Port cranes and terminal equipment in US ports (estimate)

Anvilfield estimates 600 shore cranes and 11,600 shore cranes plus core yard machines at US container ports, with public inputs, service benchmarks and fleet qualification steps.

Market IntelligencePort CranesTerminal EquipmentInstalled BaseEquipment Service

Direct answer

Anvilfield research estimates 600 ship-to-shore container cranes and 11,600 shore cranes plus core yard machines across US container ports in the 2023 and 2024 reference stock. The combined fleet ranges from 7,900 to 16,700 machines. Core yard equipment covers yard gantries, terminal tractors, straddle carriers and container handlers. Bulk-terminal machinery, general forklifts, shipboard gear and off-port fleets have separate inventories.

On this pageWhat does this port equipment estimate count?How many port cranes and core terminal machines are in the US?Which equipment creates the service workload?Benchmarks for a port equipment territoryHow do leading suppliers build a terminal equipment map?Who owns the equipment and buys the work?Worked example: a regional terminal-equipment service companyHow do electrification and refurbishment change demand?How should the fleet register stay current?Common mistakes in port equipment market sizingTerminal fleet qualification checklistMethodology
Need to run this in the field?

Open the related tool for the calculation, checklist, or packet.

Key takeaways

  • Anvilfield estimates 600 shore cranes and 11,600 shore cranes plus core yard machines at US container ports.
  • Anvilfield estimates 660 annual replacements across yard tractors, container handlers and yard gantries.
  • Count complete machines once and keep energy systems and replaceable components in linked records.
  • Connect each asset to its terminal, equipment owner, operator, purchasing authority and service scope.

What does this port equipment estimate count?

The counting unit is a complete cargo-handling machine. A ship-to-shore crane lifts containers between a vessel and the quay. Yard gantries stack or transfer containers inside the terminal. Terminal tractors move chassis through the yard. Straddle carriers lift and transport containers, while top handlers, empty handlers, side picks and reach stackers form the container-handler group used here. Each machine enters the fleet once.

Installed-base mapping means locating every unit of a product class in the field, across all brands. For a port equipment supplier, that requires a machine register connected to terminals, operators and owners. A port authority name is an account relationship. A terminal is an operating location. A crane is an asset. Keep those identities linked so a shared mailing address does not collapse separate fleets into a single record.

The national frame is container ports, including the Alaska, Hawaii and Puerto Rico entries in the Bureau of Transportation Statistics, or BTS, crane table. The model expands that frame for additional container-port cranes and derives specialized yard fleets from public port inventories. Rubber-tired gantry cranes, or RTGs, rail-mounted gantry cranes, or RMGs, and automatic stacking cranes share the yard-gantry grouping. Preserve the subtype in the working register because their service scopes differ.

General forklifts, loaders, sweepers, light towers, maintenance vehicles, terminal buildings, conveyors, harbor vessels and road-going drayage trucks sit outside the estimate. Those assets still create work. Size them in separate equipment registers, with boundaries matched to the product being sold. The EPA inventory guidance in source S5 supports separating equipment sectors and collecting machine-specific operating information.

Installed-base mapping for equipment manufacturersInstalled-base mapping for equipment manufacturers
Port crane inspection and maintenancePort crane inspection and maintenance

How many port cranes and core terminal machines are in the US?

Anvilfield estimates 600 ship-to-shore container cranes across US container ports, with a range of 570 to 630.

Anvilfield estimates 1,120 yard gantry cranes, ranging from 740 to 1,640. Anvilfield estimates 1,710 shore and yard gantry cranes combined, ranging from 1,310 to 2,260.

Anvilfield estimates 5,980 terminal yard tractors, ranging from 3,990 to 8,770, and 1,990 straddle carriers, ranging from 1,330 to 2,920.

Anvilfield estimates 1,910 container handlers, ranging from 1,270 to 2,800. The core yard fleet totals 11,000 machines centrally, ranging from 7,300 to 16,100.

Anvilfield estimates 11,600 shore cranes and core yard machines combined, with a range of 7,900 to 16,700. This is the fleet boundary used for national territory planning here.

Anvilfield estimates annual replacement exposure of 500 yard tractors, 120 container handlers and 50 yard gantries. Their respective ranges are 280 to 880, 70 to 200 and 30 to 80.

Anvilfield estimates 660 annual replacements across those classes, ranging from 380 to 1,160. Shore-crane and straddle-carrier replacements have separate planning scopes.

Crane subtotals overlap the combined fleet. Keep annual replacement flow separate from the installed machines available for inspection, parts support or service agreements. Methodology records the source years, fleet ratios, planning lives and rounding.

Anvilfield estimateLowCentralHighInputsAssumptions
Ship-to-shore container cranes570600630S1: sum of table 7570 x coverage factor 1.00/1.05/1.10
Yard gantry cranes7401,1201,640S2-S4: 330 / 177 shore cranesRTG, RMG and stacking cranes; density 0.70/1.00/1.40
Terminal yard tractors3,9905,9808,770S2-S4: 1,769 / 177Diesel, propane, LNG and electric; same density factors
Straddle carriers1,3301,9902,920S2-S4: 588 / 177Conventional and hybrid; same density factors
Container handlers1,2701,9102,800S2-S4: 564 / 177Top, side and empty handlers plus reach stackers; same density factors
Core yard equipment, subtotal7,30011,00016,100Sum of the four yard classesEach machine counted in one class
Shore cranes plus core yard equipment7,90011,60016,700Shore cranes + core yard subtotalSpecialized container equipment; support fleet excluded
Shore and yard gantry cranes, subtotal1,3101,7102,260Shore cranes + yard gantriesSubset of core total; do not add again
Annual yard-tractor replacement exposure280500880Modeled tractors / planning life; S6Low/central/high life: 14/12/10 years
Annual container-handler replacement exposure70120200Modeled handlers / planning life; S6Low/central/high life: 18/16/14 years
Annual yard-gantry replacement exposure305080Modeled yard gantries / planning life; S6Low/central/high life: 28/24/20 years
Annual replacement exposure, selected classes3806601,160Sum of the three replacement rowsStable stock, staggered retirement; excludes shore cranes and straddles

Reference-stock scenarios built from 2023 and 2024 public inputs. Values are independently rounded; subtotals use unrounded calculations. How to cite this estimate: Anvilfield, Port cranes and terminal equipment in US ports (estimate), 2026, https://anvilfield.com/field-guides/market-intelligence/port-cranes-and-terminal-equipment-in-us-ports-estimate/

Which equipment creates the service workload?

A machine count becomes useful when it connects to a service task. Shore cranes bring structures, hoists, ropes, spreaders, travel systems, drives and power supplies into the maintenance scope. Yard gantries add their own travel arrangement, energy system and controls. Tractor and handler fleets create repeat mechanical, electrical, tire, brake and hydraulic work according to the installed configuration. Separate the complete machine from replaceable assemblies and consumable parts.

For crane inspection, obtain the machine identity, current documentation, duty history, certification records and known restrictions. The port crane maintenance guide explains how routine inspections, manufacturer maintenance and certification fit together. A market count establishes the scale of the fleet; the equipment record establishes the applicable task and the party qualified to perform it. Do not turn a territory spreadsheet into an inspection release.

Coating work needs its own evidence. Record the member, access arrangement, coating condition, exposure and engineering review needed before preparation. Visible paint failure helps locate a review target. Steel measurements and the responsible engineer establish the structural scope. The protective coatings guide explains preparation and coating work, while the crane rigging guide covers the lift planning questions that affect access and handling.

Build separate opportunity records for recurring maintenance, component modernization, protective coatings and whole-machine replacement. A crane retained for another operating cycle still buys motors, drives, controls and structural work. A replacement project carries receiving, commissioning and supporting infrastructure tasks. Joining those opportunities to the same asset preserves the account history without multiplying the physical fleet.

Industrial protective coatings and blastingIndustrial protective coatings and blasting
Crane rigging and signalsCrane rigging and signals

Benchmarks for a port equipment territory

Anvilfield's pooled reference mix contains 18.4 core yard machines per shore crane, including 10.0 yard tractors. Use those ratios to check inventory completeness, then plan service from the terminal's actual handling system.

Carry about 1.9 yard gantries per shore crane when converting the reference fleet into crane service scope. Keep the 3.3 straddle carriers and 3.2 container handlers per shore crane in separate equipment classes because their layouts and maintenance needs differ.

Use 8.3% annual tractor turnover for the central stock-based replacement screen. Use 6.25% for container handlers and 4.17% for yard gantries. Apply these rates to equipment population, then qualify actual replacement timing with condition, duty, parts support and the approved capital program.

The ratios describe a pooled port mix. A straddle-led terminal, a tractor-and-RTG terminal and an automated stacking layout organize the same cargo movement differently. Use the benchmark to test an incomplete register and identify missing categories. Release a local equipment count after the terminal's layout and fleet records explain the difference.

Field benchmarkReferenceHow to use it
Core yard units per shore crane18.4Pooled calibration; replace with the terminal's actual operating layout
Yard tractors per shore crane10.0Anvilfield pooled calibration; use the terminal's actual handling mix
Yard gantries per shore crane1.9Counts RTG, RMG and stacking cranes as complete machines
Straddle carriers per shore crane3.3Use only where the handling system employs straddles
Container handlers per shore crane3.2Includes loaded, empty, side and reach-stacker equipment
Yard-tractor annual turnover8.3%Reciprocal of the 12-year central planning life
Container-handler annual turnover6.25%Reciprocal of the 16-year central planning life
Yard-gantry annual turnover4.17%Reciprocal of the 24-year central planning life

How do leading suppliers build a terminal equipment map?

Building-first prospecting means starting from the building and the assets visible at its site, then finding the decision maker. At a port, start with the terminal boundary, berth and yard layout, and connect the maintenance buildings and nearby logistics properties. This puts equipment fit ahead of a broad list of companies with a waterfront address.

Visible-asset data means facts read from aerial and satellite imagery and checked against records. A dated view establishes location, machine arrangement and visible equipment class. Terminal maps, public inventories and operator records improve classification. Keep the observation date and the record date separate. An image showing a gantry does not establish its serial number, remaining life or maintenance contract.

Targeted market intelligence means sizing and locating demand at the building or operating-site level, rather than the ZIP-code level. Build the terminal coverage record before distributing account assignments and service capacity across the territory.

Leading manufacturers, distributors and service companies measure visible fleets directly with tools such as PorchRocket's Asset Search, which finds assets across the lower 48 and returns reviewed findings with a dated view and the owner of record. Use that evidence to connect the physical fleet to a qualified service territory.

Fit-first lists are lists filtered to the buildings and sites that fit a company's work. For a crane contractor, useful filters include equipment class, territory, terminal type, access capability and supported manufacturer families. For a distributor, the screen also includes the installed drive, controller, spreader or power-system family after records verification. Keep unmatched machine details in a review queue instead of inferring a model from the shape of a crane.

For the warehouses and maintenance buildings around a terminal, PorchRocket's Ground Control supplies standard commercial building lists by footprint, building use and supported attributes such as roofs, rooftop HVAC, parking lots, tanks and docks, at $10 to $20 a building within 48 hours. Keep that adjacent-building research connected to the custom terminal-equipment register. A building-list delivery and a verified crane identification answer different purchasing questions.

Building-first prospecting: why the building comes before the contactBuilding-first prospecting: why the building comes before the contact
Visible-asset data: what aerial and satellite imagery can tell a sales teamVisible-asset data: what aerial and satellite imagery can tell a sales team
What is targeted market intelligence for building products and servicesWhat is targeted market intelligence for building products and services
Fit-first lists: how to define the buildings that fit your workFit-first lists: how to define the buildings that fit your work

Who owns the equipment and buys the work?

Separate land ownership, equipment ownership, terminal operation and purchasing authority. The recorded property owner supplies a starting point for account research. Lease documents, equipment registers, operator confirmation and the approved procurement route establish who controls the machine and who places the order. A landlord's name on a parcel record does not identify the incumbent service contractor or the equipment warranty holder.

Assign the service opportunity to the actual terminal and machine. Record the operator, maintenance lead, equipment owner, purchasing organization, agreement status and next review action. Where a port authority owns infrastructure and an operator manages equipment, preserve both relationships. Where a fleet is leased, connect the lessor and the operator without duplicating the machines in separate account totals.

Qualify access and work packaging early. A shop able to service industrial motors still needs the required terminal access, outage coordination, lifting arrangements and machine documentation for the proposed crane task. A dealer supporting tractors needs the correct powertrain and diagnostic capability. Put those facts beside territory distance so a nearby asset does not enter the offer simply because it lies inside a radius.

Keep public procurement evidence with the account. A published solicitation establishes a defined buying event; a capital plan identifies a planning route that needs further review. A fleet age or imagery observation identifies a research priority. Record the evidence supporting the next action and the person responsible for confirming it. This keeps the installed population, qualified accounts and live tenders separately measurable.

Owner of record vs operator vs decision maker: who actually buysOwner of record vs operator vs decision maker: who actually buys

Worked example: a regional terminal-equipment service company

In Anvilfield's planning case, a regional terminal-equipment service company covers 6 container terminals. Each terminal has 4 shore cranes, 32 yard tractors, 8 yard gantries and 10 container handlers. Its register therefore carries 24 shore cranes and 300 core yard machines. The service manager keeps the shore-crane inspection offer separate from the recurring yard-equipment agreement.

The yard agreement covers 75% of the registered yard fleet: 144 tractors, 36 gantries and 45 handlers, or 225 machines. Link every covered unit to an asset identity, scope and renewal date. An agreement counted once per terminal still needs equipment-level coverage to explain the labor commitment.

The annual scope allocates 8 direct service hours per covered tractor, 12 per covered handler and 24 per covered yard gantry. The calculation produces 2,556 direct service hours, or 1.8 technician equivalents at 1,400 productive hours each. Travel, terminal access, emergency response, test-provider attendance and major repairs receive separate allowances. Actual machine instructions and the contracted tasks control the work package.

Anvilfield budgets $400 to $800 to research 40 adjacent commercial buildings in this case. Carry custom equipment research as its own quoted scope. Assign each record to a terminal account, supporting facility or adjacent prospect before loading it into the customer system.

The commercial decision follows coverage and capacity. The manager first closes equipment identities and agreement boundaries, then compares the contracted hours with available labor and outage windows. An attractive national fleet total does not resolve those local operating constraints. The worked case supplies a repeatable account worksheet that connects machines, coverage and labor before pricing begins.

Planning itemResultBasis
Shore cranes24Separate crane scope
Registered core yard machines300Tractors, gantries and handlers
Covered core yard machines225Agreement coverage applied to each class
Annual direct service hours2,556Covered units x class-specific annual labor allowance
Technician equivalents1.8Direct hours / productive hours per technician
Adjacent building-list cost$400 to $800Building records only

How do electrification and refurbishment change demand?

Track the energy system and the operating task independently. A yard tractor remains a yard tractor when its propulsion changes, but its service parts, charging arrangement and technician requirements change. A hybrid RTG stays in the gantry fleet; count the complete machine once and record its engine, storage system and drives as linked components. This preserves a stable installed-base history through modernization.

Classify a project by what changes. A diesel-to-electric conversion changes an existing machine. A replacement removes a machine and commissions another. A capacity expansion adds equipment or changes the operating layout. Use distinct event records for those actions so a modernization announcement does not automatically become a net fleet addition. The public inventories in sources S2 through S4 show why energy type and machine type need separate fields.

For electrical work, capture the incoming supply, installed motors, drive family, control architecture, enclosure condition and isolation boundary through the appropriate records and site review. Variable-frequency drive selection, motor protection and insulation testing each need equipment-specific methods. The linked field guides explain those tasks. A visible electrical enclosure establishes location and appearance; drawings and equipment records establish the actual system.

Refurbishment creates additional demand within retained machines. Brake work, bearings, ropes, spreaders, cable systems, coating repairs and controls upgrades follow their own conditions and schedules. Keep those scopes attached to the asset rather than forcing every opportunity into whole-machine replacement. The stock-based replacement rows support planning for turnover, while documented condition and the owner's capital decision set the project route.

Variable-frequency drive installationVariable-frequency drive installation
Motor protection and overload relaysMotor protection and overload relays
Electrical insulation resistance testingElectrical insulation resistance testing

How should the fleet register stay current?

Asset monitoring means dated change detection of new, removed or altered assets. Preserve the previous observation alongside the current one and classify the change before updating the active fleet. A crane that moves to another berth changes location. A crane delivered but not commissioned changes the project register. A removed machine changes the installed population after its identity and disposition are resolved.

For repeat territory work, PorchRocket's Asset Search offers custom monitoring with the supported cadence confirmed in the written scope. Set that cadence around the commercial decision and the available dated views. A planned expansion, a maintenance territory refresh and a component campaign need different observation schedules. Record what changed, who reviewed it and which account action follows.

Keep operating information with the asset as well as imagery evidence. Current counters, maintenance records, abnormal events and condition findings explain workload that a view from above cannot resolve. Use the condition-monitoring guide for the role of equipment measurements and the thermography guide for interpreting an electrical inspection scope. Bearing history, lubrication and shaft-grounding records add further machine-level evidence where relevant.

Reconcile the map with terminal records before each campaign. Close duplicates, preserve unresolved identities and confirm whether a stored unit belongs in the active or standby register. Keep retired units in history so old parts inquiries do not recreate them as new assets. Report the observation cutoff with the territory release, then give each open question a named owner and a review date.

Asset monitoring: tracking new, removed and altered assets over timeAsset monitoring: tracking new, removed and altered assets over time
Predictive maintenance and condition monitoringPredictive maintenance and condition monitoring
Infrared thermography inspectionInfrared thermography inspection
Motor bearing lubrication and shaft groundingMotor bearing lubrication and shaft grounding

Common mistakes in port equipment market sizing

Adding the crane subtotal to the combined fleet counts the same machines again. Expanding an engine table as if it were a complete equipment table changes the counting unit. Adding a hybrid's engine and energy-storage assembly as separate machines inflates the fleet. Keep a category dictionary and test each source row against it before calculating national ratios.

Applying a mixed-cargo port's forklift population to container ports spreads an unrelated operating mix across the national estimate. Applying the national tractor ratio to a straddle-led terminal produces a different local error. Use product-specific classes for national sizing and the actual handling layout for account qualification. General support equipment belongs in its own population study.

Treating an age-derived retirement flow as a list of approved replacements skips the owner's operating and capital decisions. Treating recorded land ownership as equipment purchasing authority skips the account research. Treating a delivered crane as an active machine skips commissioning status. Each error changes the next commercial action even when the initial map location is correct.

Finally, keep the reference years visible. This analysis uses public inventories from different reporting cycles and retains their published boundaries. A local campaign needs a current reviewed register. Preserve the source-year calculation as the research baseline and record later fleet changes explicitly, with evidence connecting the old and new observations.

Terminal fleet qualification checklist

Release a terminal account when another reviewer can follow the source evidence through the equipment identity to the proposed service or sales action. Keep the completed checklist with the fleet file and attach unresolved items to a person who can close them.

0 of 12 complete

Want this checklist to run itself on every job — with photo proof and a signed record crews can hand the customer? That's FieldOS.

Methodology

Research notes, November 5, 2026: the saved estimate script parses the downloaded public tables. BTS table 7 sums to 570 shore cranes across 25 ports. Its heading says December 2024; its source note describes November 2023 verification. National coverage factors of 1.00, 1.05 and 1.10 add 0%, 5% and 10% outside that frame. These are Anvilfield assumptions. No automatic growth adjustment advances the reference stock to 2026.

The calibration inventories contribute 177 shore cranes and 3,251 core yard machines. Divide each pooled equipment class by the pooled shore count, then multiply by the modeled national shore fleet and yard-density factors of 0.70, 1.00 and 1.40. The local shore counts are 87, 63 and 27; BTS lists 79, 73 and 35 for those ports. Preserve each source's boundary and reporting cycle when forming its ratio. The low and high columns are paired coverage-and-density scenarios.

Source S3 uses the complete-fleet table, including electric equipment. Source S4 has no straddle row, assigned zero here. General forklifts and support machines are excluded throughout. The EPA guidance in S5 establishes inventory scope. Historical median lives in S6 anchor central tractor, handler and RTG planning lives at 12, 16 and 24 years. Anvilfield applies the RTG life to all yard gantries and sets endpoint lives shown in the estimate table. Stable stock and staggered retirement produce the annual flows; shore-crane and straddle replacement are excluded. Rounded totals use unrounded inputs.

The worked case declares its terminal fleets, 75% agreement coverage, annual class-specific labor allowances and 1,400 productive technician hours as Anvilfield planning inputs. Its building-list budget uses the checked public price band. National ranges represent scenario sensitivity. Local acceptance depends on reviewed asset identities, operating status and purchasing records. The $10 to $20 published building-price endpoints set a sensitivity budget for the stated record count; the order quote determines the payable amount.

For local research, PorchRocket's Asset Search prices custom finding and monitoring by the agreed scope; each search is quoted. Request the observed asset, dated evidence, owner of record and unresolved review question in the handoff, then reconcile those findings with the terminal's equipment register.

Public inputSource yearValues usedRole
S1. BTS table 72024 label; 2023 verification note; 2025 publication570 shore cranes; 25 portsNational shore-crane anchor
S2. Los Angeles table 5.12024 inventory; 2025 publication87 shore; 126 yard gantries; 887 tractors; 172 straddles; 228 handlersSelected-class calibration
S3. New York/New Jersey table 2.82023 inventory; 2025 publication63 shore; 88 yard gantries; 431 tractors; 416 straddles; 221 handlersSelected-class calibration
S4. Houston table 5.12023 inventory; 2025 publication27 shore; 116 yard gantries; 451 tractors; 0 straddles; 115 handlersSelected-class calibration; forklifts excluded
S5. EPA inventory guidance2020Equipment scope and machine-specific inventory methodBoundary and record design
S6. EPA table 4-5200912-year tractors; 16-year handlers; 24-year RTGsHistorical life anchors; Anvilfield scenario application
S7-S8. Live PorchRocket offers2026 check$10 to $20 per building; within 48 hours; custom searches quotedBuilding budget and local research scope

Related tools

Next step: Scope a port equipment search

FAQ

How many port cranes does Anvilfield estimate in US container ports?

Anvilfield estimates 600 ship-to-shore container cranes, with a range of 570 to 630. Adding yard gantry cranes produces about 1,710 shore and yard cranes. Those crane classes are included in the combined core fleet.

Does the terminal equipment estimate include forklifts and bulk terminals?

The national estimate covers specialized container equipment: shore cranes, yard gantries, terminal tractors, straddle carriers and container handlers. General forklifts, bulk machinery, conveyors, harbor craft, drayage trucks and off-port equipment require separate population frames.

Are these figures a new national port survey?

They are Anvilfield estimates calculated from public port-by-port crane counts, published local fleet inventories and stated coverage, density and planning-life assumptions. The saved script preserves the inputs and calculations. The source inventories supply observations; Anvilfield supplies the national expansion model.

How are electric and hybrid machines counted?

Count each complete machine once in its operating class and record the power system separately. An electric yard tractor stays in the tractor class. A hybrid RTG stays in the gantry class. Linked component records preserve engine, drive and energy-storage details.

Does replacement exposure mean those machines are ready to buy?

Anvilfield estimates 660 annual replacements across tractors, handlers and yard gantries using stable stock and planning lives. Confirm actual condition, operating duty, agreement coverage and capital authorization before opening a replacement opportunity. The calculation excludes shore cranes and straddles.

Why do local shore-crane counts differ from the BTS table?

The public reports use different reporting cycles and inventory boundaries. The calculation retains shore and yard counts from the same local inventory when forming equipment ratios, then uses BTS for the national crane anchor. The methodology records the local and BTS counts explicitly.

Can aerial imagery establish equipment condition or certification?

Dated imagery supports location, visible classification and change review. Machine documents, site measurements, inspection records and the responsible technical review establish the work scope. Keep the observation and its evidence separate from an equipment acceptance or certification decision.

How should a service company use the national estimate?

Use it to compare fleet scale and equipment classes, then build a reviewed terminal register. Connect each machine to its owner, operator, service scope and next review action. Price the agreement from covered equipment and actual tasks, with access, travel and outage coordination accounted for separately.

People also ask

Sources checked

  • S1. BTS Port Performance Freight Statistics: 2025 Annual Report Source year: 2024 table label; November 2023 verification note; published 2025. Table 7, printed page 33: 25 port rows sum to 570 ship-to-shore gantry cranes. The table heading and source note have different dates; both are retained.
  • S2. Port of Los Angeles: Inventory of Air Emissions CY 2024 Source year: 2024 inventory; published September 2025. Table 5.1, printed page 39: wharf cranes 87; yard gantries 126; yard tractors 887; straddles 172; selected handlers 228. Counts include the listed electric and hybrid equipment.
  • S3. Port Authority of New York and New Jersey: 2023 Multi-Facility Marine Emissions Inventory Source year: 2023 inventory; published January 2025. Table 2.8, printed page 19: shore cranes 63; yard gantries 88; yard tractors 431; straddles 416; selected handlers 221. Use this complete-fleet table rather than an engine-category table with a different tractor count.
  • S4. Port Houston: 2023 Goods Movement Emissions Inventory Source year: 2023 inventory; published September 2025. Table 5.1, printed page 67: shore cranes 27; yard gantries 116; yard tractors 451; selected handlers 115. Straddles are absent from the table and assigned zero. Forklifts and other general equipment are excluded from national expansion.
  • S5. EPA Port Emissions Inventory Guidance Source year: September 2020. Cargo handling equipment sector: inventory boundaries, equipment identity, operating data and separation from on-road trucks and other port emission sectors. Used for scope and method, not a national fleet count.
  • S6. EPA Current Methodologies in Preparing Mobile Source Port-Related Emission Inventories Source year: April 2009. Table 4-5, printed page 4-8: historical median useful-life inputs of 12 years for yard tractors, 16 for selected handler categories and 24 for RTG cranes. Used as planning anchors with Anvilfield scenario endpoints, not current OEM limits.
  • S7. PorchRocket Ground Control Source year: Live offer checked November 5, 2026. Standard commercial building lists, $10 to $20 per building and delivery within 48 hours. Building list offer is separate from a custom crane search.
  • S8. PorchRocket Asset Search Source year: Live offer checked November 5, 2026. Custom visible-asset finding and monitoring, lower 48 as standard, reviewed dated findings with owner of record, supported cadence confirmed in the scope, individually quoted searches.