Conduit body
A conduit body is an accessible fitting that provides space to pull, redirect, or access conductors in a raceway system. Its hub trade size does not establish every conductor arrangement it accepts. Identify the body’s exact model, internal volume, conductor markings, and matching cover before using it as a pull point or a splice location.
An access fitting in a conduit run with a removable cover for direction change, pulling, or access; also called a condulet or outlet body
The hub size does not tell the whole capacity
Eaton’s Form 5 brochure lists the 2-inch LB200M conduit body with an internal volume of 73 cubic inches. Eaton lists a maximum of three 4/0 AWG XHHW conductors for its LB200M conduit body. The two figures describe different constraints: volume alone does not establish the permitted bend and pull geometry.
Eaton’s same brochure lists the 1½-inch LB150M at 35.3 cubic inches with a maximum arrangement of three 1/0 AWG XHHW conductors. Increasing the hub one trade size does not produce a simple proportional increase in either body volume or acceptable conductor size.
On a takeoff using three 4/0 XHHW conductors, the published LB200M arrangement supplies the matching manufacturer evidence; the smaller LB150M’s three-1/0 arrangement does not. Put the body model beside the conductor schedule before the fitting is ordered. A 2-inch hub description alone drops the information that justifies the selected pull point.
Use the body model and the conductor construction together
Eaton’s separate industrial-fittings wire-fill chart organizes limits by catalog number, hub, conductor size, and conductor count. A conduit-fill result for the straight raceway therefore cannot be transferred automatically to the body at its end.
Keep insulation type and actual construction with the pull schedule. Larger conductor outside diameter and different bending behavior can matter even when the metal area is unchanged. The conduit-body installation guide covers the fitting arrangements; the catalog record establishes which particular body was selected.
Do not convert a published three-conductor arrangement into permission for a mixed bundle by adding copper areas alone. That arithmetic ignores insulation and the shape of the conductors as they pass the opening. Use the marking or manufacturer’s documented allowance for the actual arrangement.
A cover change is an assembly change
The cover, gasket, screws, and body form the enclosure at the access opening. Record compatible parts with the body model when replacing a damaged cover. A cover that spans the opening can still leave the wrong gasket seat or screw engagement for the intended assembly.
After a routing change, retain access to the cover and confirm that the pull point remains usable. A body boxed behind a new finish loses the access function that justified placing it there. Capture the final location in the installed record before the surrounding work conceals the route.
Distinctions
- Junction box
- A junction box has its own volume and dimensional rules for the installed conductors. A similarly sized conduit body is not interchangeable simply because its cavity looks large enough.
Frequently asked questions
Can a conduit body contain splices?
A body used for splices must have the required volume marking and satisfy the applicable fill and installation requirements. A removable cover alone is not permission to splice in an unmarked body.
Sources checked
Also defined as
- A fitting like an LB or T in a raceway run, which needs a marked volume to hold a splice
- A fitting providing access at a bend or junction, with its own related sizing provisions