Field glossary · data center
DCIM
DCIM means data center infrastructure management: the software record connecting a physical asset's identity to its rack position, power connections, sensors and capacity commitments. Test those relationships by moving one device through the system. Its identity and history should survive while its location and connections change. Treat meter readings and reserved capacity as separate fields, and specify which meter boundary governs every power total.
Data center infrastructure management, the database where the floor plan, elevations, and port connectivity live, keyed by the TIA-606 identifiers
Keep the equipment identity when its location changes
NIST SP 800-53 release 5.2.0, control CM-8, calls for an accurate component inventory without duplicate accounting and explains the use of unique component identifiers. This provides a concrete inventory criterion for a DCIM integration. A discovery address or a cabinet coordinate can change while the equipment remains the same physical asset.
An inventory with 240 physical devices and twelve duplicate import records contains 252 rows, overstating the device count by 5%. Preserve a stable asset identifier across a move, and update location, power and network relationships against it. Keep the prior relationships in the change history so the new location does not erase the evidence needed to interpret an earlier event.
Treat sensor context as part of the reading
DMTF's Redfish Sensor schema version 1.14.0 defines ReadingUnits in case-sensitive UCUM notation and PhysicalContext as the affected component or region. It also defines RelatedItem links to the objects served by the sensor. Retain those relationships when importing measurements so an apparently plausible number remains attached to the correct device and physical location.
The same Redfish schema defines ReadingTime as when the reading was acquired from the sensor, separately from when its resource was accessed. Opening a refreshed DCIM screen therefore does not establish that every displayed measurement was newly acquired. Preserve acquisition time when exporting a trend or attaching evidence to a capacity decision.
Aggregate power once at the chosen boundary
A hierarchy showing 100 kW at a parent meter and four child readings of 25 kW each contains two views of the same distributed load. Adding all five readings displays 200 kW. Define the aggregation boundary and treat the parent-child structure as a relationship, rather than treating every imported reading as additional consumption.
NIST CM-8(1) calls for inventory updates during component installations, removals and system updates. Connect those events to the DCIM change record so power and connectivity relationships change with the equipment. Reconcile its persistent identifiers with the physical labeling record after a move. Acceptance should demonstrate that asset identity, sensor context and meter hierarchy survive the same event.
Distinctions
- CMDB
- Tracks configuration items and their relationships. A DCIM integration must identify which system owns each shared field and change event.
- BMS
- A building BMS can supply a cooling alarm to DCIM. The integration must preserve the originating point and affected equipment so the alarm resolves to the correct rack or capacity dependency in DCIM.
Frequently asked questions
Does discovering every IP address create an asset inventory?
Reconcile discovered endpoints to physical assets and persistent identifiers. Multiple interfaces or repeated discovery records can describe the same equipment.
Can I sum every power reading in DCIM?
Choose a common measurement boundary. Parent and child readings in one distribution hierarchy otherwise count the same load more than once.
Sources checked
Also defined as
- Data center infrastructure management, the software that monitors and manages physical infrastructure, assets, and capacity
- Data center infrastructure management, the layer tying facility systems to IT asset, capacity, and power data