ANVILFIELD Try FieldOS

Field glossary · measurement

Trade size

Trade size 1 can identify EMT with a published outside diameter of 1.163 inches and bore of 1.049 inches, as Wheatland's elbow submittal shows. Trade size is the ordering designation; physical dimensions come from the particular raceway family. Its companion metric designator, 27 in this case, is another label. Record the family, size and connection method together so a nominal-size match does not substitute for fitting compatibility.

The nominal size of conduit or a fitting, called metric designator in the code, not the literal inside diameter

Used across 2 Anvilfield field guides, most in Electrical.
Updated

Trade size 1, metric designator 27, does not measure 1 inch

Wheatland's EMT steel-elbow submittal lists trade size 1, metric designator 27, with a 1.163-inch outside diameter and a 1.049-inch inside diameter. Neither dimension is the nominal inch size. Converting the outside diameter gives 1.163 x 25.4 = 29.54 mm, which also differs from the metric designator 27.

Wheatland assigns trade size 3/4 the metric designator 21, an outside diameter of 0.922 inch and an inside diameter of 0.824 inch. In a receiving log, record the measured outside diameter beside the marked size rather than replacing the product's designation with the caliper result. A 21 mm bore would describe a different physical quantity.

Using the nominal size as the bore changes the area

For the published 1.049-inch inside diameter, circular area is pi x 1.049² / 4, approximately 0.864 square inch. Substituting a 1.000-inch bore gives about 0.785 square inch. The published bore has about 10 percent more area than that nominal-diameter shortcut predicts.

Allowable conduit fill uses the raceway's applicable table values and conductor areas, as developed in the conduit-fill guide. Keep nominal size, total cross-sectional area and permitted fill in separate fields so the ordering label stays distinct from each calculated quantity.

A shared size label still needs the correct fitting family

Wheatland's rigid-steel fittings submittal identifies its rigid couplings as suitable for joining rigid metal conduit or intermediate metal conduit. It also identifies NPT tapered threads on its rigid elbows and nipples. That documented RMC/IMC compatibility does not extend a threaded rigid fitting to EMT merely because the trade-size labels match.

An order line should therefore identify the raceway type as well as size and connection method. 'Trade size 1 connector' leaves open whether the crew needs a fitting for EMT, a threaded rigid assembly or another system. The conduit-bodies and fittings guide addresses those installation choices.

At receiving, compare the manufacturer's catalog designation and dimensional sheet with the material schedule. Use a measured diameter to investigate a mismatch, while retaining the labeled trade size for ordering and code-table references. That avoids relabeling a correctly supplied part because its caliper reading differs from the nominal size.

Frequently asked questions

Should I enter the metric designator in a diameter calculation?

Use the published diameter with its units. For the cited trade-size 1 EMT, 1.163 inches converts to 29.54 mm outside diameter; entering 27 mm would use the designation in place of a dimension.

Sources checked

Also defined as

  • Nominal raceway designation that the 8x and 6x multipliers are applied to

Where this shows up

Related guides

Next step: Build an industrial customer list

Back to the full field glossary