress does not automatically replace the published construction information. The authority belongs to the controlled issue and permitted use, rather than to the last file uploaded.

Guidance Part C explains that common-data-environment metadata includes revision, status, and classification codes. Revision identifies an issue; status communicates its permitted use. Keep both attached to downloaded sheets and exports. A coordination model and a construction issue can be simultaneously valid for different purposes without becoming competing instructions.

Prove that a handoff preserved the record

Reconcile identifiers as well as row totals. With 120 exported property IDs, the scheduling import must return those same 120 IDs as accepted records or named exceptions. If 118 import and two fail validation, retain the two rejected IDs for correction. A repeated ID and an omitted ID can leave a misleading total of 120 rows; a comparison of the actual ID sets exposes both.

At a later update, compare the identifier, controlling revision or effective date, changed fields, and update owner. A spreadsheet snapshot needs its extraction date and origin ID. These details extend document control to integrations and offline copies: reconciliation must show what changed, rather than merely show that a file arrived.

Distinctions

Backup
A backup preserves a recoverable copy at a point in time. It does not decide which live record controls a disputed field.
Common data environment
The CDE combines an information workflow with supporting technology; one authoritative workflow can use several connected software products.

Frequently asked questions

Can the customer master and drawing register live in different applications?

The UK BIM Framework explicitly describes multiple technical solutions supporting different information workflows. Define authority and transfer rules for each record type.

How do offline edits avoid creating a second master?

Carry the origin ID and starting revision with the downloaded record. Return edits against that version and resolve conflicting changes before publishing the next authoritative issue.

Sources checked

Also defined as

  • Electrical: One current, controlled set everyone works from, instead of scattered copies and emailed sketches

Where this shows up

Related guides

Next step: Get roofing account records

Back to the full field glossary