ANVILFIELD Try FieldOS

Field glossary · component

Weir

A weir is the crest water must overtop, but a field record must identify which crest and which water level are being compared. In a P-trap it is the internal outlet crest used for seal and vent-elevation checks. For a standard sharp-crested measuring weir, Reclamation places the head reading at least four maximum heads upstream. Measuring beside the falling water sheet substitutes local drawdown for the required upstream head.

The downstream lip of the trap where water spills over toward the drain

Used across 2 Anvilfield field guides, most in Plumbing.
Updated

Locate the crest before comparing elevations

Use the internal outlet crest as the datum when applying 2027 UPC Section 1002.4, which keeps the vent opening at or above the trap weir except for water closets and similar fixtures. A drawing dimension to the outside of the outlet pipe must first be related to that internal elevation. The fixture flood rim and bottom of the bend are different datums.

If a trap weir is at project elevation 100.00 ft and its vent opening is at 99.95 ft, the opening is 0.05 ft, or 0.6 inch, too low unless the exception applies. Mark both elevations on the DWV layout. Moving the fixture rim without changing those two points leaves the same 0.6 inch discrepancy.

A level crest is an installation check

New York's 2025 Section 1002.7 requires a trap to be level with respect to its seal; rotating the bend to reach a misaligned stub changes the crest's installed geometry. Check orientation before transferring a catalog elevation to the trap setting record. A dimension from the upright product drawing no longer describes a tilted installation.

Reclamation requires rectangular and trapezoidal measuring-weir crests to be level and a V-notch's angle bisector to be plumb. A low corner starts spilling before the rest of an uneven crest. Surveying only the highest point therefore misses the edge controlling the first overflow. Record the crest profile along with its elevation.

For a measuring weir, head is measured upstream

The Bureau of Reclamation's Water Measurement Manual places the head-measurement station for a standard sharp-crested weir at least four times the maximum head upstream of the crest. The water surface close to the lip draws down as flow accelerates, so a ruler placed at the falling sheet does not read the required upstream head.

With a maximum head of 0.5 ft, that minimum station distance is 2 ft upstream. Tie the gauge zero to crest elevation. A gauge reading of 0.6 ft referenced to a zero 0.1 ft below the crest represents 0.5 ft of head above the crest. Preserve the gauge-zero reference with the reading.

Recognize when a standard overflow rating no longer fits

For a standard sharp-crested measuring weir, Reclamation specifies downstream water at least 0.2 ft below the crest and recommends head greater than 0.2 ft to prevent the sheet from clinging. Both are about 2.4 inches, but they are measured on opposite sides of the structure. Reclamation calls for added precision and continual clinging checks when measurements must approach the low-head value.

At 0.5 ft upstream head, tailwater only 0.1 ft below the crest fails the cited downstream-clearance condition despite the adequate upstream depth. Record both stages and whether air remains beneath the overflow sheet before using a standard rating. A detention outlet or roof scupper requires its own geometry and outlet design rating.

Distinctions

Orifice
A submerged opening passes flow under a head difference through the opening. A free-overflow weir passes water over its crest; upstream and downstream levels determine which flow condition exists.

Frequently asked questions

Is the trap weir the bottom of the trap?

It is the outlet crest that establishes the resting water level. Seal depth uses that crest and the internal dip reference.

Can I measure a weir's head at the spill edge?

For the cited standard sharp-crested measurement, Reclamation uses an upstream station outside the drawdown near the edge.

Sources checked

Where this shows up

Related guides

Next step: Find stormwater service sites

Back to the full field glossary