ANVILFIELD Try FieldOS

Field glossary · business

Working capital

Net working capital is the balance-sheet difference between current assets and current liabilities: $750,000 less $500,000 leaves $250,000 at the reporting date. Collecting an already recorded $125,000 current receivable replaces that receivable with cash and leaves the $250,000 unchanged. A current credit-line draw likewise adds equal amounts to current assets and liabilities. Use a cash forecast to determine payment capacity; the working-capital balance alone does not time payroll or supplier obligations.

Current assets minus current liabilities, the short-term cash strength a reviewer and a surety read most closely

Used across 2 Anvilfield field guides, most in Electrical.
Updated

More cash does not always mean more working capital

The Business Development Bank of Canada working-capital reference defines net working capital as current assets minus current liabilities. Applying that formula, collecting a $125,000 current receivable at its carrying amount increases cash and reduces receivables by $125,000, leaving total current assets and working capital unchanged. The improvement is the availability of cash for payment.

BDC's current-ratio guidance includes bank operating credit and the portion of long-term debt due within one year among current liabilities. A $200,000 current credit-line draw adds $200,000 to cash and $200,000 to current debt, so it also leaves working capital unchanged before fees or other transactions. It still supplies cash for the timing gap described in the construction cash-flow guide.

Four transactions, one starting balance sheet

Start with $750,000 of current assets and $500,000 of current liabilities: working capital is $250,000 and the current ratio is 1.50. Each row below is an independent transaction from that starting point, with no other entries or transaction costs.

Paying a current supplier bill improves this starting current ratio even though working capital stays fixed. Buying equipment for cash moves value out of current assets into a fixed asset, reducing working capital despite the business acquiring useful equipment.

TransactionCurrent assetsCurrent liabilitiesWorking capitalCurrent ratio
Collect $125,000 of current receivables$750,000$500,000$250,0001.50
Pay $100,000 of accounts payable$650,000$400,000$250,0001.625
Draw $200,000 of current credit$950,000$700,000$250,0001.357
Buy $120,000 of fixed equipment for cash$630,000$500,000$130,0001.26

A maturity change can reduce the balance without spending cash

When $100,000 of debt moves from long-term classification into the current portion, current liabilities rise by $100,000 and working capital falls by the same amount, with no cash paid on the reclassification date. Reconcile the debt schedule before attributing that decline to job losses or poor collections.

BDC defines the quick ratio using current assets less inventory and prepaid expenses, divided by current liabilities. Those exclusions explain why a contractor with ample working capital can still have little immediately usable cash. Keep subcontractor prequalification figures tied to the same reporting date, then use the cash forecast to place receipts and payments in their actual weeks.

Put the expected receipt dates for progress billings and retainage beside scheduled payroll and supplier payments. A $250,000 working-capital balance does not state how much cash will clear the bank on Friday. Collection timing is the bridge between the balance sheet and the next job's funding need.

Distinctions

Current ratio
Paying the example's $100,000 supplier bill raises the current ratio from 1.50 to 1.625 while working capital stays at $250,000. A better ratio therefore need not represent additional working-capital dollars.
Undrawn credit availability
An unused borrowing commitment can fund a future cash gap, but it is not cash already included in current assets.

Frequently asked questions

Does retaining cash from an already recorded profit add working capital again?

No. Keeping the cash prevents an owner distribution from reducing current assets; it does not recognize the same profit a second time.

Does reclassifying debt into the current portion change total debt?

Total debt stays the same. Its timing classification changes, which changes working capital and the current ratio.

Sources checked

Also defined as

  • Plumbing: The cash and near-cash needed to fund the gap between spending on work and collecting for it

Where this shows up

Related guides

Next step: Compare bid returns

Back to the full field glossary