WPS / PQR
A WPS, welding procedure specification, carries production ranges on ASME's QW-482 form; a PQR, procedure qualification record, preserves the coupon's actual variables and test results on QW-483. Check each process's deposited thickness separately when reconciling the two. The qualification route matters: a WPS qualified by testing needs its supporting PQR trail, while an AWS D1.1 prequalified WPS uses the code's prequalification conditions without a procedure qualification test.
Welding procedure specification and the procedure qualification record that backs it, per ASME Section IX
Read the WPS as ranges and the PQR as a record
ASME's suggested QW-482 WPS form provides a supporting-PQR field, revision identification and production ranges for variables such as amperage, voltage and travel speed. Its QW-483 PQR form instead calls for the actual variables used to weld the test coupon. For qualification by testing, list each supporting PQR beside the WPS revision it supports so a reviewer can follow the production instruction back to its test record.
ASME lists BPVC Section IX-2025 in its current publisher collection. Put the project's governing edition on the qualification review sheet. The process-piping guide describes the qualification framework. The document review adds a traceable relationship among WPS number, revision, supporting PQR and laboratory report.
Track deposited thickness by welding process
ASME's QW-483 form calls for deposited weld-metal thickness to be recorded separately for each filler metal and process in a combination qualification. Base-metal coupon thickness and process-specific weld-metal thickness are different entries. A coupon's overall thickness does not tell the reviewer how much of the joint each process deposited.
A 0.375-inch coupon containing 0.100 inch deposited by GTAW and 0.275 inch by SMAW needs both deposit measurements in the record. Their sum is 0.375 inch, but neither process deposited the entire thickness. If a proposed WPS changes the GTAW deposit to 0.200 inch, the GTAW qualification range needs review even though the total joint thickness stays unchanged. The PQR values are the inputs to that code-range check, not production limits copied directly from the coupon.
Reconcile the laboratory result with the signed PQR
ASME's QW-483 tensile-test record includes specimen width, thickness, area, ultimate load, calculated ultimate stress and failure type and location. Those fields support an arithmetic check as well as a traceability check. An 18,000 lb ultimate load divided by a measured 0.250 sq in specimen area gives 72,000 psi ultimate tensile stress. That calculated result still needs a separate comparison with the applicable acceptance criterion; 72,000 psi is not a pass value for every material.
Match the specimen identifier and laboratory report number to the PQR, then apply the governing acceptance criteria to the actual result. The same form provides separate records for guided bends and toughness tests, including test temperature for the latter. A tensile result cannot stand in for a missing bend result or a required toughness result.
ASME's QW-482 form distinguishes minimum preheat from maximum interpass temperature. Preserve that direction when transferring the qualified conditions into production instructions. Copying a temperature without its minimum or maximum designation changes how the welder reads the limit.
What an empty supporting-PQR field means
AWS identifies D1.1/D1.1M:2025-AMD1 as its current structural-steel code, and its June 2025 Welding Digest explains the prequalified-WPS route that avoids procedure qualification testing. On a document review, mark the qualification route before treating an empty supporting-PQR field as a missing record. A prequalified procedure needs its basis in the code's permitted conditions; a procedure qualified by testing needs its test trail.
Attach that route decision to the joint drawing and WPS revision in the structural QA package. Record which material, process and joint-detail provisions support prequalification. A changed joint detail needs review against that basis even when the document keeps the same WPS number. ASME and AWS records in one binder still retain their separate governing codes.
Distinctions
- Laboratory test report
- The report supplies identified specimen results. The PQR also records the coupon's welding variables and the organization's certification; a laboratory result alone does not supply the missing welding history.
Frequently asked questions
Must the qualification package use ASME's exact form layout?
ASME labels QW-482 and QW-483 as suggested formats. An internal form still needs the information required by the governing qualification rules. Review its fields and traceability rather than accepting or rejecting it solely because its page layout differs.
Sources checked
- ASME, QW-482 suggested WPS form, currently linked from its data-report-forms index: ranges, supporting PQRs and temperature limits
- ASME, QW-483 PQR form in the 2025 publisher download: actual variables, combination-process thicknesses and test records
- ASME, 2025 Boiler and Pressure Vessel Code publisher edition page
- American Welding Society, current AWS D1.1/D1.1M:2025-AMD1 structural welding code
- AWS Welding Digest, June 2025: prequalified WPSs and the separate procedure-testing route
Also defined as
- Datacenter: Welding Procedure Specification and the Procedure Qualification Record that backs a non-prequalified WPS under AWS D1.1