Lead-lag

Lead-lag assigns operating priority; spare capacity depends on how many machines the load requires. In a two-pump capacity sequence, the lag pump joins the lead when additional output is needed. In a standby sequence, the second pump substitutes after a failure. Staging demand, proof delay and rotation govern different events, so record each separately when diagnosing a pump that starts late, never joins the lead or fails to change assignments.

A multi-pump control that runs a lead pump and stages lag pumps on as demand climbs, rotating which pump leads to spread wear

Used across 4 Anvilfield field guides, most in Plumbing.
Updated

Does the second pump add flow or replace the lead?

Tekmar's Pump Sequencer 132 separates standby operation from two-stage operation. In standby mode, lost flow proof transfers operation to the backup pump. Tekmar's D 132 requires pump demand, flow proof and second-stage demand, with warm-weather shutdown inactive, before adding the second capacity stage. A second-stage demand indication alone does not establish that all start conditions are satisfied.

Read the mode selection and demand inputs before interpreting a trend showing only one running pump. That condition is expected with a standby arrangement; it has a different meaning when the sequence is demanding a second capacity stage. The water-booster guide explains the pressure application. The controller's mode establishes which behavior to expect from its second output.

Time flow proof separately from rotation and exercise

Tekmar's D 132 instructions, dated April 2010, provide a selectable flow-proof delay of 10 or 30 seconds after a pump output energizes. Failure to establish proof within that selected delay switches the controller to the other pump and activates an alert. The timer ends when the configured proof signal arrives; it does not measure how long the pump holds the lead assignment.

The same Tekmar instructions call for a flow-proof fault when proof remains present four minutes after the pump contacts turn off. A proof indication that never drops warrants attention even when every start appears successful. A stuck indication defeats the distinction between commanded operation and demonstrated operation.

With exercising enabled, Tekmar's 132 energizes a pump output for 10 seconds after three days without operation. That short exercise is separate from both a demand-driven stage and a rotation event. Preserve the exercise setting when explaining a brief run during an otherwise idle period.

Why a scheduled changeover can wait

The D 132 sequence normally rotates assignments with the pumps off; during continuous circulation it waits up to 12 hours to make the rotation. Reading the scheduled interval alone therefore does not establish a missed changeover. Compare the run state and the controller's changeover conditions.

Grundfos's Control MPC instructions 99725671, dated August 2025, describe a different mechanism: once every 24 hours the CU 352 compares running and stopped pumps' accumulated hours and replaces a higher-hour running pump with a lower-hour stopped pump when forced changeover is enabled. Record the controller model and enabled function with a runtime comparison.

Resolve a transfer using command and proof timestamps

At a 10-second proof setting, a lead command at 14:00:00 without proof reaches its transfer point at 14:00:10. If the second pump establishes proof at 14:00:16, its start-to-proof time is six seconds; the system's elapsed time from the first command is 16 seconds. Those values describe different parts of the event. Tekmar's D 132 also shuts off the standby pump if that pump fails to prove within its own delay.

Tekmar permits flow, differential-pressure, current or power switches to supply the 132's proof input. Identify which device is wired to that point. A current-derived proof signal establishes an electrical condition; a separate flow measurement is needed to verify delivered pumping capacity. Label the trend with the actual proof method so a motor-current signal is not reported as measured water flow.

Trend demand, individual pump commands, proof, alerts and mode together in the BMS commissioning record. Where a hydronic pump replacement changes starting behavior, these timestamps separate the controller's waiting interval from the interval between the replacement pump's command and proof.

Sources checked

Also defined as

  • Datacenter: A pump arrangement where one runs and a standby starts on demand or on a failure, a common N+1 form
  • HVAC: Which machine starts first and which follows, rotated to equalize runtime on like equipment