ANVILFIELD Try FieldOS

Topic hub · Year-round

Water damage and restoration

Leaks, moisture, mold, and structural drying, and the IICRC-driven mitigation that keeps a loss from getting worse.

Calculators for this work

Roofing

Storm and hail damage restoration

How a roofer reads real hail and wind damage, documents the storm claim, and works it ethically and legally: ACV vs RCV, the deductible, supplements, and staying out of public adjusting.

Roofing

Roof coating restoration system

When a fluid-applied coating renews an aging but sound low-slope roof instead of a tear-off, and how the substrate, the prep, the chemistry, and the warranty decide whether it lasts.

Roofing

Silicone roof recoat compatibility

Identify the retained coating, select a documented primer and topcoat route, and release each roof zone with adhesion, moisture and timing records.

Roofing

Roof coating cost worksheet

Measured preparation, wet-insulation repairs, material orders and paid crew time for three equal-area silicone restoration scopes.

Roofing

Roof blister investigation

Identify the failed roof layer, confirm moisture and set a repair boundary that reaches sound material and a reliable tie-in.

Roofing

Infrared roof moisture confirmation

An ASTM C1153 infrared roof survey locates thermal patterns associated with wet insulation, then verifies the findings with invasive testing. For the usual evening survey, scan a dry roof after solar heating, separate moisture patterns from repairs and other heat sources, and confirm suspect areas and comparison locations within the same roof assembly. ASTM C1153-23 covers both ground-based and aerial inspections; the deliverable should connect each mapped anomaly to its thermogram, daylight photograph, confirmation result, and remaining uncertainty.